    Determination of Blast Vibration Limits by Direct Strain Measurement

    By Adrian Moore, Alan Richards, Andrew Brodbeck

    Structural blast vibration limits should be based on the strength of the structure, the stress induced by blasting, and a responsible factor of safety. In this paper a methodology that uses direct str

  • SME-ICGCM
    Sub-Surface Cracks Due To Disc Cutter Spacing For Improved Rock Breakage And Ground Control (9409c703-a463-4470-b9b9-4f86b64581d4)

    By N. I. Aziz

    The importance of using disc cutters for rock excavation is reflected by their wide application in hard rock cutting machines such as tunnel boring machines and raise borers. The forces involved in th

    Jan 1, 1992

  • DFI
    Construction Of Large Underground Openings And Use Of Grouts ? Synopsis

    By E. Mongilardi

    The construction of large underground openings through cohesionless or weak cohesive soils and under the water table in particular, often requires a ground improvement to be done from the surface or a

    Jan 1, 2010

  • NIOSH
    RI 8275 Instrument To Measure the Initial Deformation of Rock Around Underground Openings

    By Michael J. Beus

    This Bureau of Mines report describes a tunnel stress relaxation gage (TSR) developed to measure initial radial displacement around full-sized underground openings. The TSR technique was shown to b

    Jan 1, 1978

  • NIOSH
    OFR-26(1)-83 Data Collection And Mathematical Modeling For Predicting Underground Mine Water Inflow

    This study of underground mine water inflow was initiated by the U. S. Bureau of Mines in March 1980. The objective of this study is to evaluate the hydrologic variables associated with surface water

    Jan 1, 1982

  • DFI
    Design And Construction Of An Earth Retaining Structure - Using A Pile In Self-Hardening Grout (PSHG) Wall

    By Allan Sylvester

    Construction of the Shot Tower Metro Station in Baltimore, Maryland was performed in two phases. In the first phase, a contractor was retained to excavate the station in order to construct twin tunnel

    Jan 1, 1997

  • SAIMM
    The Design And Implementation Of The Top Of Block 4 (TOB 4)/Bop Resource At Finsch Mine (A Division Of Central Mines)

    By V. Mathebula

    Paper written on project work carried out in partial fulfilment of B. Tech (Mining Engineering) degree The purpose of this study is to establish whether to mine the Bottom of Pit (BOP)/TOB 4 reserv

    Jan 1, 2004

  • SME
    State Of The Art Of Big Hole Drilling

    By Paul Richardson

    This paper will review several projects completed during the period from 1976 through 1984 which have been carried out utilizing big hole drilling concepts. The projects discussed will be from various

    Jan 1, 1985

  • SME
    Practical Methods Of Shallow Shaft Sinking

    By James J. Brady, Joginder S. Bhore, Robert B. Gordon, Jimmy W. Honeycutt

    The authors of this paper have a combined construction experience of 70 years. They have served as engineers and managers on projects throughout the United States and Canada. Approximately 50 shafts h

    Jan 1, 1985

  • SME
    The Route To More Efficient Blind Shaft Drilling?

    By Colin P. Pigott

    The paper describes a variety of existing techniques and equipment which when combined together permit faster and cheaper drilling of shafts in soft to medium strength formations. Drilling fluid circu

    Jan 1, 1985

  • SME
    Development Of A High Blow Energy Hydraulic Impactor

    By Wm. Ross Wayment, Innes P. Grantmyre

    INTRODUCTION It has been recognized for some time that major changes in mining methods will be required in the near future. Two types of factors contribute to this need for change. Intrinsic factor

    Jan 1, 1976

  • SME
    Drilled Shaft Construction At Crownpoint, New Mexico

    By Hassell E. Hunter

    The Wyoming Mineral-Conoco Crownpoint Project represents the first time that big hole drilling has been exclusively used to develop totally a privately financed mine below a depth of 1000 feet. Thr

    Jan 1, 1983

  • NIOSH
    OFR-123(6)-78 Advancement Of Mine Ventilation Network Analysis From Art To Science - Volume VI Application Of PSU/MVS To The Analysis Of Modifications To Existing Ventilation Systems

    By G. W. Luxbacher

    This volume describes the use of the Penn State Mine Ventilation Simulator (PSU/MVS) to model existing mine ventilation systems and, in addition, to evaluate the effect of system modifications. Ventil

    Jan 1, 1977

  • NIOSH
    RI 3641 Effects Of Carbonaceous Blasting Accessories On Gaseous Products From Explosives

    By E. J. Murphy, John C. Holtz

    "INTRODUCTION Toxic gases in the products from the detonation of explosives are one of the hazards in blasting underground. Investigations by the Bureau of Mines 4/5/ have shown that the oxygen balanc

    May 1, 1942

  • SAIMM
    Underground Mine Scheduling Modelled as a Flow Shop: A Review of Relevant Work and Future Challenges

    By M. Åstrand, M. Johansson

    "Advanced planning and automation are increasingly important in modern mines. Sophisticated methods for long-term mine planning are often used, and the advent of autonomous machines makes the actual o

    Dec 1, 2018

  • IOM3
    Design of mills for developing countries

    By J. C. Loretto

    The philosophy and detail of mill design in developing countries, where it is frequently difficult to obtain experienced, qualified supervision to operate the plant, are discussed. The resulting desig

    Dec 1, 1971

  • NIOSH
    IC 8817 Minerals Health And Safety In-House Research, Development, And Demonstration In Fiscal Year 1980

    This publication summarizes, for all interested parties, the research, development, and demonstration in-house projets programed by the Bureau of Mines for fiscal year 1980 (October 1, 1979 - Septembe

    Jan 1, 1980

  • NIOSH
    IC 8742 Underground Mine Communications (In Four Parts) 1. Mine Telephone Systems

    This Bureau of Mines report is devoted to descriptions of systems that provide in-mine wired telephone service. Although they may incorporate other features, each system described functions to allow o

    Jan 1, 1977

  • NIOSH
    OFR-23(D)-87 Coarse Coal Hydrotransport Testing At The Hydraulic Transport Research Facility - 2-Inch By 0 ROM Coal, 12-Inch Pipeline: R205

    By Michael E. Henderson

    The U.S. Bureau of Mines (BOM) constructed the Hydraulic Transport Research Facility (HTRF) to investigate the hydraulic parameters relating to the transport of coarse coal. To achieve these goals in

    Jan 1, 1985

  • SME
    The U.S. National Waste Terminal Storage Program: Technology Status And Future Plans - I. Introduction

    By Peter L. Hofmann

    Significant quantities of nuclear wastes were first generated in 1944 as a byproduct of the national defense program. To establish the current inventories and future projections of nuclear waste produ

    Jan 1, 1981