Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Conventional Excavation of Connecting Tunnels in C13 Metro Station (Poland–Warsaw—Line 2) - The Complex History of the Construction of Three Connecting Tunnels
By Marco Aurelio Piangatelli, Massimiliano Bringiotti, Ferdinando De Angelis
"The construction of the three connecting tunnels between the east side and the west side of station C13, adjacent to the Vistula river, has a long and complex history, as they cross beneath one of Wa
Jan 1, 2016
-
Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions
By M Norbert, D O’Connor
The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set
Sep 17, 2014
-
Exploring the Benefits of Additional Conveyance Tunnels for the Chicago Area’s Combined Sewer System
By Kevin Fitzpatrick, Carmen Scalise, Patrick Jensen
"The Metropolitan Water Reclamation District of Greater Chicago (MWRDGC) owns and operates the Tunnel and Reservoir Plan (TARP) system which was adopted in 1972. TARP is a network of 110 miles of deep
Jan 1, 2016
-
Settlements Due to Blasting Vibrations
By Werner Bilfinger, Claudio Nahas, Marcelo Waimberg
"INTRODUCTION The so called Porto Maravilha Project consists of the re-urbanization of a 500 ha area in the Rio de Janeiro port region. Several changes in local infrastructure are being implemented, i
Jan 1, 2016
-
A Mechanized Tunnelling Innovation—Ring Pipe Jacking Method (RPJM)
By Cheng Ang, Yun Bai, Zhi Liu
"This paper presents a conceptual design of an innovative tunnelling method named the Ring Pipe Jacking Method (RPJ) which is conducted by the Ring Pipe Jacking Machine (RPJM). The RPJM consists of a
Jan 1, 2016
-
A Designer's Viewpoint of Medium-Support Interaction
By S. N. Chadha
INTRODUCTION The work described here refers to the Genesee River Interceptor Southeast Project. This project is a part of the Combined Sewer Overflow Abatement Program, Phase I, for the Rochester P
Jan 1, 1977
-
An Improved Technique for Predicting Vibration Levels from Tunnel Blasting
By W. J. Birch, M. Kirke
Despite increasing competition from mechanical methods of tunnelling, the drill and blast method is often still the most viable method of excavating tunnels in strong and abrasive rock. To advance a t
Jan 1, 2005
-
Soft Ground Tunnelling in Melbourne - Investigation and Design of the Melbourne Main Reliever
By M Dixon, T OÆShannessy
Melbourne Water (MW) is responsible for a section of existing gravity trunk sewer servicing the Melbourne central business district, Docklands, Port Melbourne and other adjacent areas, known as the Me
Jan 1, 2008
-
Managing Underground Risks in Singapore Through Geotechnical Interpretative Baseline Reports
By L N. Loganathan
Risk exposure in tunnel projects is extremely high due to various factors such as variability of subsurface conditions, selection of inappropriate design and tunnelling methods, improper risk assessme
Jan 1, 2008
-
Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021
By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White
The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame
Jun 13, 2021
-
Impact of High-Speed Operation on Tunnel Planning - NAT2024
By Bernd Hagenah, Petr Pospisil, Colin Santangelo
This paper explores the profound implications of high-speed train operation on tunnel planning, specifically investigating ongoing high-speed rail projects in California and Texas. The paper delves in
Jun 23, 2024
-
The Bypass Tunnel: Excavation, Interliner, and Lining - RETC2021
By George Schmitt, Ted Dowey, Grant Millener, Sean McAndrew, Eric Jordan
The Rondout-West Branch Bypass Tunnel is being built to bypass a substantial leak in New York City’s primary water supply tunnel. The 13,500 foot long tunnel travels 600 feet under the Hudson River th
Jun 13, 2021
-
How Correct are Geostatistical Models in Predicting Soil Transitions? - NAT2022
By Hongjie Yu, Mike Mooney
Transitions between geological/geotechnical soil units have a critical impact on the operation and performance of a tunnel boring machine (TBM). Geostatistics-based probabilistic modeling is used to q
Dec 1, 2022
-
Overcoming Sustainability Challenges for Design and Construction of Urban and Long-Distance Tunnels - NAT2024
By Bernd Hagenah, Eric C. Wang
New tunnels of significant alignment lengths such as mountain tunnels, base tunnels, as well as beneath urban centers pose unique environmental challenges. This paper highlights key environmental cons
Jun 23, 2024
-
Deep Rock Wastewater Tunnel in Delco - NAT2022
By Dafydd Chandler, Milissa Hirst, Charles Hurst, Gary Snyder, Leszek Glodkowski
The Delaware County Regional Water Quality Control Authority (DELCORA) will be adding tunnel infrastructure to its wastewater conveyance system. This program involves the construction of a conveyance/
Dec 1, 2022
-
Understanding the Subsurface Conditions for the Cemetery Brook Drain Tunnel Project - RETC2023
By Frederick McNeill, Mahmood Khwaja, Benjamin Lundsted, David Polcari, Michael S. Schultz, Timothy Clougherty
The City of Manchester, New Hampshire, is embarking on one of its largest public works projects in history to construct a 12,000 foot long, large-diameter, conveyance tunnel through downtown Mancheste
Jun 13, 2023
-
Evaluating Options in Design of the Akron Northside Interceptor Tunnel (NSIT) Tunnel Diversion and Flow Control Structure - NAT2024
By Dominick Mandalari, David Mast, Heather Ullinger, Juan Granja, Amanda Foote
The City of Akron will construct the Northside Interceptor Tunnel (NSIT) project to control and reduce combined sewer overflows. One component of the project a large diameter tunnel diversion / flow c
Jun 23, 2024
-
Northeast Boundary Tunnel Project: First Street Connector Tunnel and Mount Olivet Road Diversion Sewer Design and Construction - RETC2023
By Basilio Giurgola, Jeremiah M. Jezerski, Filippo Azzara, Federico Bonaiuti, Russell H. Lutch
The Northeast Boundary Tunnel Project consists of a 23 ft diameter, 27,000 ft long, CSO tunnel, multiple underground connections, and significant surface works within an urban corridor. The NEBT align
Jun 13, 2023
-
Sumner Tunnel Rehabilitation - NAT2024
By Joe Rigney, Conrad Stacey, David Nowak, Chris Blanchard, Michael Beyer, John Czach
Originally constructed in the 1930s, the 1-mile-long Sumner Tunnel is 31 feet in diameter and carries traffic deep below Boston Harbor, connecting Boston and East Boston. This project includes both de
Jun 23, 2024
-
Can We Mine Yet? Criteria for Grouting Completion in Tunnel Headings - NAT2022
By Adam Bedell, Jack Raymer, Brad Crenshaw
Tunnel contracts often include provisions for pre-excavation probing and grouting for areas ahead of the tunnel heading. If grouting triggers are met, tunneling stops, and grouting is performed. There
Dec 1, 2022