Search Documents

Search Again

Search Again

  • AUSIMM
    Management of Hydrogeological Risk in Tunnelling Projects

    A key driver to the success of a tunnelling project (the project) is the management of hydrogeological risk. The hydrogeological risk, if not managed, may cause significant impacts on the overall perf

    Jan 1, 2008

  • SME
    Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024

    By Madeline Mello, Michael Low, Nick Karlin, Bryce Scofield

    The LA Effluent Outfall Tunnel is the first tunnel in the United States to incorporate post- tensioning into the precast segmental lining. Several unique components were integrated to ensure that the

    Jun 23, 2024

  • SME
    Orientation Of Tunnels Under Jointed Rocks By Using Key Block Theory

    By M. Z. Rashad

    The intersections of numerous joint sets at the surface of tunneling region of Abu-Tartour-Project in Egypt create blocks with irregular shape and size in the rock mass. Most of these blocks are not a

    Jan 1, 1991

  • ISEE
    Seismic Transient with Low Frequencies at Short Distances Case History: Tunnel Blasting in Urban Site at Isola Liri (Italy)

    By Roberto Folchi

    "This article deals with the excavation of a tunnel below the town of Isola LIRI, nearFrosinone, in central Italy. The tunnel was driven into a conglomerate formation, of lacustrine_fluvial origins, c

    Jan 1, 1993

  • SME
    Integration Of Operations And Underground Construction: Sound Transit University Link

    By John Sleavin

    As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove

    Jan 1, 2010

  • SME
    High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case History

    By Joseph J. Diehl, Brian B. Khalighi

    This paper discusses the Queens Water Tunnel, No. 3, Stage 2, being driven by a new Robbins High Performance (HP) Tunnel Boring Machine (TBM).The paper is divided into four sections. In the INTRODUCTI

    Jan 1, 1997

  • SAIMM
    Design Concepts And Support Considerations For Highly Stressed Tunnels In Deep Hard-Rock Mines

    By C. R. Speers, M. I. Forsyth

    The paper describes how stress analyses were used to show the defect of a tunnel's shape on the overstressing potential of its periphery. The best profile was found to be that of a horizontal ell

    Jan 1, 1994

  • SME
    Recent Trends in Procurement of Tunnel Projects in the United Kingdom

    By Richard L. Patterson, Alan P. Finch

    Twenty years ago, when tunnel projects in the UK were generally procured by the public sector, many were completed late and over budget. Now a significant proportion of new infrastructure is devel

    Jan 1, 2003

  • SME
    CP Rail Tunnels In The Rogers Pass, British Columbia, Canada

    By Ronald S. Tanaka

    In the planning stages for a dozen years, the 9.11 mile long Mount Macdonald Tunnel is the focal point of the $600 million dollar Rogers Pass Project. The paper will discuss the construction of the tu

    Jan 1, 1987

  • SME
    Tunnel Boring Machine Concept for Converging Ground

    By Rock M. Poulin, Bruce G. Moulton, Daniel E. Nowak, David T. Cass

    The Yacambu Irrigation Tunnel Project of 34 km, 5 meter diameter circular and horseshoe section, has been under construction since the early 1970's. Notable among the excavation challenges is hig

    Jan 1, 1995

  • SME
    The Development And Use Of Precast Concrete Tunnel Linings

    By Terence G. McCusker

    Precast concrete segmental tunnel linings have been used since at least 1903. More serious attention was devoted to them in England during the World War II steel shortage and they have become increasi

    Jan 1, 1989

  • SME
    Determination Of The Direction Of Tunnels In Jointed Rocks Using Key Block Theory

    By M. Z. Rashad, H. A. El-Sageer

    The intersections of numerous joint sets at the surface of tunnels of the Abu-Tartour project in Egypt create blocks of irregular shape and size in the rock mass. Although most of these blocks are una

    Jan 1, 1993

  • SME
    Groundwater Cut-Off for Jacked Tunnel with Ground Freezing

    By Philip M. Rice, Paul Schmall, Peter W. Deming, Hugh S. Lacy

    A groundwater cut-off is needed to provide a stable face of tunnels to be constructed by jacking precast rectangular tunnel segments beneath commuter rail tracks for the new I-90 extension in Boston,

    Jan 1, 1999

  • AUSIMM
    Tunnelling in Archaean Rocks of the Darling Range, Western Australia

    The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable

    Jan 1, 1976

  • SME
    Bergen Tunnels Rehabilitation–A Success After All

    By St. Mergentime, K. Zeidler, V. Gall

    2001, the New Jersey Transit Authority commissioned the JV Merco-Obayashi with the rehabilitation contract of the approximately 130-year-old, 4,200 ft long, partially brick- lined Bergen North Tunnel.

    Jan 1, 2003

  • SME
    Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington

    By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson

    A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR

    Jan 1, 2005

  • AUSIMM
    The Use of Roadheading Machines in the Construction of the Liverpool Link Line

    By Parkes DB

    The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable

    Jan 1, 1976

  • SME
    Machine Mining For Small Rock Tunnels

    By John A. DesLauriers

    INTRODUCTION This paper will update the status of small sized tunnel boring machines used in both the Mining and Civil Industries. I will mention a) new developments in small size hard ground tunne

    Jan 1, 1981

  • SME
    Tunnelling With Hydraulic Drills At Aabjoera Hydro Electric Plant In Norway

    By Alf Thidemann, Per Marius Nilsen

    Tunnelling with hydraulic drills has been a success in Norway. In the fall of 1976 excavation of tunnels for the development of the Aabjoera scheme was started. Two and a half years later a total of 2

    Jan 1, 1979

  • SME
    The Fort Lawton Parallel Tunnel Seattle, Washington

    By Brian Fulcher

    The Fort Lawton Parallel Tunnel was built in 1990 - 1991 by Morrison Knudsen Corporation (MK) as an integral part of Seattle METRO's planned expansion of the Westpoint Treatment Plant. The projec

    Jan 1, 1993