Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Management of Hydrogeological Risk in Tunnelling Projects
A key driver to the success of a tunnelling project (the project) is the management of hydrogeological risk. The hydrogeological risk, if not managed, may cause significant impacts on the overall perf
Jan 1, 2008
-
Fabrication and Installation of Americas First Post Tensioned Pre-Cast Segmental Tunnel Liner - NAT2024
By Madeline Mello, Michael Low, Nick Karlin, Bryce Scofield
The LA Effluent Outfall Tunnel is the first tunnel in the United States to incorporate post- tensioning into the precast segmental lining. Several unique components were integrated to ensure that the
Jun 23, 2024
-
Orientation Of Tunnels Under Jointed Rocks By Using Key Block Theory
By M. Z. Rashad
The intersections of numerous joint sets at the surface of tunneling region of Abu-Tartour-Project in Egypt create blocks with irregular shape and size in the rock mass. Most of these blocks are not a
Jan 1, 1991
-
Seismic Transient with Low Frequencies at Short Distances Case History: Tunnel Blasting in Urban Site at Isola Liri (Italy)
By Roberto Folchi
"This article deals with the excavation of a tunnel below the town of Isola LIRI, nearFrosinone, in central Italy. The tunnel was driven into a conglomerate formation, of lacustrine_fluvial origins, c
Jan 1, 1993
-
Integration Of Operations And Underground Construction: Sound Transit University Link
By John Sleavin
As part of the Link Light Rail project in Seattle, WA, work was completed at the Pine Street Stub Tunnel (PSST) in early 2007 for the Central Link project. This tunnel was excavated using cut-and-cove
Jan 1, 2010
-
High Performance Tunnel Boring Machine for Queens Water Tunnel, No. 3:A Design and Case History
By Joseph J. Diehl, Brian B. Khalighi
This paper discusses the Queens Water Tunnel, No. 3, Stage 2, being driven by a new Robbins High Performance (HP) Tunnel Boring Machine (TBM).The paper is divided into four sections. In the INTRODUCTI
Jan 1, 1997
-
Design Concepts And Support Considerations For Highly Stressed Tunnels In Deep Hard-Rock Mines
By C. R. Speers, M. I. Forsyth
The paper describes how stress analyses were used to show the defect of a tunnel's shape on the overstressing potential of its periphery. The best profile was found to be that of a horizontal ell
Jan 1, 1994
-
Recent Trends in Procurement of Tunnel Projects in the United Kingdom
By Richard L. Patterson, Alan P. Finch
Twenty years ago, when tunnel projects in the UK were generally procured by the public sector, many were completed late and over budget. Now a significant proportion of new infrastructure is devel
Jan 1, 2003
-
CP Rail Tunnels In The Rogers Pass, British Columbia, Canada
By Ronald S. Tanaka
In the planning stages for a dozen years, the 9.11 mile long Mount Macdonald Tunnel is the focal point of the $600 million dollar Rogers Pass Project. The paper will discuss the construction of the tu
Jan 1, 1987
-
Tunnel Boring Machine Concept for Converging Ground
By Rock M. Poulin, Bruce G. Moulton, Daniel E. Nowak, David T. Cass
The Yacambu Irrigation Tunnel Project of 34 km, 5 meter diameter circular and horseshoe section, has been under construction since the early 1970's. Notable among the excavation challenges is hig
Jan 1, 1995
-
The Development And Use Of Precast Concrete Tunnel Linings
By Terence G. McCusker
Precast concrete segmental tunnel linings have been used since at least 1903. More serious attention was devoted to them in England during the World War II steel shortage and they have become increasi
Jan 1, 1989
-
Determination Of The Direction Of Tunnels In Jointed Rocks Using Key Block Theory
By M. Z. Rashad, H. A. El-Sageer
The intersections of numerous joint sets at the surface of tunnels of the Abu-Tartour project in Egypt create blocks of irregular shape and size in the rock mass. Although most of these blocks are una
Jan 1, 1993
-
Groundwater Cut-Off for Jacked Tunnel with Ground Freezing
By Philip M. Rice, Paul Schmall, Peter W. Deming, Hugh S. Lacy
A groundwater cut-off is needed to provide a stable face of tunnels to be constructed by jacking precast rectangular tunnel segments beneath commuter rail tracks for the new I-90 extension in Boston,
Jan 1, 1999
-
Tunnelling in Archaean Rocks of the Darling Range, Western Australia
The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable
Jan 1, 1976
-
Bergen Tunnels Rehabilitation–A Success After All
By St. Mergentime, K. Zeidler, V. Gall
2001, the New Jersey Transit Authority commissioned the JV Merco-Obayashi with the rehabilitation contract of the approximately 130-year-old, 4,200 ft long, partially brick- lined Bergen North Tunnel.
Jan 1, 2003
-
Predicted versus Actual Obstructions for Two Pipe-Jacked Tunnels of the Henderson CSO, Seattle, Washington
By Dennis Molvik, Roberto J. Guardia, Brad Cowles, Rick Andrews, Robert A. Robinson
A 220-meter (m) segment of the Henderson/ ML King Combined Sewer Overflow(CSO) consists of two 1.8-meter-inside diameter (I.D.) pipe-jacked tunnels that pass beneath Interstate-5 and the BNSF and UPRR
Jan 1, 2005
-
The Use of Roadheading Machines in the Construction of the Liverpool Link Line
By Parkes DB
The excavation of sandstone of generally medium strength for the Liverpool Link Line by Dosco Mark 2A Roadheaders has demonstrated the versatility and good performance of road- headers in suitable
Jan 1, 1976
-
Machine Mining For Small Rock Tunnels
By John A. DesLauriers
INTRODUCTION This paper will update the status of small sized tunnel boring machines used in both the Mining and Civil Industries. I will mention a) new developments in small size hard ground tunne
Jan 1, 1981
-
Tunnelling With Hydraulic Drills At Aabjoera Hydro Electric Plant In Norway
By Alf Thidemann, Per Marius Nilsen
Tunnelling with hydraulic drills has been a success in Norway. In the fall of 1976 excavation of tunnels for the development of the Aabjoera scheme was started. Two and a half years later a total of 2
Jan 1, 1979
-
The Fort Lawton Parallel Tunnel Seattle, Washington
By Brian Fulcher
The Fort Lawton Parallel Tunnel was built in 1990 - 1991 by Morrison Knudsen Corporation (MK) as an integral part of Seattle METRO's planned expansion of the Westpoint Treatment Plant. The projec
Jan 1, 1993