Search Documents

Search Again

Search Again

  • SME
    Geotechnical Investigation of a Fault Zone Using a Horizontal Geotechnical Boring

    By Greg Sanders, Michael Gilbert, James G. Shaughnessy

    "A new raw water intake from the South Holston River to the Kingsport water treatment plant is under construction. The exploration for the 335 meter long horseshoe shaped tunnel design took advantage

    Jan 1, 2016

  • SME
    Istanbul Strait road tube crossing: Challenges, risks and strategies

    By Gordon Clark, Basar Arioglu, Nasri Munfah, Sanja Zlatanic, Tolga Togan

    "The 13.2 m (43 ft) external diameter, double deck Istanbul Strait Road Tube Crossing is one of the most challenging underwater tunnel projects in the world. Subjected to 11 bars of hydrostatic pressu

    Mar 1, 2017

  • DFI
    Jet Grouting for Groundwater Cutoff at Tie-in between Existing Tunnel and New Construction

    By Aaron Evans, Chu E. Ho, Tom Richards

    "This paper describes an innovative case history of using jet grouting to form a groundwater cutoff wall at the interface of a cut-and-cover construction and an existing tunnel. The design of the jet

    Jan 1, 2016

  • SME
    Rapid Excavation Demand In The Coming Decades An Analysis Of The OECD Report

    By T. P. Meloy

    In the last decade increased and prolonged interest has been displayed in the use: of tunneling or rapid excavation to solve many of the urban and industrial problems confronting our society. There ha

    Jan 1, 1970

  • AIME
    Geology and Non-Metallics - Geology of the Moffat Tunnel, Colorado (with Discussion)

    By T. S. Lovering

    The Moffat tunnel passes through the continental divide about 50 miles west of Denver, Colo., on the Denver & Salt Lake R. R.: It is 16 ft. wide, 24 ft. high, and 32,383 ft. long, a distance of a litt

    Jan 1, 1928

  • AUSIMM
    Crafers Highway Tunnels, Adelaide, SA

    By G Brewster

    The Eagle on the Hill tunnels form part of an upgrade of Mt Barker Road, 15 km to the southeast of Adelaide. The upgrade significantly improves safety and reduces delays on this major road, which wind

    Jan 1, 1999

  • CIM
    Design, development, and verfication of a Lovat 7.6-metre full-face tunnel-boring machine

    By R. Lovat, J. A. Hunter

    "The design, development, and verification of the Lovat 7.6metre diameter full-face tunnel-boring machine is reviewed. Programmatic and technical challenges are outlined with a review of the specifica

    Jan 1, 1984

  • SME
    Design Development of the I-35 Capital Express Central Drainage Tunnels - NAT2024

    By Joseph Goessling, Mark Kroncke, James Parkes

    The I-35 Capital Expressway (CapEx) Central Drainage Tunnels will serve as a stormwater collection system for the forthcoming I-35 Capital Express Central reconstruction project through downtown Austi

    Jun 23, 2024

  • SME
    Pawtucket CSO Tunnel Design Build—Construction Project Updates - NAT2024

    By Irwan Halim, Stephane Polycarpe, Brian Hann

    The Narragansett Bay Commission Phase III CSO Program includes construction of the 11,600-foot long, 30-foot ID, deep rock Pawtucket Tunnel in Rhode Island. This paper provides an overview of the Desi

    Jun 23, 2024

  • SME
    Long Distance Tunnelling: Challenges and Trends - NAT2022

    By Karin Bäppler

    Mechanized tunnelling is undoubtedly one of the most innovative disciplines in the international construction industry. Technological progress in the planning and production of most modern infrastruct

    Dec 1, 2022

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021

  • SME
    Design of Montreal Metro Blue Line Extension Tunnel - NAT2022

    By Verya Nasri, Mehdi Bakhshi

    The development of the Montreal metro extension Line 5 -Blue Line- toward the northeast are located between the existing Saint-Michel station and Anjou. It consists of 6-km long two-track tunnel, five

    Dec 1, 2022

  • SME
    Parametric Study of Portal Area Condition for Mountain Tunnel Damaged by Earthquake - NAT2022

    By Hajime Kitamura, Nobuharu Isago, Yuta Yamanishi, Kosuke Kawata, Hiroshi Yagi, Akira Matsuoka

    Mountain tunnels are generally considered to be stable during earthquakes, however, it is known that the portal areas are prone to seismic damages. Characteristics in portals such as the location of t

    Dec 1, 2022

  • SME
    JWPCP Effluent Outfall Tunnel in Los Angeles, California— Anticipated Challenges and Slurry TBM Performance in the Soft Ground Section of the Alignment - NAT2024

    By Martino Scialpi, Miriam Piemontese, Claudio Cimiotti, Matt Kendall, Nicholas Karlin, Roberto Schuerch

    The Los Angeles, California JWPCP effluent outfall tunnel will transport secondary-treated effluent from the Joint Water Pollution Control Plant in Carson to the White Point Manifold. Upon completion

    Jun 23, 2024

  • SME
    Geotechnical Investigation and Design for the Sister Grove Outfall Tunnels - RETC2021

    By Michael Schultz, Gregory Sanders

    In 2017, the North Texas Municipal Water District (NTMWD) initiated the design of the Sister Grove Regional Water Resource Recovery Facility (SGRWRRF) to provide additional treatment capacity for futu

    Jun 13, 2021

  • SME
    South Cobb Tunnel - Cobb County?s Solution To Meeting Future Waste Water Capacity

    By Wojciech Klecan

    Cobb County, located on the northwest side of Atlanta, GA, is continually growing and, like many other metropolitan areas, it needs to increase the capacity of its waste water system to meet future de

    Jan 1, 2009

  • SME
    Building the East-West Cross Drift Tunnel at Yucca Mountain

    By Brian Fulcher

    In April 1997, Kiewit/Parsons Brinckerhoff (K/PB) completed the 7,600-m (25,000-ft) primary access tunnel for the Yucca Mountain, NV proposed high-level nuclear waste site. K/PB then began boring an

    Jan 1, 2000

  • SME
    Environmental Impact of Groundwater Discharge During Tunnel Construction

    By James A. Pappas, Francis L. Fong, Tracy K. Lundin

    The impact of environmental regulations on the quality of tunnel groundwater discharges is examined in this paper. Tunnel contractors usually depend on specialty contractors or outside consultants to

    Jan 1, 1995

  • SME
    Conditions Encountered in the Construction of Stanley Canyon Tunnel Colorado Springs, Colorado

    By Levent Ozdemir, Roy H. Spitzer, Don W. Deere, John B. Blyler

    This paper documents the construction of the Stanley Canyon Tunnel, the geologic conditions encountered, boreability of the rock, and the impacts of the conditions encountered on the construction. The

    Jan 1, 1995

  • SME
    Conceptual Design Of The First Segment Of Tunnels For The Superconducting Super Collider Project The Prototype Installation Facility

    By Jon Y. Kaneshiro, Donald W. Scapuzzi

    The primary purpose of the Prototype Installation Facility (PIF) for the Superconducting Super Collider (SSC) in this conceptual design was to test the magnets and other physics equipment. PIF was loc

    Jan 1, 1991