Design of Precast Segmental Tunnel Lining for Pawtucket CSO Tunnel Project - NAT2022
By Irwan Halim, Seung Han Kim
This paper will describe design of precast segmental tunnel lining for the Pawtucket CSO Tunnel Project in Providence, Rhode Island. The tunnel is 11,700 LF long with 30-foot finished diameter to be c
Dec 1, 2022
-
Analysis and Design of Tunnel Lining Through a Potentially Displaceable Fault - NAT2022
By Theodore Feldsher, Seung Han Kim, Mourad Attalla, John Roadifer, Chu-Chieh Jay Lin
Lifelines in seismic regions of the world seldom can escape crossing active faults. Cities in California have been mitigating this risk by constructing improved fault crossings. This paper discusses t
Dec 1, 2022
-
Grouting Cast-In-Place Concrete Tunnel Liners— What Have We Learned? - RETC2021
By Adam Bedell, Paul Derby, Brad Crenshaw
Modified contact grouting was introduced almost 15 years ago as a methodology combining traditional contact grouting and consolidation grouting to address groundwater infiltration into hard rock tunne
Jun 13, 2021
-
Major Rehabilitation of the Montreal 55 Years Old Lafontaine Immersed Tube Highway Tunnel—Design Considerations - RETC2023
By Laurent Rus, Bakar Amara, Jean Habimana
The La Fontaine Tunnel in Montreal, Quebec is currently undergoing major structural rehabilitation work and systems upgrade work to comply with current codes, standards and best practices in fire life
Jun 13, 2023
-
The Machine Within a Machine: TBM Innovation in Vancouver, British Columbia, Canada - NAT2022
By B. Catalano, D. Ifrim
The Annacis Island Outfall Project includes two TBM bored tunnels with face pressures above 3.5 bar, with an internal diameter of 4.2 metres. This paper discusses the innovative approach to TBM tunnel
Dec 1, 2022
-
Impacts Of The No-Blasting Specification On The Deep Tunnel Project, Chicago, Illinois
By V. Rajaram
The Metropolitan Water Reclamation District of Greater Chicago (MWRD) imposed a no-blasting specification (blasting is restricted to the construction shaft and shaft bottom or boot) on the Deep Tunnel
Jan 1, 1991
-
Shaft Construction in Glacial Overburden and Karstic Limestone on the Lower Olentangy Tunnel Project - NAT2024
By Jeremy Cawley, Horry Parker Jr., Clint Wilson
The 5180 m EPBM drive on the Lower Olentangy Tunnel (LOT) is predominantly within glacial overburden. To connect LOT with the existing OARS deep tunnel in limestone bedrock, the upper 15 m inside diam
Jun 23, 2024
-
Ultra-Long Tunnel Drive with TBM for the Construction of the Mineral Transport for the Woodsmith Project Polyhalite Mine - NAT2024
By Karin Bäppler
A new polyhalite fertilizer mine is currently being developed in the UK by Anglo American Crop Nutrients. The project includes the construction of a Mineral Transport Tunnel almost 37 kms long to hous
Jun 23, 2024
-
TBM Breakthroughs in Pressurized Conditions—Three Rivers Protection and Overflow Reduction Tunnel (3RPORT) and Northeast Boundary Tunnel (NEBT) Projects - NAT2022
By Francesco Chiappalone, Filippo Azzarà, Raffaele Aliberti, Daniele Nebbia, Lance Waddell
As part of the 3RPORT and NEBT Projects, 5-mile Combined Sewer Overflow Tunnels were excavated with a 19 ft diameter Slurry and 26 ft diameter EPB Tunnel Boring Machines. Due to the difficult geologic
Dec 1, 2022
-
TBM Breakthrough in Pressurized Conditions—Ship Canal Water Quality Project (SCWQP) - NAT2024
By Francesco Chiappalone, Marco Invernizzi, Franco Gasperin, Fabrizio Fara
As part of the Ship Canal Water Quality Project, 2.7-mile Combined Sewer Overflow tunnel is excavated with a 21.5-foot diameter EPB Tunnel Boring Machine. Due to the difficult geological and hydrogeol
Jun 23, 2024
-
Evaluating the Impact of DSC’s on TBM Performance in Devonian Dolomite - NAT2022
By Greg Colzani, Emily Thompson
The 3RPORT Project, includes a 5-mile tunnel excavated by a 19-foot diameter slurry Tunnel Boring Machine below the city of Fort Wayne, IN. The Geotechnical Baseline Report (GBR) indicated vuggy to ma
Dec 1, 2022
-
Tunnelling '94, 7th international tunnelling symposium held in London, 5-7 July 1994: technical summary
By M. P. O'Reilly
A personal overview and assessment is given of the 42 papers delivered over the three days of the symposium. As well as 18 from the UK there were presentations from 16 other countries; 20 were on rock
Jun 16, 1905
-
Tunnel Construction For The Muck Valley Hydro Project
By Jorge Martinez
The Muck Valley Hydroelectric Project in Northeastern California required construction of a 3.65 meter tunnel through 6,623 meters of mixed volcanic flow deposits within a critical time frame. As Engi
Jan 1, 1989
-
Small Diameter Tunnels - An Overview
By Charles H. Arnold
This topic addresses historic and current techniques of excavating, supporting and lining tunnels of 4 m (13.1 ft) and smaller. Special considerations relate to the economics of working in close qu
Jan 1, 1981
-
Kemano Power Tunnel
By Kenneth R. Dickson, I. Michael Gowring, Gary M. Davey
The Kemano Power Tunnel is currently being constructed by a joint venture of Atkinson, Kiewit, and Commonwealth. The 5.73 m diameter, 16.1 km long tunnel is part of the Kemano Completion Project in Br
Jan 1, 1991
-
Impacts Of The No- Blasting Specification On The Deep Tunnel Project Chicago, IL
By V. Rajaram, D. P. O’Connor, L. Sakamoto
In 1988, the Metropolitan Water Reclamation District of Greater Chicago (MWRD) imposed a no-blasting specification (blasting is restricted to the construction shaft and shaft bottom or boot) on the De
Jan 1, 1993
-
The Boodex Method–A Way to Overcome Locally Very Poor Ground Conditions in Tunnelling
By Gunnar Nord
Shifting ground conditions when tunnelling often call for different methods of attacking the tunnel face. In order to overcome problems with local unstable soft ground in a hard rock tunnelling projec
Jan 1, 2003
-
Construction of the Brunswick Street Rail Tunnels
The paper, one of two papers on the Queensland Railways Brunswick Street tunnels presented at the VIII Australian Tunnelling conference, describes documentation, tendering and construction aspects.Ten
Jan 1, 1993
-
Rapid Advance - 113 Foot Raise in 3.5 Shifts
By Mike McGill, Steven P. Case, Mark Spaulding
The General Crushed Stone Company at Doswell VA. decided to open a new pit to expand their reserves. The elevation of the property was 136 feet above the present primary crusher. The project required
Jan 1, 1993
-
Drill and Blast Operations and Water Control Measures atLake Mead Intake No. 2
By Richard W. Kimball, Richard F. Coon
This paper describes drill and blast excavation and groundwater control measures at the Lake Mead Intake No. 2 project. The construction includes a deep access shaft, intake shaft, surge chamber, fore
Jan 1, 1999