  • CIM
    Numerical Modeling of Brittle Rock Failure Under Dynamic Stress Loading

    By N. Golchinfar

    Tunnels in deep mines are subjected to high stresses. Fracture and failure of the rock mass around an opening can occur when mining-induced stresses are high. In burst-prone grounds, mining-induced se

    Aug 1, 2013

  • SME
    Construction of the" Passante Ferroviario" Link in Milano, Lots 3p - 5p .6p Excavation by Large Earth Pressure Balanced Shield with Chemical Foam Injection

    By P. Marcheselli, Jean-Yves Peron

    A twin tube tunnel of 2 000 meters long and an internal diameter of 6.90 m has been excavated through alluvial ground, with low overburden, using a 8.0 m diameter Earth Pressure Balanced tunneling mac

    Jan 1, 1995

  • SAIMM
    The Design Of Tunnel Support In Deep Hard-Rock Mines Under Quasistatic Conditions

    By C. R. Speers

    The induced elastic stresses in the sidewalls of gold-mining tunnels at a depth of 4000 m in the Witwatersrand exceed the peak compressive strength of even the best-quality quartzite rocks. Laboratory

    Jan 1, 1996

  • SME
    Groundwater Control for Shaft and Tunnel Construction inSoft Ground at West Leg Interceptor Contracts 1R and 2,Cleveland, Ohio

    By Robert J. Auber, Thomas R. Scotese

    The West Leg Interceptor is part of a new sanitary sewer system in the southwest suburbs of Cleveland. The first two construction contracts were excavated in glacial soils varying from hard tills to p

    Jan 1, 1999

  • SME
    Advanced Techniques For Rapidly Placing Concrete Linings In Tunnels And Shafts

    By Kenneth R. Maser

    In the past 30 years, great advances have taken place in the development of tunnel boring machines, raise drills, large diameter drills and blind shaft borers that have revolutionized the shaft sinkin

    Jan 1, 1981

  • SME
    The Threshold Of The Seventies The East 63rd Street Tunnel

    By Eugene F. Casey

    The next ten to fifteen years will be exciting ones for the construction industry because three city agencies alone have started or will start, on tremendous expansion programs, the cost of which will

    Jan 1, 1997

  • SME
    Second Manapouri Tailrace Tunnel Not Just “A Walk in the Park”

    By Don Macfarlane, Brian Heer, Tom Martin

    The Manapouri Power Station, commisioned in 1969, is located in Fiordland National Park in the South Island of New Zealand. It is the country’s largest hydro power scheme and can generate 700MW of ele

    Jan 1, 2003

  • AIME
    CAVS/Stealth Simulations Of Tunnel Response In Jointed Rock

    By Michael B. Gross

    A numerical study of the vulnerability of unlined tunnels in jointed rock has been performed with the STEALTH computer program, using the CAVS model for jointed rock. CAVS, for Cracking And Void Strai

    Jan 1, 1984

  • SME
    Wind Tunnel Modelling Of Airflow And Pollutant Concentration In A Large Open Pit Mine

    By Jianliang Li, Xi Peng, Guorong Lu

    This paper describes a wind tunnel modelling study on airflow and pollutant concentration in a large open pit mine located in southern China. A 1:1000 scale model of the surface mine was fabricated an

    Jan 1, 1993

  • SME
    Fully Mechanized Tunnelling Machine And Method To Cope With The Widest Range Of Ground Conditions-Experiences With A Hard Rock Prototype Machine

    By Carlo Grandori

    Foreword In loose ground and soft rock formations, mechanical tunnel boring is necessarily dependent on the adoption of shield machines and the application of adequate support or lining structures.

    Jan 1, 1976

  • AUSIMM
    The New Latent Conditions Clause in the Recent as 2124-1986, General Conditions of Contract and its Application in Tunnelling Contracts

    The latent conditions clause in various general conditions of contract have traditionally proved to be a source of significant disputes in tunnelling contracts, even when extensive geotechnical i

    Jan 1, 1987

  • AUSIMM
    Automatic Tunnelling Method Using Quick-Hardening Resin Mortar

    Nippon Telegraph and Telephone Corporation (NTT) developed a new construction method (the M-2 method) that could drive a long, curved small-diameter tunnel (4>1.2 m) without human labor. This meth

    Jan 1, 1987

  • AUSIMM
    Extending the U5 in Berlin via a Shield Driven Tunnel

    By F Anthes, U Barow

    Two tunnels are being bored using a æHydroshieldÆ in section 3.1 of the extension of the Underground railway line 5. At the end of the two tunnels, directly in front of the Hotel Adlon, the shields ca

    Jan 1, 1999

  • AUSIMM
    High Quality Performance of Segmental Lined Tunnels

    Tunnels are being built around the world using TBMs and prefabricated segments or in situ concrete as linings. Clients demand high quality of these linings to guarantee a long-term stability and densi

    Jan 1, 1999

  • SME
    NATM Usage In Difficult Ground Conditions

    By Heinz Distelmeier

    The New Austrian Tunneling Method was, as is well known, developed from conventional rock tunnelling. In Germany about 10 years ago the NATM began to be applied to partially stable soils by incorporat

    Jan 1, 1983

  • SME
    The Atlanta Research Chamber

    By Don Rose

    I. INTRODUCTION The Atlanta Research Chamber is an UMTA-sponsored applied research facility studying tunnel design, excavation and support systems. It is located directly below Peachtree Street in

    Jan 1, 1979

  • SME
    Small Scale Model Testing A New Approach In TBM Development

    By Pieter Barendsen, Olivier Dubugnon

    INTRODUCTION There are three fronts on which development efforts are being concentrated to extend the application domain of Tunnel Boring Machines (TBM), which is potentially very large - Assessme

    Jan 1, 1985

  • SME
    Computer Controlled Jumbos. State Of The Art.

    By Thorvald Wetlesen

    Computer controlled drilling is now proven technology. It was first introduced by the development of the Furuholmen system for a prototype three boom tunneling jumbo in Norway in 1978. Now, 13 rigs wi

    Jan 1, 1989

  • SME
    Design-Build: Elevating Partnering to a Higher Level

    By Curtis A. Pledger, H. Lee Wimmer, I. Michael Gowring

    The Upper Diamond Fork Project, as part of the Central Utah Project Completion Act, conveys water six miles from the existing Sixth Water Aqueduct to the Diamond Fork Pipeline. During design, a Value

    Jan 1, 2003

  • SME
    Design Methodology Used for the Lake Mathews Outlet Facilities Project

    By S. Dubnewych, S. Kieffer, M. T. McRae, R. R. Redd

    The seismic vulnerability of the existing outlet tower at Lake Mathews reservoir, located in Riverside County, California, necessitated the design of a new outlet facility to assure serviceability of

    Jan 1, 1999