Excavation And Support Of A Water Tunnel Through The Hayward Fault Zone
By Sarah Holtz Wilson, Kenneth Rossi, Carl R. Handford, David F. Tsztoo
The East Bay Municipal Utility District’s Claremont Tunnel is an 18,000-foot long water tunnel that crosses the Hayward Fault zone near Oakland, California. It was originally completed in 1929. This p
Jan 1, 2007
-
Case History Of The Wachovia?Knight Theater Pedestrian Tunnels
By Eric Eisold
The Wachovia Headquarters and Arts and Cultural Campus project in Charlotte, NC includes a 1.5 million square foot, 48-story office tower, two museums, an Afro-American cultural center and a 1,200 sea
-
Geotechnical Considerations for the Final Design of the Detroit Upper Rouge Tunnel CSO Project
By Jean Habimana
The Detroit Upper Rouge Tunnel CSO Control Project will capture and store up to 201 MG of combined sewer overflow from 28 outfalls in Detroit, Dearborn Heights and Redford Township during wet-weather
Jan 1, 2008
-
Initial Support Design for Tunnels in Horizontally Bedded Sedimentary Rock
By Irwan S. Halim
For tunnels in horizontally bedded rock, geologic factors affect the selection and design of the initial supports, including the rock propensity toward parting along bedding and the resulting high pot
Jan 1, 2008
-
Electrical Resistivity: An Answer to the Challenges Raised by the Design of a 17 Km-long Tunnel in the Andes
By Farrukh M. Mazhar, Philippe P. Martin
Electrical Vertical Sounding (EVS) profiling has proven to be a valuable tool to set the alignment and guide the design of a 17 km-long, 4.7m diameter water-conveyance tunnel in the Peruvian Andes at
Jan 1, 2003
-
Developments For Mitigating Measures From Deep Shafts Of North/South-Line Amsterdam
By Klaus Pöllath
This paper describes mitigating measures and the design of compensation grouting which will be executed from deep shafts of the Amsterdam North/South Metro line project. Due to the specific conditions
Jan 1, 2006
-
Northside Storage Tunnel Project, Sydney: Tunnelling and Groundwater Control Beneath the Middle Harbour
By R. A. Gee, G. B. Ashton, S. T. Warren, P. N. Groves
Northside Storage Tunnel provides 500 megalitres (Ml) (130 million gallons) of storage capacity to capture stormwater/sewage overflows into Sydney Harbour. The6.6 m diameter TBM driven tunnel traverse
Jan 1, 2001
-
OFR-111-80 Rapid Excavation Of Rock With Small Charges Of High Explosive
By G. B. Clark
One portion of this project was to test a blast shield and to design some features for a novel tunneling method termed the Automated Drill and Blast System (ADBS). The ADBS tunneling concept was devel
Jan 1, 1979
-
Ground Investigation and Tunnel Design for the Liantang/Heung Yuen Wai Boundary Control Point and Associated Works
By Guy Bridges, Elton Ko, Cheng Ting Ning, Owen Ng, Giovanni Chang, Robert Anderson
"PROJECT OVERVIEWThe Liantang/Heung Yuen Wai Boundary Control Point (BCP) and Associated Works will be the seventhland crossing between Shenzhen and the Hong Kong Special Administrative Region (HKSAR)
Jan 1, 2016
-
The 3D Geological Model of the Karavanke Tunnel, Using Leapfrog Geo
By Tina Živec, Žibertm Marko
"Civil design has changed in many ways using BIM (Building Information Modelling) technology in its most recent form. Such a technological breakthrough has not been successful so far in traditional or
Jan 1, 2016
-
Generalization Of The Ground Reaction Curve Concept
By Emmanuel Detournay, Charles Fairhurst
A method is proposed for computing (a possible solution of) the ground reaction curve, for use in tunnel support analysis, in cases where the initial stress field is not hydrostatic. Rock around a cir
Jan 1, 1982
-
Coupled hydromechanical modelling of surface subsidence in crystalline rock masses due to tunnel drainage
By C. Zangerl, K. F. Evans, S. Loew
ABSTRACT: Settlements above fractured crystalline rock masses are rarely observed and in the past, geotechnical engineers would not expect substantial subsidence to occur in association with a deep tu
Jan 1, 2003
-
Shallow Microtunneling below a Critical Runway
By Matthew Grzelak, Gulsah Erinc, David R. Chapman
"The third phase of the Bagram Drainage System project at Bagram Air Force Base in Afghanistan included construction of a shallow, 540-m long, 1.8-m inside diameter drainage tunnel. The tunnel penetra
Jan 1, 2016
-
Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus
By M Norbert, P Mok
The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double
Sep 17, 2014
-
A Model to Predict the Performance of EPB-TBMs in a Complex Geology in Istanbul
By Aydin Shaterpour Mamaghani, Cemal Balci, Nuh Bilgin, Mucahit Namli, Hanifi Copur
"It is expected that more than 10 Billion USD will be spent in Istanbul in coming years on tunnel boring especially with EPB-TBMs. However, the geology of Istanbul is very complex. Geologic formations
Jan 1, 2016
-
DC Water First Street Tunnel – Integrated Engineering and Construction
By Stephen Njoloma, Ivan Hee, Ravi Jain, Mina Shinouda
"INTRODUCTION DC Water’s First Street Tunnel (FST) is comprised of a collaborative effort between DC Water, DC Water’s Project Consultants Organization (PCO) led by Greeley & Hansen and McMillen Jacob
Jan 1, 2016
-
Sequential Excavation Method with Ground Freezing for DC Water’s First Street Tunnel
By Stephen Njoloma, William Bracken, Harald Cordes, Ivan Hee
"DC Water’s First Street Tunnel (FST) is part of the $2.6 billion Clean Rivers Project designed to reduce the occurrence of combined sewer overflows into local waterways. Due to flood events in the Bl
Jan 3, 2018
-
Mechanized Tunnelling Driving Toronto’s Big Move - Eglinton–Scarborough Crosstown Tunnel Construction (ECLC1-15)
By Osamu Nishikokura, Jumpei Yamashita, Darrell Liebno, Malcolm Sheehan
"The Eglinton-Scarborough Crosstown Project builds a 19km LRT corridor that includes a 10km underground portion, between Keele Street and Laird Drive. The West Tunnel Contract (ECLC1-15) includes 6.5k
Jan 1, 2016
-
Challenges and Solutions related to the Interaction of Soil Conditioning and Main Drive on Large Diameter EPB TBM’s - A Case History
By Jens Classen
"GENERAL PROJECT DATA The Sparvo Tunnel belongs to “Variante di Valico” project, a new 65 km highway link between Bologna and Florence, designed to renew the existing A1 route and to connect in a fast
Jan 1, 2016
-
The Use of Risk Analysis to Achieve Consistency in the Fire and Life Safety Design of Road Tunnels
According to the Australian Bureau of Statistics, fatalities from road transport accidents represented an average of over 97 per cent of all transport related accidents between 1997 and 2002. With inc
Jan 1, 2008