Search Documents

Search Again

Search Again

  • AUSIMM
    Underground Extension of the FGC Line in Sabadell through Cemented Soils

    By R Justa Cámara, J María Bertrán Llop

    "The need for suitable geotechnical characterisation of the rock mass for underground construction is evident. The enlargement project of Railways of the Generalitat of Catalunya (FGC) in Sabadell is

    Sep 17, 2014

  • SME
    Unprecedented In-Tunnel Diameter Conversion of the Largest Hard Rock TBM in the U.S. - NAT2022

    By Evan Brinkerhoff, Steve Chorley

    The largest hard rock TBM ever to bore in the USA, an 11.6 m diameter Robbins Main Beam TBM, recently underwent a planned in-tunnel diameter change to a more compact 9.9 meters. The first-of-itskind c

    Dec 1, 2022

  • SME
    Deep Portal Shafts of the Annacis Island Outfall Tunnels— Building on Pacific Northwest Shaft Design Experience - RETC2021

    By John Newby, Ulf Gwildis, Fred Marquis

    From the Brightwater Conveyance System in Seattle to the Second Narrows Water Supply Tunnel in Vancouver, BC, the design and construction of deep-lying tunnels in the Pacific Northwest often require t

    Jun 13, 2021

  • SME
    EPB Bypass and Hanging of 2.6 m Dia. Sewer under Live Flow Conditions

    By Matthew Geary, Stephen J. Marino, Jordan A. Schreiner

    "INTRODUCTION Project Overview The Southeast Collector (SeC) is a new 15km long 3.0m internal diameter wastewater tunnel designed by Hatch Mott MacDonald (HMM) that twins the existing 2.6m diameter Yo

    Jan 1, 2016

  • SME
    Design and Engineering during the Construction of Los Leones Station (Line 6, Santiago Subway, Chile)

    By Jaime Adasme, Héctor González, Benjamín Celada

    "INTRODUCTION Santiago de Chile is a 7 million inhabitant city which has a 103 Km long subway network operated since 1975 by Metro S.A. This network is used on a daily basis by 2.3 million people. In

    Jan 1, 2016

  • SME
    Unique Challenges for the Construction of PATH’s Exchange Place Cross-Passage Tunnel - NAT2022

    By Todd Kilduff, James Grillo, Shrey Arora

    In efforts to improve ingress/egress from the existing subway platforms in PATH’s Exchange Place Station, a new 18-foot horseshoe cross-passage tunnel was constructed by Walsh Construction who retaine

    Dec 1, 2022

  • SME
    Applications of Artificial Intelligence in Tunnel Design and Construction - NAT2022

    By Gunjan R. Bhattarai, Kumar Bhattarai

    Recently, there has been an enormous increase of interest in artificial intelligence (AI), machine learning (ML), and their applications by researchers, government agencies, and the underground constr

    Dec 1, 2022

  • SME
    To Swell or Not to Swell—Design of Underground Structures in the Presence of Swelling Clays - NAT2024

    By Daniel Maine

    Swelling clay soils have been problematic to many types of infrastructure in the United States. However, their impact on underground construction is often misunderstood. The use of swell pressures in

    Jun 23, 2024

  • DFI
    Holistic Thermal Assessment And Control Of Ground Freezing For A New Underground Station

    By Christian Leble, Dr. -Ing. Jakob Vogelsang, Dr. -Ing. Oksana Solt, Dipl. -Ing. Joachim Meier, Dr. -Ing. Wolfgang Orth

    In the course of closing the gap between the Brandenburg Gate and Alexanderplatz, the Museum Island station was built by Implenia Construction GmbH. The tunneling for the platform hall took place on a

    May 1, 2022

  • SME
    Unique Aspects of Remote High Altitude Water Tunnel Repair - NAT2024

    By David Jurich, Ed Perko, Jacob Prezkuta

    Numerous Colorado mountain tunnels that date to the late 1800s convey water to the farming and urban communities of the eastern Front Range. Repairs to these remote facilities, often located in public

    Jun 23, 2024

  • SAIMM
    Book review

    Tunnel Construction 90. London, Institution of Mining and Metallurgy, 1990. Reviewer: J.A. Cruise This is the published volume of papers presented at the Tunnel Construction 90 Conference, whic

    Jan 1, 1991

  • SME
    Re-Entrainment Of Coal Dust Particles: Wind Tunnel And In-Mine Studies (58089787-9484-4f12-b082-1f7f0e4fae1f)

    By S. Shankar

    Available literature on the effect of re-entrainment on overall airborne dust concentration in mine airways or the fundamental mechanisms of coal dust re-entrainment in mine atmosphere is scant. There

    Jan 1, 1995

  • SME
    Rail Systems Approach to Design Fires

    By Peter Johnson, David Barber, Lachlan Henderson

    "Within underground portions of metro rail networks the traditional approach to a design fire has been to assume a worst credible railcar fire and develop ventilation and egress measures for life safe

    Jan 1, 2016

  • SME
    Missouri River Intake Screen Structure and Tunnel: Overcoming Underground Challenges to Build Vital Infrastructure - RETC2023

    By Ryan Ward

    The Missouri River Intake Screen Structure and Tunnel (MRISST) is one phase of the Red River Valley Water Supply Project (RRVWSP), a vital piece of infrastructure in the state of North Dakota to trans

    Jun 13, 2023

  • AUSIMM
    Analysis of Stability and Design of Face Support for Cross Passages – Waterview Connection Tunnels, Auckland, New?Zealand

    By M G. Wansbone, R Bhargava

    The inferred ground conditions for the proposed mined cross passages at the northern end of the Waterview Connection tunnels consist of an overburden of alluvial and residual soils, with mixed face ge

    Sep 17, 2014

  • CIM
    Underground Structures in Swelling Rocks

    By M. E. Bilir

    In this paper, we review cases in which dramatic and visual swelling problems are experienced in underground structures. Swelling rocks have caused many problems in underground engineering projects. T

    Aug 1, 2013

  • SME
    Quantitative Description and Definition of Soft Rock Tunnel

    By Guangming Zhao, Nianjie Ma, Demao Guo, Denghong Chen, Yingming Li

    Based on the mechanical essence that large-scale plastic failure zone appears in all or part of surrounding rock in soft rock roadway, the numerical simulation method is used to study the rectangular

    Jun 25, 2024

  • SME
    Rehabilitation of New Croton Aqueduct Shafts

    By W. James Marold

    The New Croton Aqueduct (NCA) was the first major water supply tunnel for New York City. The 50-km (31-mi) long tunnel has 33 open shafts 6 m (20 ft) to 121 m (397 ft) deep. The tunnel and shafts are

    Jan 1, 2008

  • SME
    Suppressing Dust during Tunnel Construction Using Automated Mist Technology

    By Mike Lewis

    "Descending several stories down a metal staircase into a shaft spanning a quarter city block -- soon to become Roosevelt Light Rail Station in Seattle, WA -- visitors are greeted with four perfectly

    Jan 9, 2017

  • SME
    Design of a Laboratory Scale Wind Tunnel for Studying of Mine Fires

    By K. D. Luxbacher, J. T. Davis

    "A wind tunnel was designed to examine air flow, heat transfer and layering near an active fire at a working face. This tunnel simulates an active entry in an underground coal mine including an attach

    Jan 1, 2017