    The Design and Installation of a Booster Fan at Tahmoor Colliery

    By M Ogle

    "Booster fans are relatively rare in Australian coal mines. However, as mines become progressivelydeeper it is likely that such fans will be increasingly adopted as a method to sustain or improve the

    Jun 1, 2012

  • AUSIMM
    Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine

    By C A. Brannon, C A. Dipas, H A. Vega, D Villa

    The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full

    Oct 16, 2017

  • AUSIMM
    Assessing Contaminant Risk Associated with the use of Mine Water for Dust Suppression

    By C Gimber

    Dust suppression is an important environmental control in most mining operations. The poorest quality water within a mine site is often used for dust suppression since it provides an effective means o

    Nov 26, 2013

  • AUSIMM
    Project Evaluation and Valuation – An Investor’s Golden Rule

    By L I. Rozman

    "There have always been development projects that fall short of expectations. In the last decade, we have seen more than the usual number of mining and oil/gas development projects taking significantl

    Mar 8, 2016

  • AUSIMM
    Commercial Underground Space – Planned Development for the Future

    By A C. Robertson

    World urban expansion puts constraints on the available land surface area of our major cities both for accommodating people as well as providing infrastructure and services whilst at the same time att

    Sep 17, 2014

  • AUSIMM
    Geometallurgical Characterisation of a Tailings Storage Facility – A Novel Approach

    By T Napier-Munn, E Louwrens, L Keeney

    Geometallurgical characterisation of ore deposits is accepted practice in some parts of the mining industry today. Its primary aim is to provide constrained inputs that reflect inherent geological var

    Jul 27, 2015

  • AUSIMM
    CFD modelling of slag fuming, with focus on freeze-lining formation

    By N Voller, A Ishmurzin, G Hackl, M Wu, A Kharicha, M Chintinne, C M. G Rodrigues, A Ludwig

    Slag fuming (SF) is a critical process for recycling zinc-containing slags, but the corrosive nature of molten slag poses challenges to the reactor durability. The freeze-lining (FL) technique offers

    Aug 21, 2024

  • AUSIMM
    The Contribution of Air-Deck Blasting to Open Pit Mining Economics

    By T Laing, M A. Abdalla, P Hagan

    Open pit operators are facing a number of challenges in the area of blasting and blasting processes, such as wall control, quality of fragmentation, explosives consumption and vibration. Remaining fin

    Sep 18, 2012

  • AUSIMM
    Pre-concentration via waste rejection based on fragment size – Olympic Dam case study

    By K Ehrig, V Liebezeit, Y Li, B Pewkliang, M Smith, E Macmillan

    Pre-concentration of low grade ores via the rejection of low/no value materials based on fragment size is the subject of many published papers and studies over the past decade. However, the possibilit

    Nov 10, 2020

  • AUSIMM
    Classified Tailings as Part of an Integrated Regional Support System

    Western Deep Levels, a seismically active deep level gold mine, started placing backfill in their narrow tabular workings as part of the regional support strategy in 1986. Over the years the percentag

    Jan 1, 1998

  • AUSIMM
    The Effect of Aground-Underground Seamlessly Integrated Modelling in Mine Disaster Prevention

    By Y S. Zhang

    Natural phenomena and human engineering construction activities had great influence on the geosciences space. Natural disasters, particularly mine disaster and other geological disasters happened freq

    Nov 22, 2011

  • AUSIMM
    Ore Reserve Estimation - The Systematics to Get it Right

    By S N CARRAS

    Ore reserve estimation is a procedure involving data collection, data storage and judgement and assumptions about geology mining and metallurgy. Calculations are based on these assumptions and an e

    Jan 1, 1992

  • AUSIMM
    Classified Tailings as Part of an Intergrated Regional Support System

    By D R Van Eck

    Western Deep Levels, a seismically active deep level told mine. stalled placing backfill in their narrow tabular workings as part of the regional support strategy in 1986. Over the years the percent

    Jan 1, 1998

  • AUSIMM
    How innovation trumps isolation, one mine at a time

    By J Pearce, R Ramanathan

    hortly after the World Health Organization declared COVID-19 a pandemic, the words ‘social distancing’ entered the global lexicon. The effects on the public of social distancing, lockdowns and travel

    Jun 22, 2022

  • AUSIMM
    Starter dyke optimisation with Muk3D and GoldSim

    By C A. Cooper, G A. Suter

    The sizing of a starter dam for a Tailings Storage Facility (TSF) involves balancing many competing demands. It should cost as little as possible, be high enough to store tailings until the first rai

    Jul 23, 2018

  • AUSIMM
    Synthesis of actinide chlorides for molten salt preparation

    By S Serp, M Duchateau, P Chevreux

    Molten salt reactor (MSR) is a promising advanced reactor system aiming to the transmutation of minor actinides such as americium in order to reduce the inventory of ultimate nuclear waste. The fuel i

    Jun 19, 2024

  • AUSIMM
    The Backfilling Philosophy for Massive Mining at Depth in the South Deep Section, Western Areas Gold Mine (f2bb1cd1-7859-47a6-a8fe-c624335a573a)

    By MacDonald AJ, Raffield MP

    The South Deep massive orebody consists of 20 to 30 in of payable conglomerates ranging in dip from 11¦ to 20¦ and at depths of between 2400 in and 34(10 in. The mine design process selected a minin

    Jan 1, 1998

  • AUSIMM
    Not for the Faint-Hearted

    By J Whittle

    This paper describes what is involved in carrying out a comprehensive optimisation of a long-term operating schedule for a mining complex. It details the data that must be assembled and discusses the

    Nov 24, 2014

  • AUSIMM
    Open Pit Transition Depth Determination through Global Analysis of Open Pit and Underground Mine Production Scheduling

    By K Dagdelen, I Traore

    This paper presents an iterative net present value (NPV) maximisation method to determine the optimum surface to underground transition depth for an orebody to be mined by multiple open pits and an un

    Nov 24, 2014

  • AUSIMM
    Online FTIR analysis for improved efficiency in alumina production

    By K Haroon, J D. Speed, S P. Wood

    Online analysis of continuous and batch processes has seen a dramatic increase in recent years, with examples ranging from petrochemicals to pharmaceuticals, to industrial biotechnology and food and d

    Aug 24, 2022