    Economic and Environmental Constraints on Use of South Island Resources for Power Generation

    Since the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated

    Jan 1, 2003

  • AUSIMM
    Precharging in previously preconditioned ground

    By E Hawkins, S Sheldon

    Block caving is becoming a more widely adopted mining method allowing for underground massive low grade orebodies to be extracted economically. Underbreak during cave propagation is difficult to predi

    Mar 15, 2021

  • AUSIMM
    The Pacific Rim and Sea Level Changes û Good for Some and Bad for Others

    By Kubik K

    This paper reviews the historical data on relative height changes of landmasses with respect to sea level for Pacific Rim countries.It discusses existing theories of the Greenhouse effect, and the int

    Jan 1, 1990

  • AUSIMM
    Feasibility Studies for Financing Purposes

    By Sroka J

    A comprehensive feasibility study should be submitted as part of the loan application to a financial institution for debt funding of a proposed project. Its scope should include technical, costing,

    Jan 1, 1978

  • AUSIMM
    Optimisation of Mines and Smelters by the Application of Improves Computing Systems

    By Quayle J. E

    This paper covers period from 1973 through to 1988 and the mines of West Coast Mines, Elur Mine, North Mine and Risdon Zinc Smelter, now all part of the Pasminco Group. During this period, optimisat

    Jan 1, 1991

  • AUSIMM
    Ore Control to Deliver Metal Production at Ridgeway Gold Mine

    By A Tomsett, J Rutter

    Ore control systems at Ridgeway have been designed to deliver gold and copper metal production through focussing on the ore characteristics that impact on mine and mill performance and ultimately meta

    Jan 1, 2002

  • AUSIMM
    Long Hole Rising at Mines in the Aberfoyle Group

    The application of methods using large diameter down holes has become an important facet in both the development and stoping operations of mines within the Aberfoyle group. Holes of up to 98 metres

    Jan 1, 1982

  • AUSIMM
    Automatic Train Loading of Rock Phosphate at Phosphate Hill

    By Stone AM, Romensky G

    The requirement for economic operation of unit trains carrying bulk materials has dictated that rapid and accurate bulk loading methods be provided. The train loading station at Phosphate Hill, bu

    Jan 1, 1978

  • AUSIMM
    Regional Mineral Potential Assessments for Land Use Planning ù GIS-Based Examples from Eastern Australia

    By D Suppel, Y Miezitis, S Jaireth

    The competition between various options for the use of land is ever increasing. Commonly in Australia large tracts of land were un-encumbered by sweeping land use option limitations, but this situatio

    Jan 1, 1999

  • AUSIMM
    Application of a reinforcement learning AI solution for optimisation of screening shuttles control

    By A Horeth, E Duggan, B Versiani, A Gooch

    Iron ore screening plant productivity is strongly affected by the performance of the shuttle operation, with the control system robustness and associated strategies having a direct impact on utilisati

    Nov 8, 2021

  • AUSIMM
    Evaluation of the Blue Cube MQi Slurry Analyser for Application in an Advanced Control System for the Optimisation of a Gold Sulfide Flotation Circuit

    By D van der Spuy, T Kewe, K Keet, N Moffatt, A P. Paine

    The Blue Cube Mineral Quantifier Inline (MQi) instrument uses reflective light spectroscopy and advanced chemometrics to measure mineral or elemental grade in a slurry line. The instrument takes scans

    Sep 1, 2014

  • AUSIMM
    Business Transformation - Lessons Learnt for Successful Change

    By G Campbell-Cowan

    Much has been written about the fact that most transformation efforts disappoint. This paper addresses factors that should be taken into consideration in planning and implementing transformation progr

    Nov 20, 2012

  • AUSIMM
    Developing the Ridgeway Deeps Project with an Operations Attitude

    By C Jones

    Ridgeway Deeps is a block cave (BC) located down dip of the operating Ridgeway sublevel cave (SLC) mine. The BC is located approximately 210 m vertically below the lowest SLC level and approximately 1

    Mar 21, 2011

  • AUSIMM
    Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)

    By D Bruce, D Cox

    The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock

    Mar 15, 2021

  • AUSIMM
    An estimation error

    By D A. Sims

    This paper outlines the contributing factors to a series of erroneous Mineral Resource estimates which led to considerable loss, including significant reduction of mine life and consequently a large w

    May 24, 2023

  • AUSIMM
    Unlocking mine productivity by changing-the-equation on the where, what and when of orebody characterisation

    By S Warden, T Neville, P Leckie

    At its simplest, the classification and characterisation of an orebody is a matter of Where, What and When. Where and with what spatial resolution are measurements taken, What properties are measured,

    Sep 1, 2024

  • AUSIMM
    A Solution to Grade Estimation in a High Nugget Environment ù The Bendigo Experience

    In a ætypicalÆ gold deposit each tonne of ore will contain tens of millions of very fine gold particles, whereas; at Bendigo the majority of gold in each tonne of ore is present in just five to 15 ver

    Jan 1, 2004

  • AUSIMM
    The Application of Value Engineering Principles to Mining Studies

    By T Schrimpf, I Bryan

    The life cycle of a mining project begins with initial regional exploration and ends with mine closure and rehabilitation. Between resource definition and the commencement of mine construction is the

    May 24, 2012

  • AUSIMM
    Geometallurgical Communication as a Distributed Information System

    By C Moorhead, J Jones

    A common problem in the mining industry is that company geologists can operate in relative isolation to the rest of the company (Jones and Moorhead, 2011). This may result in poor knowledge transfer a

    Sep 29, 2013

  • AUSIMM
    Shifting Waters in the Pilbara’s Iron Ore Industry

    By I Brandes de Roos

    Water has played a key role in the Pilbara’s 60-year history of iron ore operations. In contrast to many of the current-day mining environments, iron ore mining was initially hosted by geological form