Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization
  • CIM
    Flash Furnace Feed System Developments

    By M. Coleman, M. E. Reed

    The control of feed delivery quality to the flash furnace remains an unsolved problem. Many operations around the world still have limited control of feed quality to their flash furnace. Schenck Proce

    Jan 1, 2019

  • CIM
    The Red Dog Mine

    By W. R. Hargrave

    "Mining OperationsOre will be mined by open pit techniques. Because of the high grade of the deposit and the low strip ratio, mining rates are small relative to most other open pit operations.The ore

    Jan 1, 1989

  • CIM
    Anode Furnace Off-Gas NOX Emissions Improvements at Rio Tinto Kennecott

    By Arsenio Enriquez, Adrian Deneys, Ryan Walton, Jenny Esker

    NOx emissions at the Rio-Tinto Kennecott Copper (RTKC) smelter, near Salt Lake City, Utah, are regulated to a compliance emission limit at the Main Stack of 15.9 kg/hr on an annual rolling average. Th

    Jan 1, 2019

  • CIM
    Major savings and production efficiencies with wear-resistant ceramics

    By P. A. Verhey

    "This paper describes a series of wear-resistant ceramic materials which have been successfully used in the mineral processing industry in Canada. Applications include use with metallic ores, coal, po

    Jan 1, 1981

  • CIM
    866 - Problems of Large Relief or Weathered Shear Joints in Granites and Basalts in Brazilian Dam Foundations

    By G. R. Sadowski

    "Large subhorizontal joints have been found in the foundation excavations in basalt and granite of Brazilian Dams. Some spread for hundreds of square meters showed slickensides—polished surfaces plus

    Jan 1, 2015

  • CIM
    Underground water bulkhead construction at Pamour No. 1 mine

    By H. Kalsi

    "IntroductionRoyal Oak Mines Inc. is currently operating the Parnour No.1 mine located 10.5 miles east of Tinunins, adjacent to Highway No. 101. The operation produces gold ore at a rate of 3300 tpd.

    Jan 1, 1994

  • CIM
    Gold(I) as a Nucleophile - a Base

    By Jr. Fackler

    The ionization potentials of gaseous Group 11elements are similar, with Au(0) being 1.5 eV greater than the next highest member of the group, Cu(0). The ionization potentials are all very much greater

    Oct 1, 2003

  • CIM
    Managing electricity to reduce costs

    By I. Clauzier

    "A new method of managing electricity to reduce costs andimprove profits is discussed. Before taking steps to better manage electricity, it is essential to understand the terms peak demand and energy

    Jan 1, 1987

  • CIM
    Consolidation of mine fill by freezing

    By Rachel S. Prudhomme, Michael L. Jeremic

    "The consolidation of mine backfill by free zing is a concept which has been under study in the mining engineering laboratories at Laurentian University during the past three years. The proposed under

    Jan 1, 1985

  • CIM
    Effect of Pore Pressure on Stress Reorientation and Hydraulic Fracture Deviation

    By S. S. Rahman, A. Gholami, M. A. Aghighi

    "This paper provides a foundation for studying the growth of fractures in presence of other discontinuities and different anisotropies of low permeable hydrocarbon formations and helps to improve the

    Jan 1, 2015

  • CIM
    Optimal tailings management at Highland Valley Copper

    By R. C. Lo, M. D. Scott

    "This paper reviews tailings management at Highland Valley Copper, and outlines main features of its tailings storage facility enclosed between the H-H and L-L dams. Key management focusses are: energ

    Jan 1, 1992

  • CIM
    Performance of the Lomex 34-foot variable speed mill

    By J. G. Mieczaniec

    "A key element for a successful mining operation is the grinding circuit. It must be reliable, maintainable and must perform to or above design capacities for 95% of the time. Once chosen and installe

    Jan 1, 1985

  • CIM
    Maintaining a successful loss prevention program

    By G. R. Larocque

    "The Loss Prevention Program and management style applied at Kidd Creek enabled them to maintain a 1.02/200 000 man-hours accident frequency over a 20-year period. Falconbridge Limited, Kidd Creek Div

    Jan 1, 1989

  • CIM
    Utility planning for coal beneficiation

    By Denni Nikols

    "Planning for coal beneficiation in the electric utility industry is relatively complex, involving the coordination of experts and specialists in a broad range of fields, as well as compliance with a

    Jan 1, 1984

  • CIM
    Development of a Water Quality and Stability Index for DC Casting Process

    By G. Girard, A. Larouche, J. Colbert, G. Doyer

    "The Direct Chill (DC) casting process uses water to extract heat from molten aluminium and helps to control the solidification process. Many factors such as the water flowrate, water distribution ar

    Jan 1, 2016

  • CIM
    Coal, a fuel option at Cold Lake

    By J. P. Aiello

    "INTRODUCTIONWhile this paper deals specifically with potential coal use at the Cold Lake Project of Esso Resources Canada Limited, a majority of the technical aspects of coal conversion could apply t

    Jan 1, 1989

  • CIM
    Prognoses for Alberta thermal and metallurgical coal

    "Projections of demand for Alberta coal indicate a quadrupling of current production rates to some 70 million tonnes/year by the end of the century. About half of this output-comprised of subbituminou

    Jan 1, 1982

  • CIM
    Sinking No. 4 Shaft at Hartebeestfontein Gold Mining Company, Ltd

    By D D. Deacon

    A brief description is given of the requirements which No. 4 Shaft has been designed to meet and of the methods by which two-stage winding of rock has been accommodated in a single shaft sunk to a dep

    Jan 1, 1965

  • CIM
    Design and construction of the Montana Tunnels tailings disposal facility

    By K. J. Brouwer, J. P. Haile

    "Construction of the first stage of the tailings disposal facility for the Montana Tunnels Project was completed in October 1986. The project is located 37 km south of Helena, Montana, and involves mi

    Jan 1, 1988

  • CIM
    Failure mechanics and design considerations for footwall slopes

    By D. C. Martin, P. M. Hawley, C. P. Acott

    "In bedded deposits such as coal or sedimentary iron, economic limits of mineable reserves are clearly defined by the footwall of the seams or ore-bearing units. Where open pits are developed in dippi

    Jan 1, 1986