Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White
The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame
Jun 13, 2021
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Design and Construction of a Shallow Twin Tube Bifurcation— Atlanta Plane Train West Extension Project - NAT2022By John Murray, Daniel Ebin, Robert Gould, Yiming Sun, Lizan Gilbert
The Atlanta Plane Train Tunnel West Extension is being constructed at Hartsfield-Jackson Atlanta International Airport using the Sequential Excavation Method (SEM). The tunnel has shallow ground cover
Dec 1, 2022
-
Design and Construction of an Electric Oven to Determine the Detonation Temperature of the FulminantBy Alexander S. Escalante, Luis R. Ramirez, Nelson A. Arostegui
Research, analyze, discuss, design, and build an electric oven to perform one of the quality control tests the fanel or common fulminers to determine what temperatures they can detonate at. Give pract
Feb 1, 2020
-
Design and Construction of Deep Shaft Concrete Linings in the UKBy F. A. Auld
"During the period 1958-1980 seven deep shafts were sunk from the surface in the UK. From 1977 until 1989 sixteen deep shafts were sunk in the UK, all concrete lined. Subsequently from 1989 up to the
Jan 1, 2019
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric ProjectBy James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
Design and Construction of Hydrostatic Mine Shaft Liners Using Cast Iron Tubbing TechnologyBy J. Ouellet
The design of hydrostatic liner for a deep potash mine shaft in Saskatchewan poses tremendous technological challenges. Technology has evolved to a point where one could consider a new innovative appr
Aug 1, 2013
-
Design and Construction of Large-Scale Ventilation Caverns on WestConnex’s Rozelle Interchange Project - NAT2022By M. Trim, Y. Sun, D. Tepavac, A. Kumar
Configuration of Rozelle Interchange Project’s ventilation system required design and construction of some of the largest and tallest underground civil caverns attempted in Australia. The paper focuse
Dec 1, 2022
-
Design and Construction of Natural Gas Transmission LinesBy B. W. Snyder
INTRODUCTORY THE earliest known case of transmission of natural gas by pipe lines was early in the Christian era when the Chinese used bamboo pipes to transport natural gas from surface seepages to h
Jan 1, 1951
-
Design and Construction of NEORSD’s Doan Valley Storage Tunnel - NAT2022By Timothy O’Rourke, Karrie Buxton, Chris Lynagh, Daniel Dobbels, Frederick Vincent
The Doan Valley Storage Tunnel Project in Cleveland Ohio was constructed to control Combined Sewer Overflows (CSOs). It is a complex system of three tunnels ranging from 8.5 to 18 feet in diameter wit
Dec 1, 2022
-
Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling MethodBy Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano
Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.
Jan 1, 2019
-
Design and Construction of REM Tunnels and Underground Structures - RETC2023By Verya Nasri, Agustin Rey
Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill
Jun 13, 2023
-
Design And Construction Of Shear Pins For Landslide StabilizationBy Fei-chiu Huang
A 17-acre landslide occurred in February 2001, on a slope below Via Bellota in the City of San Clemente, California. Three homes were destroyed and many others placed in jeopardy. The landslide, inv
Jan 1, 2010
-
Design and Construction of Sydney’s South West Rail Link Hume Highway UnderpassBy B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Design and Construction of Tailings Dams (ENVIRONMENTAL CONTROL )By Earle J. Klohn
"The design, construction and operation of tailings dams is rapidly becoming a major consideration for most new mining developments, as well as for many existing operations. In North America, under pr
Jan 1, 1972
-
Design and Construction of Tailings Ponds and Reclamation Facilities - Case Histories (ClM Bulletin, October 1978)By J. D. Jones
The geographic occurrence of economic mineral deposits presents a variety of problems in modern tailings disposal operations. This paper presents case histories in several sectors of the mineral indus
Jan 1, 1978
-
Design and Construction of the Deepest Base Grouted Bored Piles at Moorehouse in LondonBy Adam Pickles, Duncan Nicholson, Richard E. Prust, Hoe C. Yeow
"Moorhouse is founded on what at the time of construction were the deepest base grouted piles ever installed in London, specifically designed to accommodate settlement from the proposed development of
Jan 1, 2005
-
Design And Construction Of The Deepest Cfa Pile In AustraliaBy W. L. Chong
For a project located in Docklands Victoria, a high-rise development was proposed where the geology comprised soils of various compositions and consistencies to approximately 50m deep before being und
Nov 1, 2022
-
Design and construction of the Montana Tunnels tailings disposal facilityBy K. J. Brouwer, J. P. Haile
"Construction of the first stage of the tailings disposal facility for the Montana Tunnels Project was completed in October 1986. The project is located 37 km south of Helena, Montana, and involves mi
Jan 1, 1988
-
Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021By David Mast, Amanda Foote, Mina Shinouda
The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5
Jun 13, 2021