Search Documents

Sort by

  • AIME
    Drilling and Producing – Equipment, Methods and Materials - A Method for Predicting Depletion Performance of a Reservoir Producing Volatile Crude Oil

    By R. H. Jacoby, V. J. Berry

    Future depletion performance and ultimate oil recovery from reservoirs producing under volumetric control are often predicted with the aid of a material balance equation. When the reservoir fluid is v

    Jan 1, 1958

  • AIME
    Drilling and Producing – Equipment, Methods, and Materials - Development and Application of “Frac” Treatments in the Permian Basin

    By R. E. Hurst, D. E. Ramsey, J. M. Moore

    The "frac" method of well stimulation has been applied successfully to all producing formations in the Permian Basin area. During the five years since its development, many changes and improvements ha

    Jan 1, 1956

  • AIME
    Drilling and Producing – Equipment, Methods, and Materials - Reservoir Fracturing - A Method of Oil Recovery from Extremely Low Permeability Formations

    By L. E. Wilsey, W. G. Bearden

    This paper presents results of analysis of the effect of fracturing on initial flow rates and on ultimate recoveries from low capacity oil formations. This analysis shows that even in formations of pe

    Jan 1, 1955

  • CIM
    Drilling and Production Practices in the United States

    By E. G. Gaylord

    THE material improvements which have been made in the practice of exploiting oil and gas reservoirs in the United States during recent years may be attributed largely to: (1) The necessity for drill

    Jan 1, 1941

  • SME
    Drilling of Heap Leach Residue at Gold Fields-Mesquite

    By Alex Ruzycki

    Gold Fields-Mesquite is a 7.5 million ton per year heap leach operation located in the Maj ave Desert of Southeastern California. Extraction of gold is carried out on multiple lifts, with over 33.3 mi

    Jan 1, 1992

  • AIME
    Drilling Practice- Five Years Of Revolution

    MODERN mining is based on drilling--everything else stems from that. U. S. and Canadian mining companies and suppliers of mining equipment are constantly seeking new techniques and tools for increased

    Jan 9, 1954

  • AIME
  • AIME
    Drilling–Equipment, Methods and Materials - On Axial Fractures Produced by Explosively Induced Shocks in Plexiglas Rods Simulating Drill Bits

    By Jean-Jacques Prompsy, J. S. Rinehart

    Some time ago a study was initiated at the Colorado School of Mines in an effort to arrive at a better understanding of the stress fields developed within drill bits under dynamic loading and the infl

  • AIME
    Drilling–Equipment, Methods and Materials - Ultimate Resistance Against a Rigid Cylinder Moving Laterally in a Cohesionless Soil

    By L. C. Reese

    The ultimate resistance against a rigid cylinder which is moved laterally in a cohesionless soil is a function of the geometry of the cylinder and the properties of the soil. An approximate method is

  • AIME
    Drilling–Equipment, Methods and Materials - Wellbore Pressure Surges Produred by Pipe Movement

    By J. A. Burkhardt

    Field measurements and theoretical studies have been made of pressure surges—momentary variations in fluid pressure—produced by movement of pipe in mud-filled boreholes. Pressure measurements were rec

  • DFI
    Driven Pile Foundation Design And Construction Genentech Hall - UCSF Mission Bay Campus

    By Robert E. Fosse

    Driven 14-inch-square concrete piles were used as the foundations of Genentech Hall at the new University of California, San Francisco Mission Bay Campus. The five-story, steel eccentrically-braced fr

    Jan 1, 2002

  • DFI
    Driven Pile Foundation Design and Construction Issues for a Highrise Building in Manhattan

    By Satyajit Vaidya, Rudolph Frizzi, Sandy Larimer

    "This paper presents a case history in design and construction of a deep foundation system that included high-capacity open-ended driven piles constructed to support a high-rise building in Manhattan,

    Jan 1, 2016

  • DFI
    Driven Piles In Central Texas Expansive Soils

    By Clayton A. Signor

    Abstract: Expansive soils cause more damage to structures annually than a combination of other major natural disasters. Because of the cost to our society, all means and methods need to be fully expl

  • DFI
    Driven Pipe Pile Solutions for the Temporary Foundations at the New San Francisco-Oakland Bay Bridge

    By Manuel M. Reyes, Thuraisamy Thavaraj, Alex Sy

    "The new east span of the San Francisco-Oakland Bridge features a single tower self-anchored suspension (SAS) bridge. During construction of the SAS bridge, a temporary bridge was used to support the

    Jan 1, 2015

  • DFI
    Driving and Extraction of Steel Pipe Piles in Nearshore Environment

    By Jim Rix, Ken Been, Nihal Bohra, Anthony Rice, Juan Lopez

    "A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the br

    Jan 1, 2017

  • DFI
    Driving And Extraction Of Steel Pipe Piles In Nearshore Environment

    By Nihal Bohra

    A temporary bridge, supported on steel pipe piles, was built to expedite the construction of a breakwater structure off the western coast of Peru. The bridge provided access for dump trucks to the bre

  • AUSIMM
    Driving Haulage Productivity Improvements through Industry–Academia Collaboration

    By R Thompson, J Miedecke, D Handel, E Tomicek, D Tulloch

    "The Mine Haul Road Optimisation Alliance (HROA) is a unique Australian industry–academia collaboration that has been developed to support mine haul road operators. The alliance integrates industry, e

    Nov 15, 2016

  • AUSIMM
    Driving improvements to underground diamond drilling effectiveness through real-time implicit modelling at Olympic Dam

    By J Taylor, M Smith, A Tunnadine, D Nikolakopoulos

    As Olympic Dam rapidly expands into the Southern Mine Area (SMA) the Mine Geology team has concurrently ramped up underground diamond drilling to sustain rates of above 175 km/a. With >10 underground

    Mar 22, 2022

  • AUSIMM
    Driving Mine Performance through Communication

    By S Jeffrey, S Mundell, F Arboleda

    In the current cycle of low commodity prices and rising costs, mine managers continue to focus on optimising mine performance and productivity. A critical component of strengthening performance and pr

    Jun 22, 2016

  • SME
    Driving Open Autonomy and Innovation - SME Annual Meeting 2024

    By Jason Clarke, Glen Trainor

    As the mining industry faces increased challenges with declining ore grades and harder to access deposits, operating mine sites in an environmentally responsible and economically viable manner will re

    Feb 1, 2024