Bypass Tunnel Shafts—Shotcrete Lining - RETC2023
By Paul Madsen, Bade Sozer, Thomas Hennings, Eileen Test
The Rondout Bypass Tunnel in New York has two access shafts. The upper sections of the shafts are lined with steel pipe to resist a substantial net internal water head . Initial design included a ¾-in
Jun 13, 2023
-
Cable Bolt Bearing Capacity – An In Situ Parametric Study
By K. Soucek, J. Ptácek, A. Hastíková, R. Kukutsch, P. Konícek, P. Waclawik
"Cable bolts are used frequently as a secondary support system (with steel arch support) in difficult stress-strain conditions of deep coal mines. The load transfer mechanism of cable bolts depends on
Jan 1, 2015
-
Cable Bolting For Pillar Recovery At The Magmont Mine
By S. R. Dismuke
Ore at the Magmont Mine in southeast Missouri is extracted by the room and pillar method on two and sometimes three horizons. In 1991, an innovative plan was formulated for recovery of high grade ore
Apr 13, 2011
-
Cable Bolts - An Effective Primary Support System
By Stephen C. Tadolini, John P. McDonnell
"High-strength cable bolts have been used for ground support in underground coal mines for many years. Cable bolts are routinely used as secondary ground support in numerous longwall gateroad support
Jan 1, 2010
-
Cable Shovel Simulation leading to A Novel Dipper Design
By Ning Shi
This paper suggests an alternative design approach for an innovative shovel dipper, for use in ground conditions where cutting of virgin ground rather than scooping of blasted material is required. No
May 1, 2004
-
Cable Slings - A Versatile 'Band-Aid' For Providing Safety In Underground Mining
By Brian R. Castle, James J. Scott
INTRODUCTION Referring to a ground support system as a 'band-aid' borders on getting cute, but the application of cable slings in U.S. mining is somewhat analogous. Where problems in the
Jan 1, 1983
-
Cable Tunnel Ventilation
By P Ridley
EnergyAustralia’s Sydney Central Business District (CBD) cable tunnel network will form a loop 6.2 km in length. The 3.2 km long, 3.5 m, diameter city east cable tunnel (CECT) currently in design, wil
Mar 8, 2011
-
Cablec opens polymer compounding facility for power cable components
Power cable costs are only a small part of total mining costs. So many mine operators consider power cable failure and resultant downtime as part of the cost of doing business. But, viewed in terms of
Jan 12, 1988
-
Cableless Electronic Surveying Systems For Horizontal Holes
By John Millhiser, Margaret Bonarek, Dennis McLaughlin
This report contains a description of the contract activities performed by ENSCO, Inc. under contract No. H0178069. The purpose of this project was to enhance the Bureau of Mine's Cableless Elect
-
Calcine, its use in EZ's new selective zinc precipitation process for impurity and water balance control
By J. R. Welsh, D. J. Palmer, O. M. G. Newman
"The use of calcine for selective zinc precipitation requires specialist knowledge to achieve satisfactory flowsheet design. Calcine from the bed of a fluid roaster is preferred, and factors such as t
Jan 1, 1988
-
Calcium Carbonates For Building Products: Requirements Of Specific Applications
By M. Tapper
If one considers that prehistoric man's first house may have been a limestone cave, calcium carbonate may be the most timeless of all building materials. Fanciful history aside, CaCO3 has been us
Jan 1, 1993
-
Calcium Oxide As A Reagent For The Capture Of Arsenic Emissions During The Roasting Of Enargite (CU3AsS4)
By B. S. Terry
Experiments have been conducted to assess the feasibility of capturing bearing emissions arsenic with CaO during the roasting of enargite (Cu3AsS4). Enargite/CaO mixtures have been heat treated in air
Jan 1, 1994
-
Calculating Blasting Effects to Nearby Underground Pipelines
By Janice K. Means
The purpose of this paper is to provide the seminar attendee with: information on pipeline construction, operation and standards to better equip him (or her) to analyze the ultimate effect of blasting
Jan 1, 1992
-
Calculation of Metal, Coke and Gas Temperature Distributions in the Cupola Furnace
Calculations of the temperatures of metal, coke, and gas at any level in the cupola furn~ce can be carried out by means of heat balances, using data obtained from experiments with an 18 in. experiment
Jan 1, 1963
-
Calculation Of Support For Hard, Jointed Rock Using The Keyblock Principle
By Gen-Hua Shi, William Boyle, Richard E. Goodman
This keynote paper calls attention to two critically important issues relating to selecting supports for excavations in hard rock. The first is the proportion of the ultimate sliding volume that needs
Jan 1, 1982
-
Calibrating a Caving Model for Sedimentary Deposits-estimation of Load Distribution between Gob and Abutment
By Thierry Lavoie, Mark K. Larson
"Engineers at the National Institute for Occupational Safety and Health (NIOSH) and Itasca Consulting Group, Inc., conducted a study to determine the procedure for calibrating a caving model implement
Jan 1, 2016
-
Calibrating the LaModel Program for Shallow Cover Multiple? seam Mines
By Morgan Sears
The LaModel program (Heasley, 1998) is a displacement discontinuity, boundary element model (BEM) for analyzing stresses and displacements in single and multiple-seam coal mines. After the Crandall Ca
Jan 1, 2013
-
Calibrating the Lamodel Program for Site Specific Conditions
By Keith A. Heasley
The LaModel program has been used successfully in the United States for many years to design pillars to ensure global stability of pillar recovery operations. However, the recent Crandall Canyon Mine
Jan 1, 2012
-
Calibration of LKAB’s Konsuln Test Mine Ventilation Model Using Barometer Pressure-Quantity (PQ) Survey
By A. Halim, A. Martikainen, S. GYAMFI
This paper outlines a unique case of the development of strategies to reduce ventilation and heating costs in Konsuln iron ore mine in northern Sweden. The mine, located just south of Luossavaara-Kiir
Sep 30, 2021
-
Calibration Of The Analysis Of Longwall Pillar Stability (ALPS) Chain Pillar Design Methodology For Australian Conditions
By Mark Colwell
This paper summarizes the results of a research project whose goal was to provide the Australian coal industry with a chain pillar design methodology readily usable by colliery staff. The project was
Jan 1, 1999