Search Documents

Sort by

  • CIM
    Derivation of Geotechical Parameters for Cut Wall Design at Banora Point, NSW Australia

    By N. T. Oo, L. D. Hutton

    "The Banora Point Upgrade Project is a 2.5km long six-lane divided freeway in northern New South Wales, Australia. The geology at the project area comprises a volcanic succession of variably weathered

    Jan 1, 2015

  • CIM
    Learnings from Infrastructure Replacement within an Operating Refinery

    By L. Trytten, S. Bass, P. Nawrocki, J. Mercer

    The Sherritt Fort Site nickel refinery and fertilizer plant has been operating continuously since 1954. The ammonia leach process uses ammonia and sulphuric acid, producing nickel and cobalt and an am

    Jan 1, 2015

  • SME
    Development of Mine Haul Road Surfacing Condition Monitoring Through Digital Image Processing

    By S. Pastor, S. Hahn

    "As the concept of autonomous haulage systems (AHS) moves from proto-types to production-ready applications, the operating performance of the haul road will become ‘mission critical’ to the overall su

    Jan 1, 2015

  • SME
    Implementation of Pastefill at the Barrick Goldstrike Mine

    By G. Chancellor

    "INTRODUCTION The paste plant is located at the Barrick Goldstrike mine in Northern Nevada on the Carlin Trend. The Goldstrike property consists of an open pit and an underground mine; along with two

    Jan 1, 2015

  • CIM
    Managing Furnace Integrity by Utilizing Non-Destructive Testing (NDT) and Monitoring Techniques`

    By T. Gerritsen, R. MacRosty, R. Pula, P. Gebski, W. L. Ying

    Furnace run-outs can cause extended furnace downtime for repair, while leaks or more severe failures in the cooling system can lead to brick hydration or in severe cases, steam explosions. These incid

    Jan 1, 2015

  • DFI
    Combined Piled Raft Foundation (CPRF) response

    By G. L. Sivakumar Babu, P. Chaithra

    "Raft foundations which are used against differential settlements and for carrying heavy loads can still be subjected to excessive settlements even if it is safe against bearing capacity consideration

    Jan 1, 2015

  • CIM
    Design Methodology for Large Underground Powerplants

    By R. Plassart, F. Laigle

    "As a powerhouse, a transformer or a valve chamber, large underground caverns are a major element of hydropower plant. On the contrary to galleries and shafts which are linear and long underground str

    Jan 1, 2015

  • CIM
    A Positive Pressure Based Dry Gas Handling System for Energy Recovery from Suppressed Combustion Exhaust

    By A. McGrath, M. Trovant, M. Haque

    Minimizing energy consumption is a priority for many industrial facilities. Metallurgical and gasification processes produce dirty syngas (CO and H2), which offers the potential for energy recovery. H

    Jan 1, 2015

  • SME-ICGCM
    The Potential of Acoustic Emissions from Three Point Bending Tests as Rock Failure Precursors

    By Filippo Vallianatos, Michael Verigakis, Vasili Saltas, Kosta Kaklis, Stelio Mavrigiannakis, Zach Agioutantis

    "Development of failure in brittle materials is associated with microcracks, which release energy in the form of elastic waves called acoustic emissions. This paper presents results from acoustic emis

    Jan 1, 2015

  • SAIMM
    Representation of coal and coal derivatives in process modelling (c1409317-ab54-4241-b307-06d0044846d0)

    By J. A. Theron

    "This paper provides guidelines on performing mass and energy balance modelling involving coal and coal derivatives. Usually, the inputs to a pyrometallurgical process would be specified in terms of e

    Jan 1, 2015

  • SME
    Impermeable Rock Groups Deformation during Partial Backfill Mining of Shallow Seam Mines

    By W. Zhang

    "Western China has many shallow coal seams. Mining of these shallow seams contributes to environmental deterioration in part due to disruption of groundwater sources. The lowering of the phreatic surf

    Jan 1, 2015

  • ISEE
    Implementing Effective Dispute Resolution Techniques in the Explosives Industry

    By E. A. McCullough, Jackson B. C., S. K. Metz

    Public perception is a significant challenge facing the explosives industry. The public often perceives that its needs and interests are in direct competition with those of blasting companies’, leadin

    Jan 1, 2015

  • CIM
    Co2 Utilization via Intensified and Integrated Mineral Carbonation: Process and Products Optimization

    By P. C. M. Knops, K. Rijnsburger, R. M. Santos

    To overcome the challenges of mineral CO2 sequestration, this work utilizes a unique proprietary Gravity Pressure Vessel (GPV) reactor technology, and focuses on reaction products of high economic val

    Jan 1, 2015

  • CIM
    Project Implementation

    By Randy McMeekin, Chris Twigge-Molecey, J. Peter Blake

    The project implementation phase, FEL4, is generally a complex undertaking. The project has been approved for construction and the capital has been allocated. At this point the project team comes unde

    Jan 1, 2015

  • CIM
    A Modified Cast-on Method for the Reinforcement of Aluminum Castings with Dissimilar Metals

    By Q. Han

    A modified cast-on method has been developed to reinforce aluminum castings with steel insert. Defect-free bond between the steel insert and the aluminum casting has been consistently obtained. Dat

    Jan 1, 2015

  • SAIMM
    Property–Performance Relationships of Commercial Diluents in Sub-Saharan Africa Copper Solvent-Extraction Conditions

    By Chad W. Brown

    "A study of five commercially available solvent-extraction diluents in combination with three commercially available extractants under sub-Saharan African copper solvent-extraction conditions yielded

    Jan 1, 2015

  • SME
    Study on Correlation of Quantified Coal Rank with Self-Heating Temperature

    By Y. Luo

    "It is generally known that spontaneous combustion potential is a function of coal rank, with low-rank coals having high susceptibility to self-ignition and high-rank coals having low potential. To es

    Jan 1, 2015

  • CIM
    Platinum and Rhenium Recovery from Reforming Catalysts via Plasma Arc Technology

    By D. E. Deegan, P. M. Keeley, N. A. Rowson, T. Stachowski

    An investigation into the use of Tetronics International’s thermal plasma technology based pyrometallurgical smelting process for the recovery of both platinum and rhenium was conducted. 1000 kg of Pt

    Jan 1, 2015

  • CIM
    Applications for Continuum Modelling of Brittle Rock Fracture with a Focus on Dilatancy During Failure

    By M. S. Diederichs, G. Walton

    "Developments in understanding the brittle fracture of rock over the past two decades ultimately led to the acceptance of a cohesion-weakening-friction-strengthening model as an appropriate strategy f

    Jan 1, 2015

  • SME
    Standing Support and Rolled Mesh for Safe and Efficient Tailgate Rib Control

    By J. Dubbert, T. H. Jones

    "This paper describes a rib-control methodology that uses standing support to provide most of the lateral resistance to the rib. The method is analyzed, and its boundary conditions for rib control are

    Jan 1, 2015