Search Documents

Sort by

  • AUSIMM
    Production Schedule Optimisation – Meeting Targets by Hedging against Geological Risk while Addressing Environmental and Equipment Concerns

    By M Spleit

    A long-term production schedule for the LabMag iron ore deposit in northern Quebec, Canada is derived using stochastic integer programming. The optimisation formulation maximises the schedule’s net pr

    Nov 24, 2014

  • AUSIMM
    An Application of Simultaneous Optimisation – Improving the Payback Period of a Zinc-Copper Open Cut Project

    By D J. Thobaven

    Project financing challenges caused by declining commodity prices have heightened the need to improve project metrics such as minimising capital payback and maximising net present value (NPV). Khnaigu

    Nov 24, 2014

  • AUSIMM
    Simulating Extraction Shapes to Understand Financial Risk Using High Performance Computing

    By E Lima, D Gregory, C Faria, A Lapworth

    Open pit mine enterprises are complex systems that depend on multiple parameters such as mineral grade distribution, geotechnical characteristics, economic conditions and engineering requirements, all

    Nov 24, 2014

  • AUSIMM
    Mineral Supply Chain Optimisation under Uncertainty Using Approximate Dynamic Programming

    By R Dimitrakopoulos, C Paduraru

    The optimisation of mine complexes and related value chains is a challenging problem due to the simultaneous presence of a highly-dimensional decision space, integer decision variables, non-linear con

    Nov 24, 2014

  • AUSIMM
    Modelling Open Pit and Underground Production Scheduling in Concert

    By B King

    A large number of mineral deposits contain regions in which it is economically beneficial to extract ore both via open pit and underground mining techniques. Current industry practice lacks an effecti

    Nov 24, 2014

  • AUSIMM
    Life of Asset Planning, Uncertainty and Value Optimisation of the Iron Ore Business – From Exploration, to Market, to Closure

    By J McCluskey, N Barros

    "Long-term strategic planning at BHP Billiton’s Western Australia Iron Ore business aims for sustainable value maximisation of its large, long-life, low-cost, expandable mineral inventory and supply c

    Nov 24, 2014

  • AUSIMM
    Cost Management Optimisation

    By B King

    Processing expansion options and mining fleet purchases are major cost items that receive due focus in most cost management analyses. If these items are not needed, they can significantly reduce a pro

    Nov 24, 2014

  • AUSIMM
    Simulation Optimisation of Mine Operational Plans

    By H Askari-Nasab, E Torkamani, M M. Badiozamani, S P. Upadhyay, M Tabesh

    "Decision-making in mining is a challenging task. Optimal decisions regarding shovel and truck allocations, aligned with the optimal short-term production schedules, are crucial in keeping the operati

    Nov 24, 2014

  • AUSIMM
    On the Joint Multipoint Simulation of Discrete and Continuous Geometallurgical Parameters

    By K G. van den Boogaart, M Lehmann, U Mueller

    Geometallurgical parameters are descriptions of the mineralogy and microstructure of the ore determining its mineralogical and microstructural characteristics. From a conditional geostatistical simula

    Nov 24, 2014

  • AUSIMM
    Analysis of Geotechnical and Support Parameters on Coalmine Entry Stability Using the Strength Reduction Method

    By G S. Esterhuizen, M M. Murphy, T S. Bajpayee

    The strength reduction method (SRM) has been implemented in the FLAC3D finite difference software and applied to coalmine entry support evaluations. The FLAC3D numerical models have been calibrated ag

    Nov 5, 2014

  • AUSIMM
    Laboratory Corrosion Tests of Frictional Rock Bolts

    By D W. Airey

    Frictional rock bolts are widely used because of their low cost. However, they have a thin wall section that makes them prone to corrosion, and they cannot be relied on to provide long-term ground sup

    Nov 5, 2014

  • AUSIMM
    A Non-destructive Testing Method for Measuring Bolt Condition

    By B Jones, M Chappell

    Installing ground support correctly is not an easy task, whether lack of operator training, poor ground conditions or underperforming equipment. Confirming the quality of installation can help with pl

    Nov 5, 2014

  • AUSIMM
    Geotechnical Models and Data Confidence in Mining Geotechnical Design

    By M J. Dunn

    The geotechnical model is the cornerstone of any mining geotechnical design and as such the confidence level and reliability of the geotechnical model is paramount. The geotechnical model confidence l

    Nov 5, 2014

  • AUSIMM
    Longwall Mining beneath Critical Infrastructure – Prediction versus Performance of the Cataract Tunnel, New South Wales, Australia

    By T J. Sullivan, H Pinkster, G Swarbrick

    From 2002 to 2006, longwall mining was undertaken directly beneath the Cataract Tunnel, which is a 100-year-old, heritage-listed tunnel in Hawkesbury Sandstone responsible for delivering 20 per cent o

    Nov 5, 2014

  • AUSIMM
    Mechanical Properties of Cementitious Grout Serving in Fully Grouted Cable Bolting Systems

    By P C. Hagan, J Chen, S Saydam

    Fully grouted cable bolts have been used in underground mining industry for more than 40 years and are becoming more and more popular especially when severe geological conditions are encountered, such

    Nov 5, 2014

  • AUSIMM
    Redevelopment at Northparkes Following Significant Drive Closure

    By J Samosir, L A. Snyman

    Northparkes is located 27 km north of the township of Parkes in central New South Wales, Australia. The operations consist of underground block cave mines and an ore processing plant that produces hig

    Nov 5, 2014

  • AUSIMM
    Coal Bursts in the Deep Longwall Mines of the United States

    By C Mark

    Coal bursts involve the sudden, violent ejection of coal or rock into the mine workings. They are a particular hazard because they typically occur without warning. During the past two years, three US

    Nov 5, 2014

  • AUSIMM
    The Application of Rock Stress Inputs to Stability Assessments at Ok Tedi Mine, Papua New Guinea

    By K W. Mills, N R. P Baczynski, J Mylvaganam, D A. Prado, M F. Lee, I A. de Bruyn

    "This paper presents the second part of a study of the assessment of rock stress inputs on the performance of various new mining designs at the Ok Tedi large open pit mine in Papua New Guinea. Over th

    Nov 5, 2014

  • AUSIMM
    The Significance of Superincumbent Strata Stiffness and its Impacts on Coalmine Design

    By J M. Galvin

    The traditional engineering approach to assessing stability is based on comparing resisting force (capacity) to driving force (demand), or strength to working stress. In underground coal geomechanics,

    Nov 5, 2014

  • AUSIMM
    Confirmation of Multiseam Extraction Rules for Black Rock Manganese Operations, Assmang, Northern Cape, South Africa

    By M K. C Roberts, M G. Magwaza, J W. L Hanekom, P Piper, R Lousteau

    Due to the perceived potential to extract the second economic manganese seam at its Black Rock Operations in the Northern Cape Province, South Africa, Assmang commissioned an investigation with respec

    Nov 5, 2014