    Exploring the Use of Fibre Reinforced Shotcrete in Large Diameter Shafts

    By D J. Kilkenny, D A. O’Toole, P B. Hills, K L. Seah

    An investigation was undertaken to critically analyse the use of fibre reinforced shotcrete (FRS) for a variety of applications in large diameter shafts. Those applications included the use of FRS wit

    Nov 5, 2014

  • AUSIMM
    Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel Segments

    By M Wieloch, D Wimpenny, M Chappell

    Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in

    Sep 17, 2014

  • AUSIMM
    Waterview Connection – Temporary Works for Tunnel Boring Machine?Launching

    By D Kubik, K The

    The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by

    Sep 17, 2014

  • AUSIMM
    Tunnel Boring Machines in Mines – A?Brief Review of Past Use with a Status Report on Use Today in Australia

    By M Rauer

    With a worldwide growing population the demand for higher living standards, food and the development of new technology is rapidly rising. To allow for a continuous growth, larger quantities of mineral

    Sep 17, 2014

  • AUSIMM
    Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted Annulus

    By M Norbert, P Mok

    The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double

    Sep 17, 2014

  • AUSIMM
    Precast Concrete Segmental Tunnel Linings – The State-of-the-art

    By A Harding, M Chappell

    Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig

    Sep 17, 2014

  • AUSIMM
    Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?Process

    By T Ireland, S Eratne, W Newns, P Spies

    The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest

    Sep 17, 2014

  • AUSIMM
    The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, Australia

    By P K. Wong, D A. F Oliveira, F M. Azad

    In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv

    Sep 17, 2014

  • AUSIMM
    Design and Construction of Sydney’s South West Rail Link Hume Highway Underpass

    By B Chapman, R Nievergelt, J Hill

    A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume

    Sep 17, 2014

  • AUSIMM
    Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro Extension

    By L Nagy, K P. Juhasz

    The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi

    Sep 17, 2014

  • AUSIMM
    Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast Techniques

    By D Miller, M Dowling, R Domotor

    "This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj

    Sep 17, 2014

  • AUSIMM
    Opening Supports to Segmental Linings – A Novel Shotcrete Support Solution

    By M Burdick, A Harding, M Krulc, M Chappell

    Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How

    Sep 17, 2014

  • AUSIMM
    High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, Philippines

    By C Harrison, A Bowskill

    The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to

    Sep 17, 2014

  • AUSIMM
    The Challenge of Waterproofing Cross Passages in Segmentally Lined Tunnel Boring Machine Tunnels

    By E P. O’Dwyer

    Segment and gasket lining in tunnel boring machine (TBM) tunnels; and sheet membrane lining systems in driven tunnels are robust waterproofing systems each with a proven history of performance in Aust

    Sep 17, 2014

  • AUSIMM
    Comparison of Glass-fibre Reinforced Polymer Rock Bolts with Double Corrosion Protection Steel Rock Bolts for Use in Tunnel Applications

    By S J. Clarke, G Sieders

    Double corrosion protection (DCP) rock bolts have evolved to become complicated assemblies comprising numerous components. This complexity is mainly associated with durability considerations including

    Sep 17, 2014

  • AUSIMM
    Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground Conditions

    By M Norbert, D O’Connor

    The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set

    Sep 17, 2014

  • AUSIMM
    The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case Study

    By B Jones, M Chappell

    Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the

    Sep 17, 2014

  • AUSIMM
    Design and Construction for the Widening of the M2 Norfolk Twin Tunnels

    By A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys

    The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o

    Sep 17, 2014

  • AUSIMM
    Commercial Underground Space – Planned Development for the Future

    By A C. Robertson

    World urban expansion puts constraints on the available land surface area of our major cities both for accommodating people as well as providing infrastructure and services whilst at the same time att

    Sep 17, 2014

  • AUSIMM
    Development of State-of-the-art Connection Types for Pipe Umbrella Support Systems

    By G M. Volkmann

    Pipe umbrella support systems – also called canopy tube systems – have been used successfully for tunnelling in challenging ground conditions since the 1970s. Historically, the drilling unit was the l

    Sep 17, 2014