Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Exploring the Use of Fibre Reinforced Shotcrete in Large Diameter ShaftsBy D J. Kilkenny, D A. O’Toole, P B. Hills, K L. Seah
An investigation was undertaken to critically analyse the use of fibre reinforced shotcrete (FRS) for a variety of applications in large diameter shafts. Those applications included the use of FRS wit
Nov 5, 2014
-
Fibre-reinforced Geopolymer Concrete – An Innovative Material for Tunnel SegmentsBy M Wieloch, D Wimpenny, M Chappell
Fibre-reinforced geopolymer concrete (FRGC) contains no Portland cement or steel reinforcement, but instead uses synthetic fibre reinforcement and a geopolymer binder. The use of geopolymer binder in
Sep 17, 2014
-
Waterview Connection – Temporary Works for Tunnel Boring Machine?LaunchingBy D Kubik, K The
The New Zealand (NZ) Transport Agency’s Waterview Connection will complete Auckland’s Western Ring Route, a 47 km north–south motorway alternative to Stage Highway 1. The project is being delivered by
Sep 17, 2014
-
Tunnel Boring Machines in Mines – A?Brief Review of Past Use with a Status Report on Use Today in AustraliaBy M Rauer
With a worldwide growing population the demand for higher living standards, food and the development of new technology is rapidly rising. To allow for a continuous growth, larger quantities of mineral
Sep 17, 2014
-
Tunnel Boring Machine Excavation Stability – Double Shield Tunnel Boring Machine Advance with Partially Grouted AnnulusBy M Norbert, P Mok
The mainline running tunnels for Legacy Way comprise of two-lane tunnel boring machines (TBM) driven tunnels. The length of the TBM tunnel section is approximately 4.2 km. The TBMs employed are double
Sep 17, 2014
-
Precast Concrete Segmental Tunnel Linings – The State-of-the-artBy A Harding, M Chappell
Precast concrete segmental linings have enjoyed widespread use around the world, and are the lining type of choice for tunnels constructed using a shielded tunnel boring machine. However, there is sig
Sep 17, 2014
-
Risk Management and Use of a Geotechnical Baseline Report for a Competitive Alliance Procurement?ProcessBy T Ireland, S Eratne, W Newns, P Spies
The approach to risk management during the procurement of major projects often has a significant outcome on the ultimate delivery of a project. The NZ$1.4 B Waterview Connection project is the largest
Sep 17, 2014
-
The Impact of Pile Loading on Adjacent Metro Tunnels – Barangaroo South, AustraliaBy P K. Wong, D A. F Oliveira, F M. Azad
In situations where foundation piles are located in proximity to existing or future tunnels, it is typical for the tunnel owner to require that sleeving of the piles be carried out to at least the inv
Sep 17, 2014
-
Design and Construction of Sydney’s South West Rail Link Hume Highway UnderpassBy B Chapman, R Nievergelt, J Hill
A major component of Sydney’s new South West Rail Link project is the Hume Highway Underpass (HHU), an 80 m long twin track mined tunnel excavated at a depth of just 5 m below the pavement of the Hume
Sep 17, 2014
-
Full-round Numerical Modelling of a Macro Synthetic Fibre Reinforced Tunnel Boring Machine Tunnel in the Shanghai Metro ExtensionBy L Nagy, K P. Juhasz
The authors were engaged to optimise a traditional rebar cage reinforced concrete segmental lining by means of finite element analysis (FEA) using macro synthetic fibres for the Shanghai metro extensi
Sep 17, 2014
-
Improving Excavation Efficiency at the St Helena Tunnel Using Best Practice Drill and Blast TechniquesBy D Miller, M Dowling, R Domotor
"This paper is focused on blasting activities undertaken as part of the Pacific Highway Upgrade – Tintenbar to Ewingsdale – project (T2E). This is a ‘priority 1’ Pacific Highway road construction proj
Sep 17, 2014
-
Opening Supports to Segmental Linings – A Novel Shotcrete Support SolutionBy M Burdick, A Harding, M Krulc, M Chappell
Substantial schedule advantages can be made on projects if cross-passage construction can occur at the same time as tunnel boring machine (TBM) operation with little or no impact on TBM logistics. How
Sep 17, 2014
-
High-pressure Fissure Grouting for Drill and Blast Tunnelling, Ambuklao, PhilippinesBy C Harrison, A Bowskill
The Ambuklao hydroelectric dam was originally constructed in the 1950s in the remote and mountainous region of the northern Philippines. Following its construction the dam has suffered heavily due to
Sep 17, 2014
-
The Challenge of Waterproofing Cross Passages in Segmentally Lined Tunnel Boring Machine TunnelsBy E P. O’Dwyer
Segment and gasket lining in tunnel boring machine (TBM) tunnels; and sheet membrane lining systems in driven tunnels are robust waterproofing systems each with a proven history of performance in Aust
Sep 17, 2014
-
Comparison of Glass-fibre Reinforced Polymer Rock Bolts with Double Corrosion Protection Steel Rock Bolts for Use in Tunnel ApplicationsBy S J. Clarke, G Sieders
Double corrosion protection (DCP) rock bolts have evolved to become complicated assemblies comprising numerous components. This complexity is mainly associated with durability considerations including
Sep 17, 2014
-
Starting the Journey – Launching of the Legacy Way Open Face Tunnel Boring Machines in Mixed Face Ground ConditionsBy M Norbert, D O’Connor
The mainline running tunnels for Legacy Way comprise two tunnel boring machine (TBM) driven tunnels. Both TBM drives commenced at the Launch Portal adjacent the Mt Coot-tha Road. Excessive surface set
Sep 17, 2014
-
The Use of Non-destructive Testing to Identify Defective Rock Bolts – A Case StudyBy B Jones, M Chappell
Permanent rock bolts used to support rock tunnels are required to perform for the design life of the structure as a minimum. Quality of installation is critical to the performance over the life of the
Sep 17, 2014
-
Design and Construction for the Widening of the M2 Norfolk Twin TunnelsBy A L. de Ambrosis, S J. Clarke, R Bertuzzi, J Redelinghuys
The M2 Upgrade Project involved widening 15 km of the existing M2 Motorway, which is a key route in Sydney’s road network. The Norfolk Twin Tunnels in North Epping convey traffic over a 460 m length o
Sep 17, 2014
-
Commercial Underground Space – Planned Development for the FutureBy A C. Robertson
World urban expansion puts constraints on the available land surface area of our major cities both for accommodating people as well as providing infrastructure and services whilst at the same time att
Sep 17, 2014
-
Development of State-of-the-art Connection Types for Pipe Umbrella Support SystemsBy G M. Volkmann
Pipe umbrella support systems – also called canopy tube systems – have been used successfully for tunnelling in challenging ground conditions since the 1970s. Historically, the drilling unit was the l
Sep 17, 2014