Search Documents

Sort by

  • AUSIMM
    Ore Ageing Test Work for the Ok Tedi Skarns

    By M Morey

    Ok Tedi Mine is located eighteen kilometers from the Irian Jaya border in the Star Mountains, Western Province, Papua New Guinea. Sequential flotation concentrators produce a copper / gold concentrate

    Aug 8, 2011

  • AUSIMM
    Keeping Projects on the Rails

    By J Canterford

    Although we have access to a wide range of sophisticated process design and improvement tools in combination with a significant range of case studies, the mineral resource industry still manages to be

    Aug 8, 2011

  • AUSIMM
    Leach Residue and Pregnant Liquor Separation – Process and Capital Comparison of Counter-Current Decantation and Counter-Current Washing with Vacuum Filtration

    By R Klepper

    Separation of leach residue suspended solids from pregnant liquor solution is an important step in hydrometallurgy flowsheets. Alternative flowsheet options are counter-current decantation (CCD) thick

    Aug 8, 2011

  • AUSIMM
    Crushers – An Essential Part of Energy Efficient Comminution Circuits

    By R Bearman

    The importance of crushers in the mining industry declined with the introduction and resultant dominance of AG and SAG based circuits, but the recent move to consider more energy efficient circuits ha

    Aug 8, 2011

  • AUSIMM
    An Approach to High Solids Slurry Pipeline Design

    By M Griffiths

    This paper outlines an approach to high solids slurry pipeline design with data generated from a closed pipe-loop test system. The pressure and flow rate data generated is used to develop a pseudo-she

    Aug 8, 2011

  • AUSIMM
    Agglomeration – The Key to Success for the Murrin Murrin Ni Laterite Heap Leach

    By D Readett

    The most critical variable in the successful establishment of the Murrin Murrin Heap Leach plant was the effective agglomeration of the Ni laterite ore. This paper describes the test work undertaken t

    Aug 8, 2011

  • AUSIMM
    On-Belt Analysis at Sepon Copper Operation

    By T Arena

    To maintain copper recoveries and maximise production at the Sepon Copper Operation it is crucial to control the amount of copper entering the leaching circuit. This requires close control of blending

    Aug 8, 2011

  • AUSIMM
    Fosterville Gold Mine Heated Leach Process

    By M Binks

    The Fosterville Gold mine is located approximately 20km to the East of Bendigo in central Victoria. The gold at Fosterville occurs as solid solution within disseminated arsenopyrite and pyrite. The Fo

    Aug 8, 2011

  • AUSIMM
    Contract Commissioning and Operation of Western Areas’ Cosmic Boy Concentrator

    By C Dick

    Over the past three decades, mining operations have seen a significant increase in the use of contractors for mining, camp management and catering, recruitment, maintenance, power management, and comm

    Aug 8, 2011

  • AUSIMM
    IsaMill™ Design Improvements and Operational Performance at Anglo Platinum

    By C Rule

    In 2003, Anglo Platinum, in a joint development with Xstrata Technology, installed the world’s first 10 000 litre IsaMillTM in a concentrate regrind duty at the Western Limb Tailings Re-treatment Plan

    Aug 8, 2011

  • AUSIMM
    Engineering and Science in Flotation Cell Design

    By J Euston

    In the 1990s round flotation tanks were introduced as a result of the lower fabrication costs for larger cells. It was soon observed that round tanks held a number of further advantages over the tradi

    Aug 8, 2011

  • AUSIMM
    In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine

    By A H. Gray

    Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov

    Aug 8, 2011

  • AUSIMM
    Predicting Variations in Mill Feed

    By P McCarthy

    The relatively new field of geo-metallurgy promises to improve the predictability of mill feed quality and enhance processing outcomes. However, it is subject to the same limitations as the prediction

    Aug 8, 2011

  • AUSIMM
    Secondary Copper Processing using Outotec Ausmelt TSL Technology

    By J Wood

    Steady depletion of the world’s primary copper reserves coupled with a meteoric rise in electronic waste (e-waste) generation has led to secondary copper processing assuming an ever-increasing importa

    Aug 8, 2011

  • AUSIMM
    The Casposo Gold-Silver Project – Process Selection and Design

    By D Connelly

    Silver and gold bearing ore from the Troy Resources NL Casposo Gold-Silver Project, located within the San Juan Province of Argentina contains a complex mix of gold, silver, electrum and silver sulphi

    Aug 8, 2011

  • AUSIMM
    Occurrence and Mineralogical Association of Phosphorus in Australian Bedded Iron Ore Deposits

    By M A. Wells

    The various mechanisms by which phosphorus (P) occurs and is distributed within banded iron formations (BIF)-derived iron ore are examined. In unenriched, precursor BIF P occurs predominantly as discr

    Jul 11, 2011

  • AUSIMM
    Application of Optimisation Technology to Resource Planning Within BHP Billiton Iron Ore

    By D Xu

    BHP Billiton Iron Ore is one of the world’s premier suppliers of iron ore. It currently has operations in Western Australia and Brazil and also has some iron ore interests in West Africa.BHP Billiton’

    Jul 11, 2011

  • AUSIMM
    The Product Quality System at Cliffs Natural Resources – Koolyanobbing Iron Ore Operations

    By A L. Wills

    Cliffs Natural Resources Pty Ltd (Cliffs) operates iron ore mines in the Koolyanobbing region of Western Australia. Ore is mined from three separate hubs and trucked to Koolyanobbing. There it is crus

    Jul 11, 2011

  • AUSIMM
    Razorback Iron Ore Project – A New Iron District to Meet the Growing Demand of an Iron Hungry World

    By M Flis

    The Razorback Iron Ore Project is a high tonnage, low-grade magnetite deposit that defines a new iron ore district in South Australia. Known since the 1960s, the deposit has come into its own as the i

    Jul 11, 2011

  • AUSIMM
    A Collaborative Approach to Iron Ore Beneficiation at Assmang Khumani Processing Plant

    By S Döpp

    Commencing with early experiences in iron ore beneficiation made at Beeshoek Mine, the paper follows through the process of extensive mineralogical and metallurgical investigations carried out during

    Jul 11, 2011