Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Influence of Vertical Pile Loading on Existing Tunnel Lining in Soft Clay
By R Ayothiraman
Tunnel excavation may induce adverse effects on nearby existing structures/foundations in urban areas. Accurate prediction of tunnelling effects on pile foundations of nearby structures in the urban e
Mar 8, 2011
-
Possible Improvements to Current Design Practices in Fire Safety Design for Road Tunnels
By R Lau
The fire safety design for road tunnels includes the following aspects: active systems, passive provisions and operational procedures. The active systems include the smoke control system, fire suppres
Mar 8, 2011
-
Durability Planning for Underground Infrastructure
By D Wimpenny
Underground infrastructure is often a critical component of transportation and utility schemes. It is characterised by long design lives with limited access for inspection and maintenance. The exposur
Mar 8, 2011
-
Fire Suppression Systems – Protection for People, Concrete or Profits
By A Dix
Fire suppression systems are but one of the many technologies currently available to manage operational tunnel risks. However, the actual reasons for their use are often shrouded in mischievous discus
Mar 8, 2011
-
Marine Recovery of Tunnel Boring Machine from Botany Bay
By S Norman
The Water Delivery Alliance (WDA) was established to design, construct and commission the pump station and desalinated water delivery pipeline to link the desalination plant on the Kurnell Peninsula (
Mar 8, 2011
-
Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation Medi
By M Sparrow
The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun
Mar 8, 2011
-
Performance and Durability Improvements of Precast Concrete Lining Segments with Fibre Reinforcement
By R Winterberg
Concrete is a well established and reliable construction material for the permanent lining of tunnels, but shows some weak performance characteristics, which can be overcome by the addition of special
Mar 8, 2011
-
Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects
By J P. Burr
The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co
Mar 8, 2011
-
Rock Bolts for Permanent Tunnel Lining
By J de Witte
When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i
Mar 8, 2011
-
The Need for Specification Development in Australian Road Tunnels
By T Brown
Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty
Mar 8, 2011
-
Waterproof Detailing in Drained and Undrained Tunnels
By J Palise
As cities become more populated and the need for tunnelling increases, we continue to dig deeper urban tunnels in more challenging ground conditions. At the same time our expectations for durability a
Mar 8, 2011
-
Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons Learnt
By M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
-
The Development of a Fan Range to Meet Increasingly Demanding Safety Criteria Inside Tunnels
By A G. Sheard
Fire safety requirements inside tunnels have become more demanding as tunnel designers consider the impact of potentially larger fires. Tunnel ventilation equipment is required to clear hot gases in t
Mar 8, 2011
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project
By M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
Recommended Design Methods and Serviceability Limits for Permanent Rock Bolts
By D J Maconochie
The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with
Mar 8, 2011
-
The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations
By S Goff
The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the
Mar 8, 2011
-
Characterization of AZ91 Type Alloy with Silicon Addition
By S. Lun Sin
In this study, the effect of silicon on the microstructure, mechanical properties and hot tearing susceptibility of permanent mould cast AZ91E magnesium alloy was investigated. Varying amounts of sili
Jan 1, 2011
-
Rahmenbedingungen für eine nachhaltige Kohlenutzung in Deutschland
By F. -J. Wodopia
Sustainability of energy supplies has been an issue of general interest for a long time. Whilst in the past the continuous productive use of natural commodities was in the fore, its compatibility with
Jan 1, 2011
-
Deepsea Mining, For The Benefit Of Mankind - Introduction
By Robert Heydon
With the United Nations Conference on Sustainable Development fast approaching it is timely to reflect on the integral role seafloor polymetallic nodule mining will play in facilitating sustainable de
Jan 1, 2011
-
Effects of the Melt Thermal Treatment Process on the Tensile Properties of 356 Type-Alloys
The tensile test results of as-cast A356.2 grain-refined alloy castings show that the tensile strength can be improved by strontium modification (`SrM'), superheating at 900°C OM, and melt therma
Jan 1, 2011