Search Documents

Sort by

  • AUSIMM
    Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation Medi

    By M Sparrow

    The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun

    Mar 8, 2011

  • AUSIMM
    Performance and Durability Improvements of Precast Concrete Lining Segments with Fibre Reinforcement

    By R Winterberg

    Concrete is a well established and reliable construction material for the permanent lining of tunnels, but shows some weak performance characteristics, which can be overcome by the addition of special

    Mar 8, 2011

  • AUSIMM
    Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects

    By J P. Burr

    The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co

    Mar 8, 2011

  • AUSIMM
    Rock Bolts for Permanent Tunnel Lining

    By J de Witte

    When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i

    Mar 8, 2011

  • AUSIMM
    The Need for Specification Development in Australian Road Tunnels

    By T Brown

    Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty

    Mar 8, 2011

  • AUSIMM
    Waterproof Detailing in Drained and Undrained Tunnels

    By J Palise

    As cities become more populated and the need for tunnelling increases, we continue to dig deeper urban tunnels in more challenging ground conditions. At the same time our expectations for durability a

    Mar 8, 2011

  • AUSIMM
    Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons Learnt

    By M Weeks

    Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen

    Mar 8, 2011

  • AUSIMM
    The Development of a Fan Range to Meet Increasingly Demanding Safety Criteria Inside Tunnels

    By A G. Sheard

    Fire safety requirements inside tunnels have become more demanding as tunnel designers consider the impact of potentially larger fires. Tunnel ventilation equipment is required to clear hot gases in t

    Mar 8, 2011

  • AUSIMM
    Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement Project

    By M Behrens

    The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th

    Mar 8, 2011

  • AUSIMM
    Recommended Design Methods and Serviceability Limits for Permanent Rock Bolts

    By D J Maconochie

    The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with

    Mar 8, 2011

  • AUSIMM
    The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction Considerations

    By S Goff

    The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the

    Mar 8, 2011

  • CIM
    Characterization of AZ91 Type Alloy with Silicon Addition

    By S. Lun Sin

    In this study, the effect of silicon on the microstructure, mechanical properties and hot tearing susceptibility of permanent mould cast AZ91E magnesium alloy was investigated. Varying amounts of sili

    Jan 1, 2011

  • SME
    Rahmenbedingungen für eine nachhaltige Kohlenutzung in Deutschland

    By F. -J. Wodopia

    Sustainability of energy supplies has been an issue of general interest for a long time. Whilst in the past the continuous productive use of natural commodities was in the fore, its compatibility with

    Jan 1, 2011

  • IMMS
    Deepsea Mining, For The Benefit Of Mankind - Introduction

    By Robert Heydon

    With the United Nations Conference on Sustainable Development fast approaching it is timely to reflect on the integral role seafloor polymetallic nodule mining will play in facilitating sustainable de

    Jan 1, 2011

  • CIM
    Effects of the Melt Thermal Treatment Process on the Tensile Properties of 356 Type-Alloys

    The tensile test results of as-cast A356.2 grain-refined alloy castings show that the tensile strength can be improved by strontium modification (`SrM'), superheating at 900°C OM, and melt therma

    Jan 1, 2011

  • SME
    Hard Rock Mining - Better Fragmentation Through Teamwork At The Dos Pobres Mine In Safford, AZ

    By D. Brandt

    The Dos Pobres Mine is a copper oxide heap-leach operation located near Safford, AZ. Mine production is 163 kt/d (180,000 stpd) with a stripping ratio of 2:1. During the startup phase of the mine, th

    Jan 1, 2011

  • ISEE
    Advantages of EFI Based Detonator Technology in Commercial Blasting Applications

    By Richard Givens, Thomas Baginski

    Technological advancements in warhead designs and implementations have driven the development of arrayed initiation networks of highly accurate, highly reliable, and extremely safe detonators. Recent

    Jan 1, 2011

  • CIM
    Canadian Hot Workability Research on Al Alloys 1960 ? 2010

    By H. J. McQueen

    Before 1950, hot working was simply deforming above the recrystallization point and gave a soft product compared to cold working. From 1960 onwards, improved testing in compression and torsion (stress

    Jan 1, 2011

  • CIM
    A Success Path from Process R&D to Commercial Plants

    By A. Tohn, L. May, Adham. K.

    The path from process conception to commercial implementation poses significant technical, economic, and sometimes political challenges for every project team. Solving the technical challenges typical

    Jan 1, 2011

  • SME
    John N. Murphy: An Interview With The 2011 SME President

    What is your assessment of the status of the mining industry as we see some evidence of an economic recovery? I am optimistic about the short and midterm prospects for the industry and, hence, for th

    Jan 1, 2011