Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Innovative Victoria Park Tunnel design is Communicated Effectively to Stakeholders with the Aid of Three-Dimensional Visualisation MediBy M Sparrow
The Victoria Park Tunnel project is an inner-city alliance project in central Auckland, New Zealand. The existing two-directional viaduct will be modified to single-direction flow, and a new northboun
Mar 8, 2011
-
Performance and Durability Improvements of Precast Concrete Lining Segments with Fibre ReinforcementBy R Winterberg
Concrete is a well established and reliable construction material for the permanent lining of tunnels, but shows some weak performance characteristics, which can be overcome by the addition of special
Mar 8, 2011
-
Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their EffectsBy J P. Burr
The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co
Mar 8, 2011
-
Rock Bolts for Permanent Tunnel LiningBy J de Witte
When used in suitable ground conditions, rock bolts can have advantages over other permanent tunnel lining solutions. Permanent rock bolts offer flexibility in tunnelling profile and rapid rock bolt i
Mar 8, 2011
-
The Need for Specification Development in Australian Road TunnelsBy T Brown
Australia is now committed to the most significant period of infrastructure investment since the 1960s and the current climate of project finance and public private partnership (PPP) model uncertainty
Mar 8, 2011
-
Waterproof Detailing in Drained and Undrained TunnelsBy J Palise
As cities become more populated and the need for tunnelling increases, we continue to dig deeper urban tunnels in more challenging ground conditions. At the same time our expectations for durability a
Mar 8, 2011
-
Sandgate Avenue Flood Alleviation Project, Stage 1 –Slurry Treatment Plant – Lessons LearntBy M Weeks
Melbourne Water Corporation, through the Pipelines Alliance, has commenced construction of a new drainage pipeline to provide additional flood protection within the Sandgate Avenue Main Drain catchmen
Mar 8, 2011
-
The Development of a Fan Range to Meet Increasingly Demanding Safety Criteria Inside TunnelsBy A G. Sheard
Fire safety requirements inside tunnels have become more demanding as tunnel designers consider the impact of potentially larger fires. Tunnel ventilation equipment is required to clear hot gases in t
Mar 8, 2011
-
Steel Immersed Tube Tunnels where Tunnel Boring Machines Cannot Operate – Yarra River Crossing Construction on the Melbourne Main Sewer Replacement ProjectBy M Behrens
The Melbourne Main Sewer Replacement (MMSR) is a major urban infrastructure project involving approximately 2.3 km of tunnelling and construction works. The works extend from Docklands Precinct, on th
Mar 8, 2011
-
Recommended Design Methods and Serviceability Limits for Permanent Rock BoltsBy D J Maconochie
The use of rock bolts as permanent support has been prohibited by client specifications in several recent large tunnel projects in Australia. The justification for this appears to lie in concerns with
Mar 8, 2011
-
The Use of Glass-Fibre Reinforced Plastic on the Northern Sewerage Project Stage 1 – Design and Construction ConsiderationsBy S Goff
The Northern Sewerage Project (NSP) is a $650 M infrastructure project that will increase the capacity of the sewerage system for Melbourne’s growing northern suburbs while also helping to protect the
Mar 8, 2011
-
Characterization of AZ91 Type Alloy with Silicon AdditionBy S. Lun Sin
In this study, the effect of silicon on the microstructure, mechanical properties and hot tearing susceptibility of permanent mould cast AZ91E magnesium alloy was investigated. Varying amounts of sili
Jan 1, 2011
-
Rahmenbedingungen für eine nachhaltige Kohlenutzung in DeutschlandBy F. -J. Wodopia
Sustainability of energy supplies has been an issue of general interest for a long time. Whilst in the past the continuous productive use of natural commodities was in the fore, its compatibility with
Jan 1, 2011
-
Deepsea Mining, For The Benefit Of Mankind - IntroductionBy Robert Heydon
With the United Nations Conference on Sustainable Development fast approaching it is timely to reflect on the integral role seafloor polymetallic nodule mining will play in facilitating sustainable de
Jan 1, 2011
-
Effects of the Melt Thermal Treatment Process on the Tensile Properties of 356 Type-AlloysThe tensile test results of as-cast A356.2 grain-refined alloy castings show that the tensile strength can be improved by strontium modification (`SrM'), superheating at 900°C OM, and melt therma
Jan 1, 2011
-
Hard Rock Mining - Better Fragmentation Through Teamwork At The Dos Pobres Mine In Safford, AZBy D. Brandt
The Dos Pobres Mine is a copper oxide heap-leach operation located near Safford, AZ. Mine production is 163 kt/d (180,000 stpd) with a stripping ratio of 2:1. During the startup phase of the mine, th
Jan 1, 2011
-
Advantages of EFI Based Detonator Technology in Commercial Blasting ApplicationsBy Richard Givens, Thomas Baginski
Technological advancements in warhead designs and implementations have driven the development of arrayed initiation networks of highly accurate, highly reliable, and extremely safe detonators. Recent
Jan 1, 2011
-
Canadian Hot Workability Research on Al Alloys 1960 ? 2010By H. J. McQueen
Before 1950, hot working was simply deforming above the recrystallization point and gave a soft product compared to cold working. From 1960 onwards, improved testing in compression and torsion (stress
Jan 1, 2011
-
A Success Path from Process R&D to Commercial PlantsBy A. Tohn, L. May, Adham. K.
The path from process conception to commercial implementation poses significant technical, economic, and sometimes political challenges for every project team. Solving the technical challenges typical
Jan 1, 2011
-
John N. Murphy: An Interview With The 2011 SME PresidentWhat is your assessment of the status of the mining industry as we see some evidence of an economic recovery? I am optimistic about the short and midterm prospects for the industry and, hence, for th
Jan 1, 2011