Search Documents

Sort by

  • CIM
    New Data on Hematite Solubility in Sulphuric Acid Solutions from 130 To 270°C

    Accurate hematite solubility data are required to construct predictive solution chemistry models for complex hydrometallurgical solutions. These data are useful in understanding Fe(III) speciation and

    Jan 1, 2006

  • AUSIMM
    Modelling the Initial Pit Design - The First Step for Project Valuation

    By R Wolff

    One critical factor in open pit mining projects is the estimation of the recoverable reserves. The reason for this is that at the valuation stage there is a lack of information about future metal pric

    Jan 1, 2006

  • CIM
    Effect of Silicon and Copper Content in the 3XX Series Aluminum Alloys on Thermal Processing and Mechanical Integrity

    By J. H. Sokolowski, R. I. MacKay

    The level of Si and Cu in the 3xx series of alloys affects the volume fraction of the a-Al dendritic phase and the Al-Si eutectic phase. The volume fraction of these phases in turn affects the feeding

    Jan 1, 2006

  • CIM
    Aluminium Reduction: Star-Bag(TM) Technology Advances Potline Fume Scrubbing Efficiency

    By B. M. Currell, M. J. Neate, P. W. Bowden

    Historically the hydrogen fluoride laden fume emitted from the electrolytic cells in the aluminium reduction process is further treated in pulse jet dust collectors. These dust collectors act as dry s

    Jan 1, 2006

  • DFI
    Conference Papers - Conference Papers: Session 1 - Construction Of A Deep Basement On A Sloping Site In Glasgow: The Aurora Project

    By H. Boghosian

    This paper presents the design and construction of a deep basement in a steeply sloping site in glacial till in Glasgow city centre. Existing foundations, adjacent structures and services, in tandem w

    Jan 1, 2006

  • SAIMM
    Applied Ergonomics For Operator Compartment Design In An EJC 88 XLP Loader

    By S. Thorley

    In engineering design of operator?s compartments, in underground mining equipment, ergonomics principles are often neglected or not given the full recognition they deserve. This paper defines ergonomi

    Jan 1, 2006

  • SME
    An Evaluation Of The Strength Of Slender Pillars

    Pillars with width to height ratios of less than 1.0 are frequently created in underground hard rock mines. The strength of slender pillars can be estimated using empirically developed equations. Ho

    Jan 1, 2006

  • CIM
    The Flat Landing Brook Zn-Pb-Ag Massive Sulfide Deposit, Bathurst Mining Camp, New Brunswick, Canada

    By D. R. Lentz, J. A. Walker

    "Abstract -The Flat Landing Brook Zn-Pb-Ag deposit of the Bathurst Mining Camp occurs within a narrow thrust-bound nappe containing felsic volcanic and volcaniclastic rocks of the Tetagouche Group. Wi

    Jan 1, 2006

  • SAIMM
    Mining By Rock Cutting In Narrow Reefs

    By K. Moxham, A. Smit, R. Pickering

    Since the early 1970s research has been ongoing to develop a cost-effective way of continuously mining the narrow reef, hard rock, typical of South African gold and platinum mines. In the late1980s it

    Jan 1, 2006

  • DFI
    Engineering The Mansion's Heritage

    By Ken MacLeod

    A development at 83 Queens Road in Melbourne, Australia required construction of a three level basement. The normal geotechnical constraints of excavating adjacent to an existing relatively new buildi

    Jan 1, 2006

  • CIM
    A Method of Appraising Lost Production for Mined-Through Coal-Bed Methane Wells

    By Philip W. Johnson, Charles D. Haynes

    "Abstract - The coalbed methane industry has become a prominent source of domestic natural gas, with its technology having evolved over the past 30 years. Whereas most coalbed methane wells are able t

    Jan 1, 2006

  • CIM
    Co-Precipitation of Arsenic with Ferric Ions: Disposal Strategy for Inco's New Weak Acid Treatment Plant Sludge

    By K. Hardy

    As part of Inco's $115 million Fluid Bed Roaster SO2 Abatement Project, a new weak acid treatment plant (WATP) was constructed to treat bleed solutions from the Copper Cliff Smelting Complex gas-

    Jan 1, 2006

  • DFI
    Large Diameter Steel Pipe Piles Running Under Self Weight In Soft Clay ' Predicted Vs. Observed Behavior ' Richmond San Rafael Bridge Seismic Retrofit

    By A. R. Dover

    The Richmond San Rafael Bridge (Figure 1) is a 4.3 mile long major toll bridge span across northern San Francisco Bay. Tutor-Saliba/Koch/Tidewater (TSKT) conducted a comprehensive seismic retrofit, wh

    Jan 1, 2006

  • CIM
    La Route Vers L'objectif Zéro E.A.

    By J. Petit, P. Girard, A-M. Gilbert, D. Faucher

    L'annee 2000 a été une année stratégique et significative pour l' Aluminerie de Bécancour dans la réduction des gaz a effets de serre. L' équipe s' etait donne comme defi un jour d

    Jan 1, 2006

  • AUSIMM
    WaihiÆs 2020 Vision: Part A: The Community's Blue-print

    Gold was discovered at Waihi in 1878. In 1987 the modern Martha Mine opened in the middle of the town of Waihi. Newmont Waihi Gold as the current licence holder has been operating the mine since 2000.

    Jan 1, 2006

  • AUSIMM
    The Mine Manager's Toolkit

    As the surrounding environment continues to change and evolve, mine managers face a changing climate of expectations. TodayÆs mine managers must juggle competing pressures to deliver sound social, env

    Jan 1, 2006

  • CIM
    Cavity Monitoring System and Stope Analysis

    By John D. Lupton

    This paper will discuss the benefits and advantages of using 3D survey data in stope analysis. Obtaining detailed 3D survey data of underground mine progress and production is a challenge. It is almos

    Apr 1, 2005

  • CIM
    Is the Mineral Resource Grade Estimate Realistic?

    By Terry A. Lee

    The grade of mineral resource estimates underpin all major economic considerations of mining prospects. While there are reporting requirements to satisfy when stating a mineral resource estimate, an

    Apr 1, 2005

  • CIM
    Progressive Failure of Norite Rock Under Biaxial Loading Condition

    By Hani S. Mitri

    Strainbursts in brittle rock are common to deep underground mines. The state of stress at the boundary of mine openings is dictated by a biaxial stress/loading condition. This paper reports the result

    Apr 1, 2005

  • CIM
    Safe Rapid Drifting ? Practical Constraints

    By Fidelis T. Suorineni

    Rapid drifting enables quicker access to orebodies, higher productivity rates and a resultant reduction in activity costs. Increased advance rates, by examination of the key components (face preparati

    Apr 1, 2005