Search Documents

Sort by

  • IMPC
    Collector Screening by TOF-MS for Platinum & Palladium Flotation

    By Frank Cappuccitti, Stephen Chryssoulis, Stamen Dimov

    Surface organic microanalysis of platinum (Pt) and palladium (Pd) minerals by TOF MS1 is an attractive complement and potential alternative to conventional collector screening methods. Its attractiven

    Jan 1, 2003

  • AUSIMM
    Economic and Environmental Constraints on Use of South Island Resources for Power Generation

    Since the early 1990s it has been evident that electricity demand has outstripped investment in generation and transmission. At the same time, concerns were being expressed about the risks associated

    Jan 1, 2003

  • AUSIMM
    Mine Waste Cover System Design ù Linking Predicted Performance to Groundwater and Surface Water Impacts

    By C Wels

    Current best management practice requires the placement of a cover onto most types of mine waste including tailings, waste rock and/or spent heap leach rock at closure of the mine. The objectives of a

    Jan 1, 2003

  • AUSIMM
    Comparison of Acid Production From Pyrite and Jarosite

    By M Berndt

    Four siltite-argillite rock samples were characterised (particle size, chemistry, mineralogy) and subjected to laboratory dissolution testing for 36 to 298 weeks. In two samples sulfur (0.99, 1.69 wt

    Jan 1, 2003

  • SAIMM
    The influence of conditional bias in optimum ultimate pit planning

    By E. J. Magri, A. Couble

    Kriging estimates of geological resources are sometimes conditionally biased because the kriging plan contains too few samples. This may be done purposely in order to match the variance of the estimat

    Jan 1, 2003

  • AUSIMM
    Settling Pond Design and Construction for the Malvern Hills Coal Project, Canterbury

    The Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very

    Jan 1, 2003

  • AUSIMM
    The Integrity of Cover Systems ù An Update

    By D J. Williams, E M. Rykaart

    Soil cover systems are routinely used to reduce acid rock drainage (ARD) from mine waste rock dumps and tailings impoundments. A technology for the analysis, design, instrumentation and monitoring of

    Jan 1, 2003

  • AUSIMM
    Acid Rock Drainage Prediction and Waste Rock Segregation Plan for Ankerite-Containing Mine Waste ù Restigouche Mine Case Study

    By R Carreau

    The results of a detailed acid rock drainage (ARD) prediction program were used to revise the waste rock segregation criteria at the Restigouche open pit mine. Waste rock at the site was predominately

    Jan 1, 2003

  • IMPC
    Interactions of Gum Depressants With Talc: Study of Adsorption by Spectroscopic and Allied Techniques (aa77a54c-5717-4f5a-be7a-06ed41804108)

    By P. Somasundaran, G. Anastassakis, Z. Pan, D. R. Nagaraj

    Gums are often used as depressants for talceous gangue minerals in the flotation of nickel and platinum bearing ores. However, the mechanisms of gum adsorption on talc are not clearly established. In

    Jan 1, 2003

  • AUSIMM
    Storys Creek Remediation Program

    By J Miedecke

    A metalliferous mine has operated at Storys Creek from the 1890s to 1979. Storys Creek drains from a pristine catchment and National Park and remains as the most degraded stream from historic mining i

    Jan 1, 2003

  • TMS
    Heap Leach Modeling ? The Current State Of The Art

    By David G. Dixon

    From its first implementation for the recovery of gold from low-grade ores by cyanidation in the early 1970s, heap leaching has developed into a key hydrometallurgical technology, in conjunction with

    Jan 1, 2003

  • SME
    Silica Dust Sources In Underground Metal/Nonmetal Mines - Two Case Studies (4bbb9237-e646-4345-b5e7-01298aa32028)

    By R. H. Grau

    The National Institute for Occupational Safety and Health's Pittsburgh Research Laboratory is now involved in research to identify silica dust generation in underground metal/nonmetal mines. The

    Jan 1, 2003

  • AUSIMM
    Ore Control and Reconciliation to Maximise Metal Delivery ù A Case Study at Ridgeway Gold Mine

    By G Smart, D Ward, J Grace

    Ridgeway Gold Mine is part of Cadia Valley Operations which is wholly owned and managed by Newcrest Mining Limited. It is an underground sublevel cave (SLC) operation mining approximately 5 Mt per ann

    Jan 1, 2003

  • AUSIMM
    The Goldamere Agreement ù A Co-operative Mutually Beneficial Environmental Management Framework for the Remediation of Acid Rock Drainage

    The Savage River open cut magnetite mine is located in rugged terrain in densely rain forested northwest Tasmania. The mine and concentrating plant are both in the Savage River valley. Pickand Mather

    Jan 1, 2003

  • SME
    Development Of A Life Cycle Assessment Model For Metalliferous Mining Projects

    The minerals industry contributes to the economic growth, prosperity and quality of life of nations, particularly in areas where there might be limited opportunities for employment in other sectors. H

    Jan 1, 2003

  • IMPC
    Lead Recycling from Automotive Batteries: an Hydrometallurgical Case Study

    By Ramon V. V de Araújo, Roberto B. E Trindade, Pablo R. Fica-Piras

    "Lead has been reported to affect blood vessels and kidneys. It also produces adverse effects in the mental and physical development of children and nervous system of adults. It is also considered as

    Jan 1, 2003

  • AUSIMM
    Auditing Resources and Reserves at Newmont Australia

    Risk management for resources and reserves includes examining the fundamental processes of data collection, interpretation, modelling and estimation. Newmont Australia has developed a procedures manua

    Jan 1, 2003

  • SAIMM
    Integration of seismic observations from deep level gold mines with dynamic numerical modelling

    By M. W. Hildyard, M. O. Kataka

    Seismic integration schemes aim to incorporate the rock mass response provided by the historical seismic activity to improve the ability of numerical models to reproduce future response to mining. Up

    Jan 1, 2003

  • AUSIMM
    Risk Management in the Environmental Approvals Process

    The proponents of new mining projects always run the risk that their project is deemed to be not in the public interest. Nothing to be done here except to try and pick it earlyùit is, after all, the a

    Jan 1, 2003

  • AUSIMM
    Methodology for Calculating the Closure Water Balance for an Acid Generating Tailings Impoundment

    By G W. Wilson

    Rehabilitation of tailings impoundments is one of the most challenging aspects in mine closure, as not only does the potential for producing leachate pose a challenge to the rehabilitation designer, b

    Jan 1, 2003