Ground-Supported Working Platforms For Tracked Plants And Mobile Cranes – Investigations Of Intercaction Effects
By Moritz Schleeh, Christian Moormann
Temporary working platforms are generally required in order to ensure that heavy construction machinery such as drilling and trench wall units, pile drivers, vehicle and crawler cranes can be set up s
May 1, 2022
-
Refurbishment Of A Piled Commercial Building With A Single Level Basement For A 70% Increase In Floor Area
By Henry H. Tayler, Eric Sturel
1 Triton Square was originally a six-storey building with a one-level basement located within a commercial development near Euston, London. It was designed and constructed in the 1990s and the foundat
May 1, 2022
-
Safety And Economics Of Working Platforms – A Uk Perspective
By David Corke
The paper presents the development of Federation of Piling Specialists (FPS) calculation of rig track loading, the production of the Building Research Establishment document “Working platforms for tra
May 1, 2022
-
Pneumatic Sinking 2.0: A World Record Caisson Project By Large Scale Innovations Evolution In Theory And Revolution In Practice
By Bartho J. Admiraal, Antoine Feddema
Pneumatic sinking of caissons has been established from mid-19th century. The technique of pneumatic sinking has been applied on many projects for underground construction up to depths over 20m below
May 1, 2022
-
Use Of Geospatial Project Information Management Systems On Diaphragm And Secant Pile Walls
By Andrew Higgins, Jamey Rosen
This presentation will demonstrate some recent advancements in the applications of Project Information Systems (PIMS) technology to seepage barrier walls in the context of evolving Owner Specification
May 1, 2022
-
Foundation Reuse And Strengthening Works At 65 And 67-69 Whitfield Street, London
By Shields H. Arup
The paper describes the innovative foundation reuse and strengthening works for two buildings in Central London. A 1950s building on piled foundations (65 Whitfield St) and a 1930s building (67-69 Whi
May 1, 2022
-
Bio-Grout Based Soil Improvement
By Terzis D. PhD, Katterbach M.
While awareness around the environmental impact of existing grout materials and chemical binders is increasing rapidly, biotechnologies are growing traction as sustainable alternatives in groundwork o
May 1, 2022
-
Embodied Carbon Assessment For A Multi-Phased Development Pile Testing Strategy
By Jack Taggart, Chris Barker
Pile load testing strategies for large infrastructure projects and multi-phase building developments have historically justified cost and programme benefits for undertaking advance preliminary and wor
May 1, 2022
-
Rapid Load Testing In Germany
By Marcel Bielefeld, Joost Bakker, Rob van Dorp
Pile load testing can be performed by a static, rapid or high strain dynamic (generally designated as dynamic) testing method. The static load test is often considered the “gold standard” of testing w
May 1, 2022
-
Automation Of Pile Foundation Design Post-Processing To Produce Pile Plans
By Rajasekar Subbian, Jessica Oudhof
In the Netherlands pile foundation design is done using CPTs in accordance with EC7 national annexure. The capacity per tip level is calculated for every CPT followed by zonation to find the tip level
May 1, 2022
-
Back-Calculations Of Centrifuge Tests On Pile Groups Subjected To High-Cyclic Loading
By Torsten Wichtmann, Jan Macheck, Frederik Broz, Patrick Staubach, Hauke Zachert
The majority of heavy or strongly loaded structures, for instance high-rise buildings, large span bridges or gas storage tanks are founded on pile groups. However, current design codes and guidelines
May 1, 2022
-
Residual Load Development Case Study In Driven Cast-In-Situ Piles
By Packer M. L
Residual load development in driven precast piles has been widely researched in recent decades, however, cast-in-situ piles are often falsely assumed to be unaffected by this mechanism. In contrast to
May 1, 2022
-
Integration Of Real Time Pile Design By Means Of Building Information Modeling
By Prof. Dr. -Ing. habil. Sascha Henke, Johannes Beck
The growth of Building Information Modeling (BIM) during recent years opens possibilities for integrating new digitally driven design approaches. While parametric design and algorithmic design slowly
May 1, 2022
-
Digital Automation Of Geotechnical Sites – The Development And Essential Role Of An Industry Standardised Design Format
By Scott White, Pishun Tantivangphaisal, Andrew Bell, Chris Barker
There has been considerable advancement in recent years in the tools, both software and hardware, available to allow efficient digitalization of site records during the construction of geotechnical wo
May 1, 2022
-
Field Test Verification Of Ground Bearing Pressure Under Rig Tracks And Implications For Working Platform Design
By Steffen Schweizer, Tadeusz Brzozowski, Alfred Koller, Michał Topolnicki, Jürgen Wäger, Grzegorz Sołtys
A full scale test has been conducted to determine ground bearing pressure under rig tracks. The track loads were recorded in real time using Liebherr's Ground Pressure Visualisation system, and the ve
May 1, 2022
-
Westlink Projects – Geotechnical Challenges During The Execution Phase
By Robert Thurner, Albin Norrman, Sami U. Raja
The West Link is a double track railway project currently under construction in Gothenburg, Sweden. The project includes the construction of 8 kms of track, 6 kms of which will be in tunnels. Beside s
May 1, 2022
-
On The Axial Load-Bearing Behavior Of Vibrated And Impact Driven Full Displacement Piles
By Bastian Hoffmann, Christian Moormann
The paper presents results of an experimental study on the axial load bearing behavior of vibratory driven full displacement piles in comparison with impact driven and cyclic quasi-static installed pi
May 1, 2022
-
Piling Adjacent To Rail Tunnels At King’S Cross Central
By David A. Hart, Barry P. Osborn, Richard J. Totty, Ana T. Carvalho, Max B. Elliott
This paper addresses the experience designing and installing bored piles for the King’s Cross area. This includes continuous flight auger and rotary bored piles, with a range of diameters between 600
May 1, 2022
-
Applying The Carbon Hierarchy To Geotechnical Contractors
By J. E. De Waele, J. J. Lee, M. J. Mulheron, Luke R. Deamer
There is increasing demand for geotechnical contractors to commit to carbon reduction, net zero or science based targets. A lot of focus has therefore been placed on using low carbon materials and low
May 1, 2022
-
Re-Use Of Old Pile Foundations In Amsterdam
By Remco Offenberg, Marcel Bielefeld, Martijn van Delft
The question of the continued suitability of existing foundations arises when the function of the superstructure changes. This can occur when the superstructure is replaced or when the existing struct
May 1, 2022