A New Data Interpretation Approach For Pile Thermal Integrity Testing
By Quanchen Sun, Mohammed Z. E. B. Elsahife, Anthony Fisher, Chris Barker, Jennifer Schooling
A review of the literature shows that pile integrity is a significant concern in pile construction. Recently, a new integrity test, thermal integrity profiling (TIP,) has been put into use in foundati
May 1, 2022
-
Axial Capacities Of Drilled Displacement Piles Predicted By Spt And Cpt Based Methods
By Sam Warren, Antonio Marinucci, Genesis Z. Figueroa, Anne Lemnitzer
Drilled Displacement Piles (DDP) provide an ideal deep foundation solution that combines the benefits of ground improvement with traditional advantages of piling systems. This paper consolidates data
May 1, 2022
-
Use Of The Impression Pile To Reduce Carbon Emissions
By S. E. Stallibrass, A. M. McNamara, J. P. Panchal, Leonardo M. LaLicata
Urban development in congested cities requires a better exploitation of the available surface, leading to taller structures. These buildings are usually founded on piles that have to be increased in d
May 1, 2022
-
Outstanding Issues In Understanding The Behaviour Of Thermally-Activated Pile Foundations
By Teresa M. Bodas Freitas, Arianna Lupattelli, Peter J. Bourne-Webb, Diana Salciarini, Martina Zito, Donatella Sterpi
The thermomechanical response of thermally-activated (TA) piles under monotonic thermal loads is quite well understood and the remaining uncertainties relate to the effect of long-term, cyclic loading
May 1, 2022
-
Design, Construction And Verification Of Temporary Working Platforms – Australian And New Zealand Good Industry Practice
By Martin D. Larisch, Ronald Damen
The design and construction of temporary working platforms for cranes and piling rigs is a high-risk activity. It requires the careful selection of the appropriate input parameters to obtain the corre
May 1, 2022
-
Carbon Footprint Of Common Quay Structures
By Dr Karsten Galipp, Kai-Julian I. Hendler, Prof. Manuel G. Pinheiro, Dr Peter J. Bourne-Webb
With a share of approximately 11% of global greenhouse gas emissions, the construction industry contributes significantly towards climate change. This is why construction projects should not only be a
May 1, 2022
-
Drilled Shaft Design Optimization by Means of Static Load Testing
By Riad Diab
In 2018 the Caisse de Dépôt et Placement du Québec (CDPQ) awarded a $6.3 billion (U.S. dollars) design-build contract to the Joint Venture (JV) team NouvLR for the design and construction of one of th
May 1, 2022
-
Analysis of the behavior of the weld mesh and the rolled mesh against static loads and a dynamic impact, to design the overlap according with the connection method. - RASIM2022
By R. Brändle, R. Luis-Fonseca, R. Cornejo, G. Fischer, G. Von Rickenbach, J. Jarufe
Rock damage around underground excavations has been an important hazard in mines and tunnels. Rock dilation generates buckling that needs to be contained before it causes damage to equipment or safety
Apr 26, 2022
-
Seismic Hazard Assessment and Mapping: A Comprehensive Case Study at Vale’s Garson Mine, Sudbury, ON Canada - RASIM2022
By Matthew Price, Laura Brown, Atulya Verma, Samantha Espley
Burst-prone conditions are a significant hazard in deep hardrock mines, elevating the risk to excavation stability and, more importantly, to worker safety. As mining progresses deeper, induced stress
Apr 26, 2022
-
Performance of Normet Self Drilling Dynamic Bolt (SDDB®) Types in Dynamic Loading – The Energy Dissipating Hollow Core Rockbolt Installed in Normet’s Urea-Silicate Injection Resin - RASIM2022
By Renee Royer, Allan Punkkinen
As mines progress to ever increasing depth, new challenges are encountered with serious concerns for rock excavations in highly stressed conditions. New procedures have been undertaken or are under wa
Apr 26, 2022
-
The Limited Scope of Some Static Support Systems in the Mitigation of Rockburst Events - RASIM2022
By Fredy A. Elorrieta Agramonte, Gabriel von Rickenbach, Roberto Luis Fonseca, David Córdova Rojas, Rolando Romero, Rico Brändle
The mine’s economic life is dynamic by nature. Some factors that create this scenario are the need to recognize new exploitation areas, the evolution of the mineral prices and the development of new t
Apr 26, 2022
-
Establishing a testing criteria to relate the in-situ performance of static and dynamic capable mesh - RASIM 2022
By M. du Plessis, J. P. Gouvea
Mesh based areal support is commonly applied in South-African deep-level gold mines. It forms part of an integrated support system that can cater for both rockfall and rockburst incidents. The applica
Apr 26, 2022
-
Implemented Hazard Mitigation Strategy for DMLZ-DOZ Cave Interaction - RASIM2022
By Hendri Silaen, Charles Leatemia, Monang Napitupulu, John Kamarea, Arwin Edijanto, Riza Hasan, Avesiena Primadiansyah
The Deep Mill Level Zone (DMLZ) is the fourth panel cave mine in the East Ertsberg Skarn System, (EESS) which lies 500 m below the producing Deep Ore Zone (DOZ) mine and up to 1,700 m below the surfac
Apr 26, 2022
-
Forecasting Seismic Potential in a Longwall Coal Mine - RASIM2022
By Jake Beale, Joe Wickline, M. Van Dyke, Ted M. Klemetti
A longwall coal mine in southwestern Virginia mining the Pocahontas #3 Coal Seam experienced a history of mining-related seismic events. The events were never large enough to cause concern until three
Apr 26, 2022
-
Crack Initiation and Damage Evolution in High Porosity Sandstone Under Cyclic Compression - RASIM2022
By Kai Koosmen, Mehdi Serati, Tengzhou Wang
Spalling and rockburst are unwanted brittle failures at the boundaries of underground excavations that are commonly observed in hard rock and high-stress environments at significant depths, although,
Apr 26, 2022
-
Risk Management to Prevent Coal Outbursts in Room-and-Pillar Mining under Deep Cover - RASIM2022
By Peter Zhang, Mark Van Dyke, Ted Klemetti, Morgan Sears
Room-and-pillar mining is a mining method used in the United States to extract coal from underground, and pillar recovery is widely practiced for maximizing coal recovery and mining economics. Under c
Apr 26, 2022
-
The Effect Of Minor Principal Stress On The Crack Damage Stress Threshold - RASIM22
By E Mutaz, M Bahaaddini, D J. Williams, M Serati
The contribution of the mining industry to the global economy has reached (and gone beyond) $1,800 billion in recent years that necessitates (more than before) the need to ensure workability, viabilit
Apr 26, 2022
-
Analysis Of Regional Seismic Activity Recorded In Polish Coal Mines Of The Upper Silesian Coal Basin Against The Background Of Geological And Mining Conditions In 1995 - 2020 - RASIM 2022
By Grażyna Dzik, Adam Mirek, Krzysztof Król
The Upper Silesian Coal Basin is located in the area of the Upper Silesian Syncline and belongs to one of the most complex tectonic units in Europe. It occupies 5,650 km2. In 2020, there were 20 hard
Apr 26, 2022
-
Mitigating the Shakedown Hazard in the DOZ Mine Through Detail Ground Motion, Ground Support and Risk Management Strategies - RASIM 2022
By Jurgens PE Hamman, Faisal Putra, Hadnaltias Alpeki, Willem de Beer
The Deep Ore Zone mine is the third lift of caving at PT Freeport Indonesia’s East Ertsberg Skarn System. An increasing trend in seismicity along the northern boundary of the DOZ cave, as well as the
Apr 26, 2022
-
Predicting Mine-Wide Seismogenic Hazard with Confidence Using Calibrated Numerical Models - RASIM 2022
By Kathy Kalenchuk
To develop strategic and tactical strategies to manage seismic hazard in a safe and economic manner, it is necessary to understand the spatial and temporal distribution of mine wide seismogenic behavi
Apr 26, 2022