Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
RI 8870 - Lignite Recovery of Cobalt3+ From an Ammoniacal Ammonium Sulfate Solution
By G. J. Slavens
The Bureau of Mines has devised technology to recover cobalt, nickel, and byproduct copper from domestic lateritic material using an oxidative, ammoniacal ammonium sulfate leach. Nickel, cobalt, and c
Jan 1, 1984
-
Electrochemical regeneration of cyanide from waste thiocyanate for cyanidation
By K. Enns, J. J. Byerley
"While thiocyanate (SCN-) is used in a number of industrial processes (production of polyacrylonitrile filaments, synthesis of agricultural chemicals and certain metallurgical solvent extraction and f
Jan 1, 1984
-
Design Of The Geologic Program At The Zortman And Landusky Mines, Little Rocky Mountains, Montana
By M. S. Enders, L. M. Rogers
The Little Rocky Mountains host epithermal gold-silver bearing vein and stockwork deposits in a syenite intrusive complex. Pegasus Gold Ltd. is currently mining these oxidized deposits by open-pit met
Jan 1, 1984
-
RI 8852 - Evaluation of Mine Seals Constructed in 1967 at Elkins, Randolph County, WV
By Lester M. Adams
In 1980, the Bureau of Mines surveyed a group of mine seals in Randolph County, WV, to evaluate their effectiveness for reducing toxic pollutants in mine water discharges. The survey focused on 11 blo
Jan 1, 1984
-
RI 8875 - Estimating Horizontal Drain Design by the Finite-Element and Finite-Difference Methods
By D. R. Tesarik
To ensure the stability ofa tailings pond embankment, the height of the phreatic surface must be kept at or below a safe level. In this investigation, the Bureau of Mines analyzed various horizontal d
Jan 1, 1984
-
OFR-132-85 A Borehole Probe For In-Situ Neutron Activation Analysis
By J. A. Baicker
A prototype borehole probe for ore grade determinations by means of in-situ neutron activation analysis was designed, built, and tested in a two-phase program. Phase I dealt with the design and fabric
Jan 1, 1984
-
OFR-83-85 A Comparison Of The Effects Of Various Soil Handling Equipment On The Density Of Prime-Farmland Subsoils
By C. Steve Albrecht
The primary objective of this study is to "evaluate the influences of different equipment systems on prime farmland subsoil compaction due to surface mining in the Midwest." The study is centered on f
Jan 1, 1984
-
OFR-79-93 Vol. I Cross-Ridge Mountaintop Mining Demonstration - Volume I
By Robert L. Lappi
This report covers the final phase of a project demonstrating the economic efficiency of cross-ridge mountaintop coal mining. A demonstration mine was established at Big Wheel Gap in northeastern Tenn
Jan 1, 1984
-
IC 8977 Chromium Availability - Market Economy Countries - A Minerals Availability Program Appraisal
By P. R. Thomas
The Bureau of Mines determined the costs associated with the production of chromium, in the form of chromite and high-carbon ferrochomium, from the demonstated resources of 10 market economy nations.
Jan 1, 1984
-
OFR-125-85 Development Of Modular Irrigation Systems For Reclaimed Strip Mined Lands Incorporating Mycorrhiza Inoculations Trials
By A. Uiga
The U.S. Bureau of Mines funded a project which addressed objectives concerning irrigation of native plants and inoculation of native plants with vesicular-arbuscular mycorrhizal (VAM) fungi. The spec
Jan 1, 1984
-
Mineral Commodity Summaries 1984 - An Up-To-Date Summary Of 87 Nonfuel Mineral Commodities ? Aluminum
1. Domestic Production and Use: In 1983, 12 companies operated 27 primary aluminum reduction plants, with 4 firms accounting for 65% of production. Washington, Oregon, and Montana accounted for 35% of
Jan 1, 1984
-
OFR-10-85 Subsurface Leaching Of Pyritic Coal Mine Spoils And Contaminant Migration - Summary
By Jeffrey P. Schubert
The study site in northeastern Illinois underwent surface mining for coal in 1943 and was reclaimed by the state of Illinois in 1972-1973. Additional soil amendments and seed were applied to the spoil
Jan 1, 1984
-
Introduction (90afc43a-9bbf-49a4-ad96-7149f61d31b5)
Research 84 highlights significant studies conducted during the past fiscal year at Bureau facilities and offices. Readers who want more information about the projects and studies summarized here can
Jan 1, 1984
-
Coal Exploration - Fence Lake Project, Catron County, New Mexico
By Marcie A. Greenberg
The Fence Lake Project is located in the Salt Lake coal field, an extension of the San Juan Basin. Geologic formations exposed in the Project area range in age from late Cretaceous to Quaternary. Coal
Jan 1, 1984
-
OFR-21-85 Conservation And Substitution Technology For Critical Metals In Bearings And Related Components For Industrial Equipment And Opportunities For Improved Bearing Performance - Introduction
By Allen G. Gray
It's not news to you that the United States is highly vulnerable to potential problems in supply of critical and strategic metals, and that these metals - chromium, for example - are employed in
Jan 1, 1984
-
OFR-79-85 Strategic And Critical Materials Program Annual Report
By R. E. Chaney
This report summarizes the research on the Strategic and Critical Materials Program tasks conducted at the Idaho National Engineering Laboratory (INEL) between Mdy 1983 and April 1984. The work is
Jan 1, 1984
-
OFR-115-845 A Medium Frequency Wireless Communication System For Underground Mines
By Larry G. Stolarczyk
This report deals with information regarding a new Medium Frequency (MF) Wireless Communication System for underground mines. This new telecommunication system works on low loss electromagnetic wave
Jan 1, 1984
-
Recent Developments In Subsidence Prediction And Control For The Eastern U.S. Coalfields
By M. Karmis
Underground mining will disturb the natural equilibrium of the rock mass, causing significant stress redistributions in the vicinity of the excavation with corresponding horizontal and vertical displa
Jan 1, 1984
-
Detailed Planning Underscores Expansion of Vulcan's Chattanooga Quarry
By R L. Mayville
The author explains why the strategic location and important limestone reserves at Chattanooga Quarry led to a decision to extend operating life by continued benching down to lower levels. He discusse
Jan 1, 1984
-
Applied Geology: The Foundation For Mine Design At Exxon Minerals Company's Crandon Deposit
By R. G. Hite, R. G. Rowe
The Crandon deposit, located in northern Wisconsin, is a 65.8 million ton Precambrian volcanogenic massive sulfide deposit which averages 1.4% copper and 5.8% zinc. The deposit is classic in origin, m
Jan 1, 1984