    Tunneling Under Highway 401: Construction of Large Diameter Pre-Support Pipe Canopy - RETC2021

    By Tyler Lahti, Peter Borgacci, Mary Jane Ferraro, Prakash Nadesparan

    Toronto Tunnel Partners (TTP), under contract to Metrolinx/IO, is constructing new twin rail tunnels under the Highway 401 & 409 interchange to accommodate additional tracks to support the GO Expansio

    Jun 13, 2021

  • SME
    The Effect of TBM Diameter on Ring Installation Time - RETC2021

    By Jamal Rostami, Tala Tahernia

    TBM utilization rate is a component of machine performance prediction and critical for developing a reliable estimate of the construction completion time and cost of the tunnel. Estimation of the util

    Jun 13, 2021

  • SME
    Design Development of the Brushy Creek Regional Utility Authority Phase 2 Raw Water Delivery System Project - RETC2021

    By Aaron Archer, James Parkes

    This paper presents design considerations for the major underground elements of the pending BCRUA Phase 2 Raw Water Delivery System Project. These elements include two Lake Taps; an 8,800 LF, minimum

    Jun 13, 2021

  • SME
    Transitioning from Mixed-Face Conditions to Hard Rock During TBM Launch on the Reedy River Basin Sewer Tunnel Project— Greenville, SC - RETC2021

    By Horry Parker Jr, Jason Gillespie, Justin Kolster, Stephen O’Connell

    Construction of the 5,932-ft Reedy River Basin Sewer Tunnel in Greenville, SC was marked by a critical transition from drill-and-blast mining in mixed-face conditions to TBM excavation with limited ro

    Jun 13, 2021

  • SME
    Dustless Hard Rock Tunneling Methods - RETC2021

    By Cody Giroux, Homer Scurlock, Michel Wasag

    Silica and Crystalline Quartz exposure continues to be a serious health threat to nearly 2 million workers in the United States, including more than 100,000 working in high risk jobs such as abrasive

    Jun 13, 2021

  • SME
    Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021

    By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar

    The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat

    Jun 13, 2021

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • SME
    Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021

    By Rainer Antretter

    While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under

    Jun 13, 2021

  • SME
    Automatic Computation of TBM Face Pressure Using 3D Ground Model - RETC2021

    By CK Tsang, Jack Muir, Dharman Gersch, Joshua Barry

    Correct face pressure is critical to safe operation of a closed face TBM. If inadequate face pressure is applied, this will lead to excessive ground movement, and may result in collapse of the tunnel

    Jun 13, 2021

  • SME
    Tunnel Induced Settlement and Impact Analysis Automation and 3D Visualization - RETC2021

    By Camilo Quintero, Frank Cesario, John Kinnear, Brian Boye

    In this paper, an innovative approach was adopted to automatically calculate the effects of tunnel induced settlement on buildings and utilities. The approach resulted in increased output quality, con

    Jun 13, 2021

  • SME
    Differing Site Conditions and Dispute Avoidance Under the FIDIC Emerald Book for Underground Works

    By Jürg Künzle

    Underground construction is a matter of dealing with the inherent uncertainty of subsurface geology. If the encountered conditions are less favorable than the expected ones, the execution of excavatio

    Jun 13, 2021

  • SME
    The Bypass Tunnel: Excavation, Interliner, and Lining - RETC2021

    By George Schmitt, Ted Dowey, Grant Millener, Sean McAndrew, Eric Jordan

    The Rondout-West Branch Bypass Tunnel is being built to bypass a substantial leak in New York City’s primary water supply tunnel. The 13,500 foot long tunnel travels 600 feet under the Hudson River th

    Jun 13, 2021

  • SME
    Hybrid Metro Station for Mitigating Construction Disturbance - RETC2021

    By Olivier Martin

    In busy and historic cities, traditional open box metro stations are becoming outrageously difficult, unacceptable for the citizen and uneconomical. Hybrid stations provide an interesting alternative.

    Jun 13, 2021

  • SME
    Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021

    By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield

    During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin

    Jun 13, 2021

  • SME
    Tunneling in Abrasive Alluvial Material Above the Water Table Using a MTBM and an EPBTBM - RETC2021

    By D. Lynn, D. Arthur

    Infrastructures continue to age and drinking water supplies are becoming scarce in the San Fernando Valley of Los Angeles, California. Frontier-Kemper Constructors, Inc. (FKCI) was engaged by the Los

    Jun 13, 2021

  • SME
    CMAR Delivery Targets Effective Management of Risks in Achieving Water Supply Objectives - RETC2021

    By Cary Hirner, Sarah Lothman, Chris Mueller, Savita Schlesinger, Mike Hanna, Ian Fitz-James

    Loudoun Water is currently implementing a quarry to reservoir conversion that will improve water supply reliability in periods of drought and flexibility in water supply operations when turbidity in i

    Jun 13, 2021

  • SME
    Toledo Waterways Initiative—Completion of an 18-Year LTCP Program - RETC2021

    By Leo Gentile, David Selhorst

    The $528 million Toledo Waterways Initiative (TWI) was implemented by the City of Toledo in 2002 and completed in August 2020. Toledo is one of many US cities required to implement a Long-Term Control

    Jun 13, 2021

  • SME
    Upgrading Mount Royal Tunnel to Latest Standards - RETC2021

    By Verya Nasri, Behrouz Esmaeilkhanian, Mohammad Motallebi

    The Mount Royal Tunnel (MRT) is a 100-year-old railway tunnel located in Montreal, Canada. The tunnel is approximately 5 km long, 8.7 m wide and 5.5 m high, with a constant 0.6% grade. This existing t

    Jun 13, 2021

  • SME
    InSAR Monitoring of Tunneling Surface Displacement - RETC2021

    By Brian Young, Ben Pantony

    Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O

    Jun 13, 2021

  • SME
    Tunnel Spitzenberg—Tunnel Drive Hits a Historic Quarry - RETC2021

    By Pafos Busch, Martin Fischer, Johannes Jaeger

    The Spitzenberg Tunnel is a 600 m (1,970 ft) long twin tube motorway tunnel on Germany’s Autobahn A44 between Kassel and Eisenach. Since flexibility was considered to be very important in the continuo

    Jun 13, 2021