    Two-Component Backfill Grouting at the Three Rivers Protection and Overflow Reduction Tunnel: Above and Below Ground Challenges and Solutions - RETC2021

    By Francesco Chiappalone, Tanner Murt, Lance Waddell, Cristina Oñate Salazar

    The 3RPORT project is a 5-mile-long, 16-foot-internal-diameter tunnel excavated in hard rock by Slurry TBM in Fort Wayne, Indiana. Two-component grouting can be separated into two core areas of operat

    Jun 13, 2021

  • SME
    Design and Construction of the New Stormwater Storage and Drainage Tunnel System in the Michigan I‑75 Modernization Segment 3 P3 DBFM Contract - RETC2021

    By David Mast, Amanda Foote, Mina Shinouda

    The Michigan DOT’s I‑75 Modernization Project, Segment 3, is a 30-year, $1.2 Billion design-build-finance-maintain project in Southeast Michigan. The scope includes building a nearly 4-mile long, 14.5

    Jun 13, 2021

  • SME
    Respirable Crystalline Silica Dust—Practical Impacts and Solutions in Tunnelling - RETC2021

    By Rainer Antretter

    While respirable crystalline silica (RCS) dust that arises in industrial production mostly emanates from point sources and can be well mitigated, the extraction of dust is much more difficult in under

    Jun 13, 2021

  • SME
    Automatic Computation of TBM Face Pressure Using 3D Ground Model - RETC2021

    By CK Tsang, Jack Muir, Dharman Gersch, Joshua Barry

    Correct face pressure is critical to safe operation of a closed face TBM. If inadequate face pressure is applied, this will lead to excessive ground movement, and may result in collapse of the tunnel

    Jun 13, 2021

  • SME
    Tunnel Induced Settlement and Impact Analysis Automation and 3D Visualization - RETC2021

    By Camilo Quintero, Frank Cesario, John Kinnear, Brian Boye

    In this paper, an innovative approach was adopted to automatically calculate the effects of tunnel induced settlement on buildings and utilities. The approach resulted in increased output quality, con

    Jun 13, 2021

  • SME
    Differing Site Conditions and Dispute Avoidance Under the FIDIC Emerald Book for Underground Works

    By Jürg Künzle

    Underground construction is a matter of dealing with the inherent uncertainty of subsurface geology. If the encountered conditions are less favorable than the expected ones, the execution of excavatio

    Jun 13, 2021

  • SME
    The Bypass Tunnel: Excavation, Interliner, and Lining - RETC2021

    By George Schmitt, Ted Dowey, Grant Millener, Sean McAndrew, Eric Jordan

    The Rondout-West Branch Bypass Tunnel is being built to bypass a substantial leak in New York City’s primary water supply tunnel. The 13,500 foot long tunnel travels 600 feet under the Hudson River th

    Jun 13, 2021

  • SME
    Hybrid Metro Station for Mitigating Construction Disturbance - RETC2021

    By Olivier Martin

    In busy and historic cities, traditional open box metro stations are becoming outrageously difficult, unacceptable for the citizen and uneconomical. Hybrid stations provide an interesting alternative.

    Jun 13, 2021

  • SME
    Tunnel Vision: Planning a Resilient 21st Century Wastewater System for Houston - RETC2021

    By Brian Gettinger, Jared Barber, Richard Weatherly, Shannon Dunne, Jeff Masek, Chuck Wolf, Fazle Rabbi, Jack Canfield

    During Hurricane Harvey over 60% of the 39 WWTPs, including the low-lying 25 MGD Sims North WWTP, and one third of the 382 lift stations owned and operated by the City of Houston were flooded resultin

    Jun 13, 2021

  • SME
    Tunneling in Abrasive Alluvial Material Above the Water Table Using a MTBM and an EPBTBM - RETC2021

    By D. Lynn, D. Arthur

    Infrastructures continue to age and drinking water supplies are becoming scarce in the San Fernando Valley of Los Angeles, California. Frontier-Kemper Constructors, Inc. (FKCI) was engaged by the Los

    Jun 13, 2021

  • SME
    CMAR Delivery Targets Effective Management of Risks in Achieving Water Supply Objectives - RETC2021

    By Cary Hirner, Sarah Lothman, Chris Mueller, Savita Schlesinger, Mike Hanna, Ian Fitz-James

    Loudoun Water is currently implementing a quarry to reservoir conversion that will improve water supply reliability in periods of drought and flexibility in water supply operations when turbidity in i

    Jun 13, 2021

  • SME
    Toledo Waterways Initiative—Completion of an 18-Year LTCP Program - RETC2021

    By Leo Gentile, David Selhorst

    The $528 million Toledo Waterways Initiative (TWI) was implemented by the City of Toledo in 2002 and completed in August 2020. Toledo is one of many US cities required to implement a Long-Term Control

    Jun 13, 2021

  • SME
    Upgrading Mount Royal Tunnel to Latest Standards - RETC2021

    By Verya Nasri, Behrouz Esmaeilkhanian, Mohammad Motallebi

    The Mount Royal Tunnel (MRT) is a 100-year-old railway tunnel located in Montreal, Canada. The tunnel is approximately 5 km long, 8.7 m wide and 5.5 m high, with a constant 0.6% grade. This existing t

    Jun 13, 2021

  • SME
    InSAR Monitoring of Tunneling Surface Displacement - RETC2021

    By Brian Young, Ben Pantony

    Interferometric Synthetic Aperture Radar (InSAR) has played an integral role in many large scale tunneling projects globally. Until recently, it has been regarded as a complementary monitoring tool. O

    Jun 13, 2021

  • SME
    Tunnel Spitzenberg—Tunnel Drive Hits a Historic Quarry - RETC2021

    By Pafos Busch, Martin Fischer, Johannes Jaeger

    The Spitzenberg Tunnel is a 600 m (1,970 ft) long twin tube motorway tunnel on Germany’s Autobahn A44 between Kassel and Eisenach. Since flexibility was considered to be very important in the continuo

    Jun 13, 2021

  • SME
    Lessons Learned at the Trampas Dam Inlet/Outlet Tunnel - RETC2021

    By Todd Kilduff, Paul Wilkinson

    Microtunneling is rarely a straight forward “business as usual” endeavor. More often than not, these projects take twists and turns that require on the fly, out of the box solutions to get the project

    Jun 13, 2021

  • SME
    Tunneling to Manage Construction Impacts for Albany’s Beaver Creek Clean River Project, Albany, New York - RETC 2021

    By Greg Bold, Mahmood Khwaja, Yuannian (Jerry) Wan, Michael S. Schultz, William Simcoe

    Beaver Creek Clean River Project will satisfy the consent decree requirements by capturing and treating combined sewage overflows. The project consists of, approximately, 2,700 feet of 30-inch trenchl

    Jun 13, 2021

  • SME
    Influence of Large Deep Excavations on Closely Underlying Subway Tunnels and Design of Mitigation Measures - RETC 2021

    By Giuseppe Gaspari, Xiangrong Wang

    The pandemic emergency is forcing transit agencies to define strategies allowing social distancing, which are more challenging in underground interchange stations in crowded downtown cores. Toronto Tr

    Jun 13, 2021

  • SME
    Deep Portal Shafts of the Annacis Island Outfall Tunnels— Building on Pacific Northwest Shaft Design Experience - RETC2021

    By John Newby, Ulf Gwildis, Fred Marquis

    From the Brightwater Conveyance System in Seattle to the Second Narrows Water Supply Tunnel in Vancouver, BC, the design and construction of deep-lying tunnels in the Pacific Northwest often require t

    Jun 13, 2021

  • SME
    Use of a GBR to Deliver Risk Management and Value— City Rail Link, Auckland - RETC2021

    By Tom Ireland, Sumi Eratne

    The approach to Risk Management during the procurement of major projects often has a significant outcome on the ultimate successful delivery of a project. The $NZ4.4B Auckland City Rail Link project i

    Jun 13, 2021