Search Documents

Sort by

  • SME
    A Comparison of Grouting Through Segment Ports Versus Grouting Behind the Tailcan of Two Segmentally Lined Rock Tunnels—Coxwell Sanitary Bypass Tunnel Project in Toronto, ON and Westerly Storage Tunnel Project in Cleveland, OH - RETC2021

    By William Hodder, Lisa Smiley, Ehsan Alav

    The Don River & Central Waterfront Coxwell Sanitary Bypass Tunnel (CBT) Project in Toronto will extend approximately 10.5 km and be lined using a precast concrete segmental tunnel liner with an intern

    Jun 13, 2021

  • SME
    Construction of the Newell Creek Dam Inlet/Outlet Replacement Project - RETC2021

    By David Chastka, Isidro Rivera, Shawna Von Stockhausen, Idit Zarchi

    The City of Santa Cruz Water Department is replacing the existing Newell Creek Dam inlet/outlet works at Loch Lomond Reservoir in the San Lorenzo Valley. The project will improve the City’s overall op

    Jun 13, 2021

  • SME
    Design and Construction Considerations for Intersecting Tunnels—Charleston, SC - RETC2021

    By Lindsey Schneider, Steve Kirk, Michael Miglioretti, Jeffrey P. Kolzow, Kyle White

    The US17 Spring/Fishburne Drainage Improvements Project utilizes a stormwater conveyance tunnel system of approximately 8,250 LF. The tunnel system includes two intersecting tunnels of differing diame

    Jun 13, 2021

  • SME
    The Use of Structural Codes in Tunneling - RETC2021

    By Harry Asche

    Tunnels are frequently specified by owners to be designed to a structural code, often a bridge code. In the USA, AASHTO have created a tunnel code, based on structural principles, the AASHTO LRFD Tunn

    Jun 13, 2021

  • SME
    Laboratory Study of Clay Clogging Issues for EPB TBM Tunneling Applications - RETC2021

    By Jamal Rostami, Wei Hu

    Efficient performance of EPB TBMs in clayey ground is primarily dominated by the flow capability of the excavated muck in the cutterhead and screw conveyor. Currently, Consistency Index approach is us

    Jun 13, 2021

  • SME
    A New Era of Tunneling Planned for Houston—Going Deep to Solve Regional Water Supply, Wastewater, and Drainage Problems - RETC2021

    By Eric Hansen, Todd Wanless, Chris Mueller, Shannon Dunne, Scott Elmer

    Between 2010 and 2018, Houston added more than 1 Million residents; the third largest rate of growth in the nation. With growth, the region faces new challenges with water supply, capacity of its wast

    Jun 13, 2021

  • SME
    Effect of Muck Transportation System on Overall TBM Performance and Downtimes - RETC2021

    By J. Rostami, P. P. Nelson, A. Khetwaln

    Tunnel boring machines (TBMs) can be considered as the method of choice for tunneling in many projects due to the high level of efficiency and high potential productivity, safety, and applicability in

    Jun 13, 2021

  • SME
    Back on Track: The Downtown Rail Extension - RETC2021

    By Meghan M. Murphy, Derek Penrice

    The Downtown Rail Extension (DTX) is principal element of the planned second phase of the Transbay Joint Powers Authority’s (TJPA) Transbay Program. When complete, this regionally critical project wil

    Jun 13, 2021

  • SME
    Unreinforced Slurry Walls as Temporary Support of Excavation for Shafts - RETC2021

    By Arash Dahi Taleghani, Pooyan Asadollahi

    Slurry walls, also known as diaphragm walls, are commonly used as temporary and/ or permanent support of excavation for construction of shafts in soft ground. Through case history, this paper demonstr

    Jun 13, 2021

  • SME
    Advance Rates in Soft Ground Tunnelling - RETC2021

    By Dan Ifrim

    Soft ground tunneling poses major challenges to the underground industry. Most of soft ground tunnels are in highly urbanized areas, often include limited cover, and include a strong trend of increasi

    Jun 13, 2021

  • SME
    Slurry Treatment Plants in Mechanized Tunnelling Operations— Safety, Performance and Cost Factor for Jobsites - RETC2021

    By Gino Vogt

    In mechanized tunnelling operations performance, consumption and safety are main factors for jobsites. One of the most important components effecting these factors, especially in slurry TBM operations

    Jun 13, 2021

  • SME
    Short Startup for a High Pressure Mixshield Tunnel Boring Machine - RETC2021

    By Matthew Burdick, Andrew Rule, Erica Bailey

    The Second Narrows Water Supply Tunnel, Burrard Inlet Crossing project for the Greater Vancouver Water District entails deep shaft construction, subway sized pressurized face tunneling through highly

    Jun 13, 2021

  • SME
    Rehabilitation of an 1880s Limestone Block Tunnel Below an Active Railroad Corridor

    By Anna Eleria, Joseph Welna, Jim Herber, Nathan Campeau

    Constructed by stonemasons over 120 years ago, a portion of the Trout Brook Storm Sewer Interceptor (TBI) owned and operated by the Capitol Region Watershed District in Saint Paul, Minnesota, needed r

    Jun 13, 2021

  • SME
    Performance of Tunnel Segments Reinforced with Synthetic Macro Fibers - RETC2021

    By Todd Clarke, Ralf Winterberg

    For more than a decade the tunneling industry has explored the potential and benefits of macro synthetic fiber (MSF) reinforced concrete solutions for precast tunnel segments. Parallel to industry inv

    Jun 13, 2021

  • SME
    Construction of an Outfall Tunnel Underneath Rio De La Plata - RETC2021

    By Mirko Martini, Marcelo Benaglia, Andrea Codalli

    Riachuelo Lot 3 forms part of a sanitation programme being implemented in Argentina to relieve the Riachuelo river basin from its current contamination. The programme, by far the most important in its

    Jun 13, 2021

  • SME
    Mechanical Versus Manual Shotcrete Application in Underground Construction - RETC2021

    By Lauro Lacerda

    Shotcrete is a highly adaptable and widely used underground construction material at infrastructure and mining projects around the world. In fact, many projects could not have been completed without i

    Jun 13, 2021

  • SME
    Kramer Tunnel—Challenging NATM Tunnelling in Germany’s Alps - RETC2021

    By Roland Arnold, Richard Gradnik, Martin Zeindl

    This paper presents the details of the Kramer tunnel project in the Federal State of Bavaria, Germany. This road tunnel, which has been under construction since December 2019, is the key component of

    Jun 13, 2021

  • SME
    Potential Pathways forMining Operations to Transition to Renewable Energy—a Case Study - Mining, Metallurgy & Exploration (2021)

    By Oliver W. Marsden, John O. Marsden

    This paper presents the results of a hypothetical case study that evaluates the potential transition of a large copper mining and extraction operation to 90% renewable energy. The case study considers

    Jun 4, 2021

  • SAIMM
    Investigation of the mechanism for fireside corrosion in coal-fired boilers in South Africa

    By J. W. van der Merwe, K. G. Moloko

    Furnace wall tubes from 600 MW subcritical boilers at three coal-fired power stations were sampled and the fireside deposits examined to determine the mechanism of fireside corrosion. This involved an

    Jun 1, 2021

  • SME
    Effect of CaF2 on the Reduction Swelling Properties of Iron Ore Briquettes in Different Reduction Stages - Mining, Metallurgy & Exploration (2021)

    By CHENCHEN SUN, GUOPING LUO, GUOCHENG ZHANG

    Preparation of briquettes by adding CaF2 reagent into the Australian iron ore powder. The structure and morphology of iron ore briquettes during various reduction stages (i.e., Fe2O3→Fe3O4, Fe3O4→FeO,

    May 27, 2021