Collaboration and change management, keys to successful automation implementation
By D Kilkenny, D Nardini, P Kline
This paper is a case study highlighting learnings and success in two areas challenging underground miners: change management and collaboration. It examines the implementation process of a new automate
Mar 15, 2021
-
Recovery of the northern mining block at Cliffs Nickel Mine
By M Hopkins, A Mutale, A E. Vidal da Silva
The Cliffs Nickel Mine extracts a narrow near vertical nickel vein using a mining method of underhand bench stoping with paste backfill. In 2014, at a depth of 400 m below surface, the Northern block
Mar 15, 2021
-
Development of the production optimiser through collaboration between Evolution Mining and Minnovare
By C McCracken, R Landers, B Hesse
Minnovare identified the potential to improve production drilling outcomes in underground long-hole stopes through the adaptation of new technology which was under ongoing development. An approach to
Mar 15, 2021
-
A methodology for assessing stope design modifying factors for the Olympic Dam Mine
By S Tierney, D Cumming-Potvin, I Thin, Y Potvin, D Grant
The preliminary modifying factors for future stope design in the Southern Mine Area of Olympic Dam consisted of only a single, arbitrary value of Equivalent Linear Overbreak/Sloughing (ELOS). In order
Mar 15, 2021
-
Increased productivity using theory of constraints at the Argyle Diamond Mine
By B Murphy, N Strong, J Albrecht
Rio Tinto’s Argyle Diamond Mine has a history of underperformance with delivery of ore from the underground operation to the surface for processing with no real clarity in sources of loss and value. I
Mar 15, 2021
-
Increased drilling accuracy leads to significant improvement in ore recovery and dilution
By R Stimpson, B Johnson, B Hesse
During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto
Mar 15, 2021
-
Sublevel caving a narrow vein mine – Pajingo’s case study
By J F. Carswell, G Cheshire
The Pajingo gold operation in Queensland is approximately 55 km south of Charters Towers and 134 km south-west of Townsville. The gold deposit was discovered on the northern end of the Drummond Basin
Mar 15, 2021
-
Carrapateena project to date – Geotechnical risks and management
By G Balog, T Ormerod, D Cox
This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana
Mar 15, 2021
-
Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)
By D Bruce, D Cox
The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock
Mar 15, 2021
-
The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave
By A Coelho, D Bruce, H Grosser, C Parken, M Xia
Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank
Mar 15, 2021
-
Developing a best practice framework for inrush risk management
By L Manca, P B. Hills, D Tyler, N Pollington
This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in
Mar 15, 2021
-
Raisebore drill string recovery case study
By M Andrew, D McTiffen, M Adams
A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th
Mar 15, 2021
-
Unlocking value in drill and blast at Olympic Dam – Lime 390 case study
By P Vaikkattil, K Li, J Bullock
Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout
Mar 15, 2021
-
On the flipside: why cost cutting is out; revenue maximization is in and value is always king
By H Allday
The mining industry’s attention has shifted over the last decade with the recovery from the downturn resulting in greater development of innovation and new work methods in a bid to remain competitive
Mar 15, 2021
-
A case study: how being ‘aware of now’ is making work safer at Telfer underground
By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle
Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper
Mar 15, 2021
-
Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine
By J Say, M Hawtin, L Carlon, P Cann
Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an
Mar 15, 2021
-
Collaborative development of mine ready electric vehicle
By H Guthrie, J Hodder, J Bain, S Durkin
Australian mines have traditionally relied on diesel powered vehicles to fulfil their light vehicle needs. There are many reasons for the resources industry to review its use of diesel-powered vehicle
Mar 15, 2021
-
Implementation of a management operating system at the Telfer Underground Gold Mine
By M Franklin, C Puglisi, S Fitch
Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and
Mar 15, 2021
-
Development and permitting of an underground mine at Cowal Gold Operations
By J Northfield, L Neesham
The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri
Mar 15, 2021
-
The Nova Operation: mining, technology and a look into the EV future
By P Ring, B Cooper, C Carr, G Laing
The Nova Ni-Cu-Co Operation, located in the Fraser Range of Western Australia, commenced commercial production in July 2017 only five years after discovery. Owned by Independence Group NL (IGO), the o
Mar 15, 2021