  • AUSIMM
    Increased drilling accuracy leads to significant improvement in ore recovery and dilution

    By R Stimpson, B Johnson, B Hesse

    During a period of twelve months between FY18-19, a series of trials were conducted to compare production drilling accuracy using two different methodologies, and the subsequent impact this had on sto

    Mar 15, 2021

  • AUSIMM
    Sublevel caving a narrow vein mine – Pajingo’s case study

    By J F. Carswell, G Cheshire

    The Pajingo gold operation in Queensland is approximately 55 km south of Charters Towers and 134 km south-west of Townsville. The gold deposit was discovered on the northern end of the Drummond Basin

    Mar 15, 2021

  • AUSIMM
    Carrapateena project to date – Geotechnical risks and management

    By G Balog, T Ormerod, D Cox

    This paper discusses the methods utilised by the technical team to identify and quantify the SLC risk factors, the modifications to mine design and scheduling, and the changes to the planned risk mana

    Mar 15, 2021

  • AUSIMM
    Problem roadways in an underground decline solved through the application of Roller Compacted Concrete (RCC)

    By D Bruce, D Cox

    The main access decline at Carrapateena mine was excavated through two different underground aquifers. In these areas of decline, pressurised water finds the path of least resistance through the rock

    Mar 15, 2021

  • AUSIMM
    The Application of a Bespoke Ventilation on Demand (VoD) System at Carrapateena Sublevel Cave

    By A Coelho, D Bruce, H Grosser, C Parken, M Xia

    Carrapateena is a new underground sublevel cave mine and was officially opened in 2020. It has a mine life of 20 years. Development began in 2016, and with the rare opportunity to start a with a blank

    Mar 15, 2021

  • AUSIMM
    Developing a best practice framework for inrush risk management

    By L Manca, P B. Hills, D Tyler, N Pollington

    This paper describes a collaborative project undertaken by Newcrest Mining Limited (Newcrest) and pitt&sherry to identify, develop and then implement global best practices to manage the exposure to in

    Mar 15, 2021

  • AUSIMM
    Raisebore drill string recovery case study

    By M Andrew, D McTiffen, M Adams

    A major Ventilation Upgrade Project commenced at the Fosterville Gold Mine (FGM) in 2017 to service the ongoing ventilation requirements of the underground mining operation. The project consists of th

    Mar 15, 2021

  • AUSIMM
    Unlocking value in drill and blast at Olympic Dam – Lime 390 case study

    By P Vaikkattil, K Li, J Bullock

    Unlocking maximum value is essential when designing a stope and the associated drill and blast packets. This is becoming increasingly important at Olympic Dam as the operation continues to expand sout

    Mar 15, 2021

  • AUSIMM
    On the flipside: why cost cutting is out; revenue maximization is in and value is always king

    By H Allday

    The mining industry’s attention has shifted over the last decade with the recovery from the downturn resulting in greater development of innovation and new work methods in a bid to remain competitive

    Mar 15, 2021

  • AUSIMM
    A case study: how being ‘aware of now’ is making work safer at Telfer underground

    By S B. Fitch, S A. Wilson, A J. R Barr, P R. Searle

    Improving the safety culture and performance of any operation is a fundamental goal of every mine operator. Methods of implementing, or changing a culture have developed from the early methods of oper

    Mar 15, 2021

  • AUSIMM
    Reduced Development through improved Rise and Widening Firings using Orica WebGen™ at Ernest Henry Mine

    By J Say, M Hawtin, L Carlon, P Cann

    Historically, production from sublevels of the Ernest Henry Mine (EHM) started from blind uphole rises at the end of slot drives. Where previous investigations considered removing these slot drives an

    Mar 15, 2021

  • AUSIMM
    Collaborative development of mine ready electric vehicle

    By H Guthrie, J Hodder, J Bain, S Durkin

    Australian mines have traditionally relied on diesel powered vehicles to fulfil their light vehicle needs. There are many reasons for the resources industry to review its use of diesel-powered vehicle

    Mar 15, 2021

  • AUSIMM
    Implementation of a management operating system at the Telfer Underground Gold Mine

    By M Franklin, C Puglisi, S Fitch

    Implementation of a well planned and executed Management Operating System (MOS) can result in widespread improvements to operational performance but its success relies heavily on the investment by and

    Mar 15, 2021

  • AUSIMM
    Development and permitting of an underground mine at Cowal Gold Operations

    By J Northfield, L Neesham

    The GRE46 Underground Project lies beneath the environmentally unique and culturally endowed shore of Lake Cowal. The ore body is open both along strike and at depth and is currently defined to a stri

    Mar 15, 2021

  • AUSIMM
    The Nova Operation: mining, technology and a look into the EV future

    By P Ring, B Cooper, C Carr, G Laing

    The Nova Ni-Cu-Co Operation, located in the Fraser Range of Western Australia, commenced commercial production in July 2017 only five years after discovery. Owned by Independence Group NL (IGO), the o

    Mar 15, 2021

  • AUSIMM
    Open stope design; beyond the Stability Graph

    By B McFadyen, Y Potvin, K Woodward

    The Australian Centre for Geomechanics (ACG) held two workshops in 2019—one in Australia and one in Canada—to discuss processes and methods currently used in the mining industry for stope design and r

    Mar 15, 2021

  • SME
    Attenuation of Mechanical Vibration During Transmission to Human Body Through Mining Vehicle Seats - Mining, Metallurgy & Exploration (2021)

    By AMIT SHARMA, BIBHUTI BHUSAN MANDAL

    Operators of mining vehicles are exposed to high levels of whole-body vibration (WBV) and are therefore at risk of developing vibration-related health disorders. For implementing an effective control

    Mar 12, 2021

  • SME
    A Hydrometallurgical Approach to Produce Nano-ZnO from Electrical Arc Furnace Dusts - Mining, Metallurgy & Exploration (2021)

    By Ali Behrad Vakylabad, Esmaeel Darezereshki, Babak Koohestani

    As a by-product of the steelmaking industry rich in iron and zinc, electric arc furnace dust (EAFD) landfill disposal is restricted in many countries due to the metal lixiviation risks. Several approa

    Mar 10, 2021

  • SME
    Sustainable Utilization of GCP Sludge as a Reductant in the Reduction Roasting of Low-Grade Manganese Ore to Recover Mn and Fe Values - Mining, Metallurgy & Exploration (2021)

    By Adeyemi Adesina, Subhabrata Mishra, Syed Mohammed Mustakim, Malaya Kumar Jena, Shaswat Kumar Das

    Utilization of low-grade manganese ore adopting the carbothermic reduction roasting process is a proven method to produce high-grade manganese ore. To minimize industrial waste and protect the environ

    Mar 5, 2021

  • SME
    Selection of Blasting Design Parameters Affecting Peak Particle Velocity—a Case Study - Mining, Metallurgy & Exploration (2021)

    By Piyush Rai, Suresh Kumar Sharma, Punit Paurush

    The present study has been conducted in surface limestone mine to select the controllable blasting design parameters affecting the peak particle velocity (PPV) for assessment of ground vibration. The

    Mar 1, 2021