    Comparative Analysis of Open Pit Gold Mine Project NPV’s Under Price Uncertainty Using Real Options and Dynamic Mine Plans

    By M. Visnjic

    Open Pit Mine Production scheduling under commodity price uncertainty suffers from an exponentially increasing problem size as simulations and real options flexibility are used to generate and evaluat

    Jan 1, 2019

  • SME
    Three Pillars of Mineral Valuation

    By F. L. Pirkle, W. C. Bagby

    The International Mineral Valuation (IMVAL) Committee, founded in 2012, develops strategies for conducting mineral valuations. These strategies have been developed into a mineral asset valuation templ

    Jan 1, 2019

  • SME
    When The Bill Comes Due: Understanding and Managing Tailings Influenced Groundwater at the Butte Superfund Site. A Historical Perspective

    By R. D. Williams

    INTRODUCTION In a very real sense, Butte, Montana is where the copper came from that won two world wars. The price for that unrestricted mining and smelting of copper came due in 1983 when Butte was

    Jan 1, 2019

  • CIM
    Reagent Optimization for Improved Selectivity of Floating Copper Minerals against Pyrite

    By J. Ji, A. Shi, B. Grcic

    Floating copper minerals selectively against iron minerals such as pyrite has been challenging for most copper and copper/gold deposits, and many operations continuously strive to maximise copper reco

    Jan 1, 2019

  • CIM
    Desalinated Water Infrastructure Optimization under Competing Trade-Offs in the Antofagasta Mining Region of Chile

    By C. Campero, C. Nicolau, L. Pagliero

    The Chilean Congress has recently promoted desalination as a solution to meet the mining industry’s growing water demand. However, this rapid expansion of desalination infrastructure comes with trade-

    Jan 1, 2019

  • CIM
    Parameter Study on Arsenic Oxidation from Concentrated Acidic As(III) Solutions with Activated Carbon

    By A. Ghahreman

    Activated carbon is proven to be able to catalyze arsenic oxidation in aqueous solution under acidic conditions. A commercially available granular coconut shell based activated carbon (AC) has been ev

    Jan 1, 2019

  • SME
    Mining Asset Development for Virtual Reality

    By J. Navoyski, B. Macdonald, W. J. Helfrich, J. L. Bellanca, B. Demich

    DISCLAIMER The findings and conclusions in this paper are those of the authors and do not necessarily represent the official position of the National Institute for Occupational Safety and Health, Cen

    Jan 1, 2019

  • CIM
    Lucky Friday’s No. 4 Shaft - Ten Years from Concept to Completion

    By David Berberick

    "Hecla Limited’s No. 4 Shaft at the Lucky Friday Mine is the largest capital expenditure in the corporation’s 128-year history and is considered the deepest shaft in the United States. This paper will

    Jan 1, 2019

  • SME
    The Development of a Multiple Level Underground Limestone Mine from Geology through Mine Planning

    By Christopher Newman, Robert Dupuy, David Newman

    "The development of a multiple level underground mine is a complex task in which geology, engineering, ground control, and unit operations are integrated into a single mine design. The components are

    Jan 1, 2019

  • SME
    Practical Options for Solving the Dolomite Problem with Florida Phosphate Resources

    By C. Feng, W. Song, B. Moudgil, P. Zhang, W. Xiao

    Separation of dolomite from phosphate is the most challenging problem in phosphate mineral processing. Over 50% of the future phosphate reserves in Florida contains too much dolomite to process using

    Jan 1, 2019

  • CIM
    Start Up, Commissioning and Optimization of the Gravity Circuit at Atlantic Gold’s Moose River Project in Eastern Canada

    By C. Hudson, D. Tremblay, A. Frey

    "A discussion of the design, challenges and successes associated with the commissioning of the gravity recovery circuit at Canada’s newest open pit gold mine - Atlantic Gold’s Moose River Consolidated

    Jan 1, 2019

  • CIM
    Maximising Hoisting Capacity Whilst Minimising Capital Investment

    By A. A. Wessels, D. P. Allison

    "Mine hoists are built to handle a certain nameplate capacity; they are specified and designed according to the required duty. However, as production capacity increases in other parts of an operation,

    Jan 1, 2019

  • CIM
    Anode Furnace Off-Gas NOX Emissions Improvements at Rio Tinto Kennecott

    By Arsenio Enriquez, Adrian Deneys, Ryan Walton, Jenny Esker

    NOx emissions at the Rio-Tinto Kennecott Copper (RTKC) smelter, near Salt Lake City, Utah, are regulated to a compliance emission limit at the Main Stack of 15.9 kg/hr on an annual rolling average. Th

    Jan 1, 2019

  • SME
    Long-Term Subaqueous Solute Generation in Pit Lakes: Implications for Modeling and Closure

    By C. P. Newman, T. Gray, G. Beale, T. Cluff

    Predictive geochemical and limnologic modeling of pit lakes is an important aspect of modern permitting. One of the key assumptions of many predictive pit-lake models is that highwalls and pit backfil

    Jan 1, 2019

  • CIM
    Using Piston–Die Press Tests for Preliminary Sizing and Selection of a High-Pressure Grinding Roll

    By P. Rosario

    "Industry practice for high-pressure grinding roll (HPGR) assessment and sizing relies on tests using pilot-scale machines with 0.7–1.0 m roll diameters. Typically 1–10 t of sample are required, depen

    Jan 1, 2019

  • SME
    Exploration of Petrographic, Elemental, and Material Properties of Dynamic Failure-Prone Coals

    By Lawson. Heather

    "The purpose of this study is to explore how the geochemical and petrographic components of coal may impact its physical properties, as well as how these components correlate with a history of reporta

    Jan 1, 2019

  • CIM
    Tire-Rim Interactions and Predictions at High G Loading

    By T. G. Joseph, M. Bolster, M. Curley

    "High tirerim loading on haul trucks operating on rough ground frequently manifests as mechanical separations and rim base cracking caused by cyclic fatigue. This paper provides an understanding of th

    Jan 1, 2019

  • CIM
    Towards a Comprehensive Model of the Flash Smelting Furnace

    By P. Taskinen, A. Jokilaakso

    The Flash Smelting Process for copper and nickel production has been one of the most successful new metallurgical process developments in the 20th century. The experimental data from laboratory scale

    Jan 1, 2019

  • SME
    Quantifying and Insuring Against Mine Risks from the Changing Climate

    By S. Kemball-Cook, D. Heinze, A. Kornberg, M. Harmon

    Climate change presents risks to mine infrastructure, operations and long-term obligations to protect environmental conditions. Management strategies and design of infrastructure and containment syste

    Jan 1, 2019

  • SME
    Improved Drilling Accuracy Results In Reduced Ore Dilution at Evolution, Cracow (a2d917f6-13bc-4cac-8758-bced53c996a6)

    During a period of six months in FY2018, a series of trials were conducted to compare drilling accuracy using two different methodologies and the subsequent impact this had on ore dilution. Testing wa

    Jan 1, 2019