Dynamic and Static Load Testing: A Cost Savings Approach
By Thomas Hyatt, Brandon Phetteplace, Camilo Alvarez
A test pile program was undertaken at a project site in Ain Sukhna, Egypt for an import/export oil jetty. Two 1219 mm diameter open ended steel pipe piles were evaluated at two separate test locations
Jan 1, 2019
-
Full Waveform Inversion of Cross-Hole Stress Waves for Structural Integrity Testing of Drilled Shafts
By Joseph T. Coe, Alireza Kordjazi, Michael Afanasiev
Cross-hole sonic logging (CSL) is a common quality assurance measure for the evaluation of the structural integrity of drilled shafts. The results of CSL can be supplemented by a set of tomographic im
Jan 1, 2019
-
Helical Pile-to-Pile Cap Connections Subjected To Uplift Forces: Improving Future Practice
By Serhan Guner, Sundar Chiluwal
Although significant research has been conducted on helical piles, there is a lack of research and official design provisions on the helical pile-to-pile cap connections. These connections may govern
Jan 1, 2019
-
Hudson’s Revitalization: The Use of Robotics in the Work Place
By Dave P. DeClerck
Hardman Construction was faced with the challenge of completing a large earth retention project on a constricted downtown Detroit site, while maintaining a safe and productive worksite. To do so, new
Jan 1, 2019
-
Structural Evaluation of Thermal Integrity Profile Results of Transmission Foundations
By Ryan Weaver, Travis Coleman
The drilled shafts that support transmission lines and substations have been increasingly subject to testing to assess the integrity of placed concrete. Cross-hole Sonic Logging (CSL) has been used, b
Jan 1, 2019
-
The Final Piece of the Puzzle: Re-Design Of Grouted Closures for a Dam Cutoff Wall
By Daniel P. Stare, Lucian P. Spiteri, Christopher M. Hallahan, James C. Myers
Buckeye Lake Dam was substantially remediated between 2015 and 2018 as a result of unacceptable dam safety performance. A permanent seepage cutoff, consisting primarily of a soil mixed cutoff wall (SM
Jan 1, 2019
-
Urban High Capacity Deep Foundation Solutions in Sites with Complex History and Geology
By Karen C. Armfield, Gisele R. Passalacqua, Joanna Smith
New York City is an urban environment with a history spanning over 200 years. The coastline of New York has changed over the years. In the East River, old bulkhead and remnant of relieving platforms t
Jan 1, 2019
-
Specialty Geo-Engineering in a Caisson Town
By William H. Walton, Joel Dellaria, Jeffrey R. Hill
The City of Chicago has a world-renowned skyline and is known for its provocative architecture. The subsurface conditions in the city have allowed for construction of these significant structures. The
Jan 1, 2019
-
The Use of Rigid Inclusions to Support Large Spans
By Michael Shedlosky, Sonia Sorabella Swift, Nina Carney, David Tarasovic
Rigid inclusions were used to support roadway fills and mechanically stabilized earth (MSE) walls for the South Capitol Street Corridor project. The first phase of this two-phase, nearly $1 billion pr
Jan 1, 2019
-
The Use of Vibratory Driving of Foundation Piles for Offshore Applications - State of the Practice
By Nicolas Moscoso, Gerald Verbeek, Marcel Bielefeld, Rob van Dorp
Upon recently, most offshore foundations were based on a number of driven piles that were installed with an impact hammer. With the increase in offshore windfarms two major developments have occurred:
Jan 1, 2019
-
Hemispherical Charge Comparison to Kingery Bulmash
By David N/A Doucet, Colter N/A Angell, William N/A Joa, Kyle N/A Wagner, Catherine N/A Johnson, Marty N/A Langenderfer
The Kingery-Bulmash (K-B) equations are a widely accepted means of predicting air-blast parameters from surface explosive detonations. The parameters predicted from these calculations include incident
Jan 1, 2019
-
Circulation of Sodium Sulfate Solution Produced During NiMH Battery Waste Processing
By A. Porvali, V. Agarwal, M. Lundström
Hydrometallurgical recovery of rare earth elements (REE) from NiMH battery waste can be performed using sulfuric acid leaching followed by selective precipitation as double salt (REENa(SO4)2•H2O) by a
Jan 1, 2019
-
Controlling Crud Formation in Solvent Extraction with Acorga® Cr60 PLS Additive
By T. Bednarski, T. McCallum, L. Moya, L. Nsenga, B. Mbao
The accumulation of solids in solvent extraction (SX) circuits can cause problems with the physical and economic performance of the operation. These solids are responsible for the formation of crud, a
Jan 1, 2019
-
Twenty Five Years of Sonic Injection Plant Trials and Implementation — Let’s Take Stock
By Joël P. T. Kapusta
Back in 1995, Air Liquide and Union Minière presented a joint paper at the Copper 95 – Cobre 95 Conference in Santiago, Chile, describing the first full scale plant trials of shrouded sonic injection
Jan 1, 2019
-
Accuracy of Low-Strain Pile Integrity Test Results
By Mahesh Hingorani
Integrity issues for bored cast-in-situ piles have raised the need for the use of non-destructive tests to verify pile integrity and detect possible anomalies in installed pile sections that could adv
Jan 1, 2019
-
Cost Effective Excavation Support in Seattle
By Richard D. Luark, Fernanda S. Madrona
Deep foundation construction in highly developed urban settings pose unique challenges of working with deep excavations in a relatively confined area while preserving the integrity of nearby structure
Jan 1, 2019
-
Deep Excavation Support: Innovative Shoring Design in an Urban Environment
By Richard D. Luark, Fernanda S. Madrona
Designing temporary retaining systems that allow for deeper excavation amid the existing urban infrastructure has become a challenge. A 60-foot-deep excavation in downtown Seattle was required to cons
Jan 1, 2019
-
Deep Foundation Advancements in Fargo
By Ezra Ballinger, Matthew R. Glisson
Located in downtown Fargo, North Dakota, the Block 9 Redevelopment project site contains highly- compressible soils in the upper 100 feet with groundwater about 10 to 15 feet below the existing ground
Jan 1, 2019
-
Deep Foundations for Top-Down Construction of High-Rise Project
By Martin B. Hudson, Kenneth S. Hudson, Gwendolyn Arreguin
A twin high-rise project site in Century City posed several foundation engineering challenges for the design team. One portion of the twin high-rise project site was required to utilize top-down const
Jan 1, 2019
-
Design and Construction Benefits of Performing a Bi-Directional Test on a Drilled Shaft in Sand, Gravel, and Cobble Deposits
By Marco Fellin, Van E. Komurka
Significant cost and construction benefits were obtained from performing a bi-directional static load test prior to construction on the Russell Street Bridge Replacement project in Missoula, Montana.
Jan 1, 2019