Search Documents

Sort by

  • DFI
    Design and Construction of Permanent Sheet and Pipe Pile Basement Walls with the Press-in Piling Method

    By Takefumi Takuma, Tsunenobu Nozaki, Masashi Nagano

    Using sheet piles and pipe piles for permanent earth retaining is one of the most economical methods for constructing basement walls since they can also work as temporary shoring during construction.

    Jan 1, 2019

  • DFI
    Diggs Does Deep Foundations

    By Robert Bachus, Nikolaos Machairasm, Allen Cadden

    Data Interchange for Geotechnical and Geoenvironmental Specialists (DIGGS) is a data transfer standard that is gaining widespread acceptance in the geotechnical and geoenvironmental communities. Origi

    Jan 1, 2019

  • DFI
    Geo-Foundations Project Information Management Systems on a Budget

    By Jamey B. Rosen

    As Project Information Management Systems (PIMS) technologies develop, the range of projects to which one can apply these technologies grows while the cost to apply them shrinks. In recent years, tech

    Jan 1, 2019

  • DFI
    Ground Freezing: The Use of Liquid Nitrogen Systems Converted To Brine

    By Joseph A. Sopko

    There has been a trend in recent years in performing the initial formation freezing using liquid nitrogen (LIN) and then converting the system to circulating refrigerated brine. While proponents of th

    Jan 1, 2019

  • DFI
    Efficient Deep Foundations, Earth Retention Systems and Ground Improvement – New School Techniques for Columbia Manhattanville’s Subsurface Challenges

    By Justin Lukens, Di Stasim Jeffrey, Frank Di Salvo

    Columbia University’s Manhattanville Campus expansion includes the construction of two new business school buildings. The new buildings require development of an entire city block bound by 12th Avenue

    Jan 1, 2019

  • DFI
    Efficient Torque-Installed Pile Use in Southern California

    By Jason Buenker, Molly Winston

    Torque-installed piles are gaining popularity in Southern California as the go-to deep foundation element for small- to medium-capacity loads in urban environments. The torque-installed pile is a disp

    Jan 1, 2019

  • DFI
    Emergency Jacking Tunnel in Compressible Soil

    By Tai Luu, Michael McNicholas, James C. McIntyre

    The Jersey City Municipal Utilities Authority (JCMUA), discovered that an existing sewer pipe had collapsed under the New Jersey Transit Conrail Railroad between Pine Street and Ash Street in Jersey C

    Jan 1, 2019

  • DFI
    Today’s Connectivity: Using Historical Data to Anticipate Future Risk

    By Michael Frawley, Deana Ruud, Jessica Turner

    Technology is allowing for new ways to mitigate risk associated with subsurface exploration and unanticipated subsurface conditions during construction. Unanticipated subsurface conditions have the po

    Jan 1, 2019

  • CIM
    Origins of Electrorerefining: Birth of the Technology and the World's First Commercial Electrorefinery

    By A. E. Wraith, J. Protheroe Jones, P. J. Mackey

    The world’s first copper electrorefinery started production in 1869 at Burry Port in South Wales. Built within the Pembrey Copper Works which had commenced smelting operations in 1849, the new refiner

    Jan 1, 2019

  • SME
    Simultaneous Stochastic Optimization of Production Scheduling at Twin Creeks Mining Complex, Nevada

    "Twin Creeks is a gold mining complex that is part of Newmont’s Nevada operations. The mining complex is composed of two openpits, Mega and Vista, external ore sources and a set of existing stockpiles

    Dec 1, 2018

  • SME
    Elko Roundtable 2018; Water in Mining

    By Rick Frechette, Greg Nelson

    "The 2018 Elko Roundtable was held at the Red Lion in Elko, NV on March 15, 2018. The gracious host was once again Knight Piésold. Attendance was robust with representatives from more than 14 mining p

    Dec 1, 2018

  • SME
    Using Slope Design Fundamentals and Technology for Slope Steeping on a Final Wall at the Goldstrike Openpit

    By Jeff Mattern

    "Slope performance monitoring, dependable operational practices and ongoing collection of geologic data in openpit slopes all provide valuable information for quantifying potential steepening of subse

    Dec 1, 2018

  • SAIMM
    Some Physical and Chemical Characteristics of Calcium Lignosulphonate-Bound Coal Fines

    By H. W. J. P. Neomagus, J. R. Bunt, T. S. Mthombo, C. A. Strydom

    "Low-cost calcium lignosulphonate (CL), which is a byproduct of the wood pulping industry, was investigated as a potential binder during laboratoryscale pelletization of inertinite-rich high-ash coal

    Dec 1, 2018

  • SME
    High in Situ Stress and its Effects on Tunnel Design: An Update Based on Recent Project Experience from Westconnex Tunnels

    By D. Tepavac, S. Simmonds

    "The high virgin horizontal in situ stress field in the Sydney Basin and its impact on civil engineering projects is a well-known and accepted phenomenon found in significant literature (e.g., Pells,

    Dec 1, 2018

  • SME
    Cross Passage Freezing from the Ground Surface

    By Brenton Cook, Nate Long, Larry Applegate, Aaron K. McCain

    "The Northgate Link Extension project is the third phase of the Sound Transit master plan to extend light rail throughout the greater Seattle metropolitan area. When completed, the Northgate Link Exte

    Dec 1, 2018

  • SME
    NAT 2018 Full Proceedings - NAT2018

    By Matthew Preedy, Brett Campbell, Jim Rush, Alan Howard, Derek Penrice

    All Rights Reserved. Printed in the United States of America. Information contained in this work has been obtained by SME, Inc. from sources believed to be reliable. However, neither SME nor its autho

    Dec 1, 2018

  • AUSIMM
    Analysis of premature failure of rock bolts and cable bolts failed in underground coal mines

    By P Craig, A Crosky, H Ramandi, S Saydam, H Chen

    Frequency of reports on premature failure of rock bolts and cable bolts have increased in past two decades. Such a failure threatens both the safety of underground mine workers and the economic viabil

    Nov 30, 2018

  • AUSIMM
    The practicalities of effective stress measurement in rock

    By I Gray

    This paper examines the practical limitations that affect the measurement of stress in rock. As most rock stress measurement is conducted through the invasive process of drilling a hole in a rock mass

    Nov 30, 2018

  • AUSIMM
    Elevating geotechnical considerations in the Australian underground coal industry and mine planning process

    By T Stambolie

    Mine planning processes are continuously evolving, increasing in complexity, and are required to be developed in shorter timeframes, often missing important steps in the process. Underground coal mine

    Nov 30, 2018

  • AUSIMM
    The evolution of seismicity and ground control measures at Ernest Henry Mine

    By H Esterhuizen

    The Ernest Henry Mine (EHM) in Queensland, Australia is a Sub-level Caving operation that started production below the previously mined open pit at a depth of 535m. Current Production mining has progr

    Nov 30, 2018