Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Productivity improvement through collaborative shift planning and tracking
By E Deucker, A White
Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their
Oct 16, 2017
-
The use of 3D laser scanning for deformation monitoring in underground mines
By D Beck, E Jones
The measurement and management of deformation in underground excavations is a key responsibility of geotechnical and mining engineers. A critical aspect of these roles is to ensure there is sufficient
Oct 16, 2017
-
Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine
By C A. Brannon, C A. Dipas, H A. Vega, D Villa
The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full
Oct 16, 2017
-
Development and implementation of a long tendon bolting system utilising resin grouting technology
By T Sprague, D Pateman
"The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro
Oct 16, 2017
-
Learnings from review of drawpoint management across New South Wales mines
By X Hill
Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ
Oct 16, 2017
-
JumboGuard – automatic boom isolation system
By J Dwyer, M Hill
Downer’s mining division has made an operational and financial commitment to developing engineered solutions that mitigate the risks associated with operator proximity to uncontrolled development dril
Oct 16, 2017
-
The CSA ventilation upgrade – geotechnical challenges and learnings
By T M. Brettell, D Sidea
The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre
Oct 16, 2017
-
Innovation in mining – a contractor’s role
By D Kilkenny
Underground contractors in the mining industry must be prepared to take a position at the forefront of innovation of equipment and work methods in order to maintain a competitive advantage over in-hou
Oct 16, 2017
-
Effectively linking mining geology with waste management – a case study from western Tasmania
By A Parbhakar-Fox, B G. Lottermoser
Management of solid mine wastes, particularly waste rock, requires careful planning to reduce the likelihood of sulfide oxidation, and generation of acid rock drainage (ARD). Waste management strategi
Sep 20, 2017
-
The necessary role of the geologist in geotechnical data gathering
By P B. Hills
Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t
Sep 20, 2017
-
Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones
By J G. McLellan, B Miller
Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio
Sep 20, 2017
-
Sampling strategy by statistical analyses of LIBS data in the context of a portable gold analyser
By M Castello, P Bouchard, M Sabsabi, A Blouin, B Nguegang Kamwa, M Constantin, K Fytas, M Laflamme, K Rifai, F Vidal
Canada’s Quebec province operates 26 metal mines, 19 of which are producing gold and generating over C$1.8 billion (US$1.3 billion) annually. In all those mines, numerous samples of rock are collected
Sep 20, 2017
-
Blast movement monitors or polypipe? A study into cost-effective blast movement monitoring at White Foil gold mine, Western Australia
By M E. Watson
Minimising dilution and ore loss is an important part of ensuring profitability of a gold mining operation. White Foil open pit gold deposit is a low-grade deposit and therefore managing ore quality i
Sep 20, 2017
-
Public reporting – new standards or no standards?
By J Coombes, R Sterk
The efficiency of the Australian and New Zealand stock exchanges relies on a fully informed market: shareholders and investors are fully and transparently informed of all material information relating
Sep 20, 2017
-
Sulfur – the new geometallurgical grade in gold-sulfide deposits
By S Juras
To our geologists at Eldorado Gold Corporation, the release of the gold assays on a new ore zone causes a flurry of excitement. But to our metallurgists, that news is often greeted with the question ‘
Sep 20, 2017
-
Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing
By M A. Noppé
Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine
Sep 20, 2017
-
Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiation
By P J. Handley
"Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock
Sep 20, 2017
-
Charles Dickens on the (potentially) changing role of globalisation and sustainability in the long-term future of mining and exploration
By J P. Sykes, T C. McCuaig, M Jessell, A Trench
The election of Donald Trump and the Brexit referendum herald a shift towards a tighter definition of economic value, at the expense of the broader value concept of sustainable development; as well as
Sep 20, 2017
-
An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine
By M Kent, D Elder, J Woodward, R Edwards, B Catto
At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine
Sep 20, 2017
-
Steve and Fred would have been mates – a comminution design evolution story
By D David
Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i
Sep 11, 2017