Search Documents

Sort by

  • AUSIMM
    Productivity improvement through collaborative shift planning and tracking

    By E Deucker, A White

    Gold Fields Australia (Gold Fields) has identified that improving productivity through more detailed shift planning and operational control of mining activities is a key driver to the success of their

    Oct 16, 2017

  • AUSIMM
    The use of 3D laser scanning for deformation monitoring in underground mines

    By D Beck, E Jones

    The measurement and management of deformation in underground excavations is a key responsibility of geotechnical and mining engineers. A critical aspect of these roles is to ensure there is sufficient

    Oct 16, 2017

  • AUSIMM
    Integrated drawbell and undercut scheduling using a computational tool at the Grasberg block cave mine

    By C A. Brannon, C A. Dipas, H A. Vega, D Villa

    The development and construction of the Grasberg block cave mine (GBC) is in progress, currently targeting initiation of caving in late 2018. Current production planning anticipates ramping up to full

    Oct 16, 2017

  • AUSIMM
    Development and implementation of a long tendon bolting system utilising resin grouting technology

    By T Sprague, D Pateman

    "The Gosowong Gold Project is owned and operated by PT Nusa Halmahera Minerals (PT NHM), an Indonesian company 75 per cent owned by Newcrest. It is located on Halmahera Island, in the North Maluku Pro

    Oct 16, 2017

  • AUSIMM
    Learnings from review of drawpoint management across New South Wales mines

    By X Hill

    Throughout the 2016/2017 financial year, the NSW Resources Regulator conducted an assessment of each underground metalliferous operation across the state to assess how each operation managed the princ

    Oct 16, 2017

  • AUSIMM
    JumboGuard – automatic boom isolation system

    By J Dwyer, M Hill

    Downer’s mining division has made an operational and financial commitment to developing engineered solutions that mitigate the risks associated with operator proximity to uncontrolled development dril

    Oct 16, 2017

  • AUSIMM
    The CSA ventilation upgrade – geotechnical challenges and learnings

    By T M. Brettell, D Sidea

    The CSA Mine is located in Cobar, New South Wales and is operated by Glencore. Large scale underground production started from 1965, with zinc, lead, silver and copper extracted in the past. The curre

    Oct 16, 2017

  • AUSIMM
    Innovation in mining – a contractor’s role

    By D Kilkenny

    Underground contractors in the mining industry must be prepared to take a position at the forefront of innovation of equipment and work methods in order to maintain a competitive advantage over in-hou

    Oct 16, 2017

  • AUSIMM
    Effectively linking mining geology with waste management – a case study from western Tasmania

    By A Parbhakar-Fox, B G. Lottermoser

    Management of solid mine wastes, particularly waste rock, requires careful planning to reduce the likelihood of sulfide oxidation, and generation of acid rock drainage (ARD). Waste management strategi

    Sep 20, 2017

  • AUSIMM
    The necessary role of the geologist in geotechnical data gathering

    By P B. Hills

    Almost a quarter of a century since Bridges (1993) documented techniques for the assessment of ground conditions in a seminal paper in the Proceedings Second International Mining Geology Conference, t

    Sep 20, 2017

  • AUSIMM
    Geomechanical modelling of the Ernest Henry iron oxide copper gold deposit – identifying fluid pathways to predict potential mineralised zones

    By J G. McLellan, B Miller

    Copper and Gold mineralisation at the Ernest Henry deposit is bound by two controlling shears along the hanging wall and footwall margins. The shear zone geometries have been influenced by a large dio

    Sep 20, 2017

  • AUSIMM
    Sampling strategy by statistical analyses of LIBS data in the context of a portable gold analyser

    By M Castello, P Bouchard, M Sabsabi, A Blouin, B Nguegang Kamwa, M Constantin, K Fytas, M Laflamme, K Rifai, F Vidal

    Canada’s Quebec province operates 26 metal mines, 19 of which are producing gold and generating over C$1.8 billion (US$1.3 billion) annually. In all those mines, numerous samples of rock are collected

    Sep 20, 2017

  • AUSIMM
    Blast movement monitors or polypipe? A study into cost-effective blast movement monitoring at White Foil gold mine, Western Australia

    By M E. Watson

    Minimising dilution and ore loss is an important part of ensuring profitability of a gold mining operation. White Foil open pit gold deposit is a low-grade deposit and therefore managing ore quality i

    Sep 20, 2017

  • AUSIMM
    Public reporting – new standards or no standards?

    By J Coombes, R Sterk

    The efficiency of the Australian and New Zealand stock exchanges relies on a fully informed market: shareholders and investors are fully and transparently informed of all material information relating

    Sep 20, 2017

  • AUSIMM
    Sulfur – the new geometallurgical grade in gold-sulfide deposits

    By S Juras

    To our geologists at Eldorado Gold Corporation, the release of the gold assays on a new ore zone causes a flurry of excitement. But to our metallurgists, that news is often greeted with the question ‘

    Sep 20, 2017

  • AUSIMM
    Improved assurance for Mineral Resource and Ore Reserve estimates and reporting through peer review and auditing

    By M A. Noppé

    Mining is inherently a risk-based business and risk governance is an integral part of corporate assurance and business decision-making. Mineral Resources and Ore Reserves are the key assets for a mine

    Sep 20, 2017

  • AUSIMM
    Washability modelling and estimation techniques used to improve coal handling preparation plant beneficiation

    By P J. Handley

    "Predicting how coal seams will be beneficiated through the coal handling processing plant (CHPP) has long been challenging within BHP Coal. Various coal seams from different areas are mined and stock

    Sep 20, 2017

  • AUSIMM
    Charles Dickens on the (potentially) changing role of globalisation and sustainability in the long-term future of mining and exploration

    By J P. Sykes, T C. McCuaig, M Jessell, A Trench

    The election of Donald Trump and the Brexit referendum herald a shift towards a tighter definition of economic value, at the expense of the broader value concept of sustainable development; as well as

    Sep 20, 2017

  • AUSIMM
    An integrated approach to mine planning – building the integrated planning model at Tropicana gold mine

    By M Kent, D Elder, J Woodward, R Edwards, B Catto

    At Tropicana gold mine (TGM), mine planning is completed from ‘one source of truth’ known as the Integrated Planning Model (IPM). The IPM is a block model which forms a core component of the TGM Mine

    Sep 20, 2017

  • AUSIMM
    Steve and Fred would have been mates – a comminution design evolution story

    By D David

    Amongst those whose task it is to design tumbling mills and other comminution machines there is an almost religious divide between devotees of the Bond method and devotees of other methods developed i

    Sep 11, 2017