Search Documents

  • CIM
    Intégration des données minéralurgiques et géomécaniques pour la conception minière : le cas de la fosse J4 de la mine Troilus

    By J. Bélanger, B. Semlali, M. Grenon

    RÉSUMÉ La conception des fosses ainsi que l'évaluation des ressources géologiques et des réserves minières sont désormais réalisées entièrement à l'aide d'outils informatiques spécialisés. Cependant,

    Jan 1, 2010

  • NIOSH
    Bulletin 239 Iron Ore (Hematite) Mining Practice in the Birmingham District, Alabama

    By W. R. Crane

    Mining of the red iron ores of the Birmingham district, Alabama, has _gone on energetically for the past 50 years and has created a large iron and steel manufacturing center, the only important one in

    Jan 1, 1927

  • CIM
    Commissioning of a Brownfield CDS Plant: Victories and Pitfalls

    By N. Romani, R. Provost

    "Commissioning of a circulating dry scrubber plant was recently completed at an existing facility, in order to treat the sulphur dioxide off-gas emitted from rotary kilns. Proper planning of the diffe

    Jan 1, 2016

  • NIOSH
    RI 8247 Geology and Gas Content of Coalbeds in Vicinity of Bureau of Mines, Bruceton, Pa. (e39ac9bb-bfb7-4880-b40c-a1cecfdc121a)

    By C. H. Elder

    Two degasification test boreholes were drilled to depths of 1,238 and 1,212 feet on Bureau of Mines property at Bruceton, Pa., as part of the Bureau's long-range coal degasification program. The

    Jan 1, 1977

  • DFI
    Field Test Verification Of Ground Bearing Pressure Under Rig Tracks And Implications For Working Platform Design

    By Steffen Schweizer, Tadeusz Brzozowski, Alfred Koller, Michał Topolnicki, Jürgen Wäger, Grzegorz Sołtys

    A full scale test has been conducted to determine ground bearing pressure under rig tracks. The track loads were recorded in real time using Liebherr's Ground Pressure Visualisation system, and the ve

    May 1, 2022

  • ISEE
    Automation of Rock Fragmentation Analysis

    By Hairong Zeng, Matthew Baumann, Shahram Tafazoli, Edmond Chow

    Measurement of rock fragmentation has evolved from a completely subjective and manual process to a statistically objective and semi-automated process. However, ultimately, the vision is to achieve a s

    Jan 1, 2012

  • SAIMM
    The Influence of Selected Biomass Additions on the Co-Pyrolysis with an Inertinite-Rich Medium Rank C Grade South African Coal

    By T. Z. Sehume, J. R. Bunt, J. C. van Dyk, C. A. Strydom

    "SynopsisCo-pyrolysis of four biomass samples (hardwood chip, softwood chip, pinewood chip, and sugarcane bagasse) with an inertinite-rich medium rank C South African coal was investigated. Proximate

    Jan 1, 2015

  • DFI
    Grouting of an Artesian Zone in Advance of Powerhouse Excavation for the Red Rock Hydroelectric Project

    By Dewey W. Geary, Rachael V. Bisnett, R. Michael Bivens, Thomas G. Andrews

    "The powerhouse for the Red Rock Hydroelectric Project is being constructed at the toe of the existing U.S. Army Corps of Engineers’ Red Rock Dam immediately adjacent to the existing stilling basin re

    Jan 1, 2016

  • NIOSH
    IC 8235 A Review Of Well Stimulation And Techniques To Prevent Formation Damage In Oil And Gas Production (d5c287b0-d3c4-4c7d-8441-4d2890eb86ea)

    By J. L. Eakin

    The works and opinions of experts on well stimulation and related problems are summarized in this paper. The material is devoted to stimulative work in petroleum and natural-gas wells exclusive of the

    Jan 1, 1964

  • NIOSH
    IC 8235 A Review Of Well Stimulation And Techniques To Prevent Formation Damage In Oil And Gas Production

    By J. L. Eakin

    The works and opinions of experts on well stimulation and related problems are summarized in this paper. The material is devoted to stimulative work in petroleum and natural-gas wells exclusive of the

    Jan 1, 1964

  • AUSIMM
    Winning the Safety Battle

    By S Hanrahan, S McLaughlin

    A case study is presented that details the safety journey at a North American project involving two major contracts: a 1000 m shaft recovery and rehabilitation, and the development of a drainage galle

    Jun 22, 2016

  • ABM
    A Study On The Relation Of Retained Austenite To Mechanical Properties In Cold Rolled Transformation-induced Plasticity Steel*

    By Hongshuang Di, Tianyu Zhang, Huiqiang Huang

    A CMnSiAl transformation induced plasticity (TRIP) steel was used to study the effect of retained austenite on room-temperature mechanical properties. The steel plates with retained austenite were obt

    Oct 1, 2019

  • SME
    Machine Learning Prediction Of The Load Evolution In Three-point Bending Tests Of Marble

    By K. KAKLIS, O. SAUBI, Z. Agioutantis, R. JAMISOLA

    Machine learning in the form of artificial neural networks was applied to investigate whether specimen load evolution can be predicted as a function of acoustic emission (AE) signals in the case of th

    Nov 1, 2022

  • SME
    Experimental Evaluation Of A Mine Electrical Failure Prediction System

    By Jeffery L. Kohler

    The research and development of a pattern recognition system which can predict incipient failures and safety hazards in the mine power network is described. An examination of mine electrical safety ha

    Jan 1, 1977

  • NIOSH
    IC 8029 Sinking A Large-Diameter, Concrete-Lined Access Shaft: Harold D. Roberts Tunnel, Colorado ? Introduction

    By Bolmerm R. L.

    This information circular describes the application of modern methods and equipment in sinking a vertical, 916-foot-deep by 16-foot-diameter, concrete-lined access shaft for the Harold D. Roberts tunn

    Jan 1, 1961

  • AIME
    Two- And Three- Dimensional Pit Design Optimization Techniques

    By Leon Borgman, Michael P. Lipkewich

    Orebodies at or near the surface are generally amenable to open pit mining. The development of a mining program involves designing an ultimate pit and a production schedule. This pit maximizes total p

    Jan 1, 1969

  • DFI
    ACIP Pile Performance and Installation in the Northeastern United States

    By Jr NeSmith

    "Augered-cast-in-place (ACIP) pile installation technology has matured extensively since the first auger, pressure grouted pile was patented in 1959. The current technology allows for successful pile

    Jan 1, 2016

  • CIM
    The Importance of Accurate Rock Property and Virgin Rock Temperature Data in Ventilation and Cooling Planning Requirements

    By A. J. Russell

    "This paper investigates why it is critical for a mine to accurately determine thermal rock properties and virgin rock temperatures. Theoretical simulations of deep mining production zones have demons

    Jan 1, 2019

  • CIM
    Effect of Thermomechanical Processing on Microstructure and Mechanical Properties in an Al-Cu-Mg-Si Alloy

    By R. Holmestad, M. Gazizov, S. Wenner, R. Kaibyshev, J. K. Sunde

    "Mechanical properties and microstructure of an Al-4.7Cu-0.74Mg-0.51Si-0.48Mn-0.10Cr-0.09Ti-0.02Fe (wt. %) alloy subjected to various thermomechanical processing (TMP) have been investigated and compa

    Jan 1, 2018

  • CIM
    Controlled blasting practice at Cominco Copper Division's Valley Mine

    By J. Currie, J. McManus, R. Chenier

    "Cominco Copper Division's Valley Mine is located in the Highland Valley of British Columbia, approximately 275 km by air northeast of Vancouver. The nearest towns are Logan Lake, located IS km t

    Jan 1, 1985