Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Incorporating Operational Modes into Open-Pit Stochastic Mine Planning: An Optimization Using VND and LP
By Alessandro Navarra, Aldo Quelopana
For decades, open-pit mine planning algorithms have incorporated geological uncertainty and other elements or characteristics for increasingly realistic representations. Among these complexities is th
Jun 25, 2023
-
Applications of Digital Twin Technology in Productivity Optimization of Mining Operations
By Javad Sattarvand, Milad Ghahramanieisalou
As new technologies are introduced to the mining industry, the challenges related to their safe assimilation and the potential changes they bring to mining techniques necessitate adjustments to the cu
Jun 25, 2023
-
The Discovery and Development of Coal in South Australia
By Kwitko G
Exploration for coal has been on-going in South Australia for the past 100 years. During this period substantial resources of low rank coal have been delineated throughout the State. These deposits
Jan 1, 1992
-
Challenges with Density‑Based Grade Estimation at LKAB’s Underground Iron Ore Mines
By Anna Gustafson, Sohail Manzoor, Håkan Schunnesson
Sublevel caving operation relies on the estimation of ore grade at drawpoints, as the mine management uses grade to decide whether the material at a certain ring should be loaded or abandoned. Grade i
Oct 17, 2022
-
Assessment of Floor Heave Associated with Bumps in a Longwall Mine Using the Discrete Element Method (Mining, Metallurgy & Exploration)
By Bo Hyun Kim, Mark K. Larson
This study was developed as part of an effort by the National Institute for Occupational Safety and Health (NIOSH) to better understand rock-mass behavior in longwall coal mines in highly stressed, bu
Apr 14, 2022
-
A Methodology for Geometallurgical Mapping and Orebody Modelling
By L Keeney
Geometallurgy is not a mechanism designed to replace current geological and metallurgical deposit characterisation but an added component required to understand orebody variability. Current geological
Sep 5, 2011
-
Design and Construction of REM Tunnels and Underground Structures - RETC2023
By Verya Nasri, Agustin Rey
Once completed, the Montreal Réseau Express Métropolitain (REM) will be the fourth largest automated transportation system in the world. The REM represents construction costs of approximately 7.0 bill
Jun 13, 2023
-
Using the Digital Geologist to Count Cobbles at the RSC7 Tunnel - RETC2023
By Dan Preston, Shane Yanagisawa, Robert Marshall, Don Deere
Geotechnical Baseline Reports often estimate the number of cobbles that will be encountered in terms of volume or weight. These estimates are practically impossible to verify in the field. ClaroVia Ho
Jun 13, 2023
-
Planning for State-of-Good Repair, Hazard Mitigation, and Resiliency for San Diego County Water Authority’s 2nd Aqueduct Water Supply Infrastructure - RETC2023
By Paul Taurasi, Mahmood Khwaja, Anjuli Corcovelos, William Brick
California’s San Diego County Water Authority provides a safe and reliable water supply to more than 3.3 million residents through twenty-four member agencies. The 2nd Aqueduct pipelines, a critical i
Jun 13, 2023
-
The Woodsmith Project—Construction of the Access Shaft at Lockwood Beck Using Innovative Blind Boring Technique - RETC2023
By Cameron Dunn, Callum Fryer, Carmen Hu, Craig Sewell, Peter Stakne, Andrew Raine
The Woodsmith Project is located in north-eastern England within the North York Moors National Park. The strata contains the world’s largest known high-grade Polyhalite resource of around 2.66 billion
Jun 13, 2023
-
IC 7388 Home Insulation with Mineral ProductsConserves Fuel, Reduces Cost, Increases Comfort
By Oliver Bowles
The conservation of fuel became a critical problem during the recent war, particularly in the East. Fuel-oil supplies were short, the demands for coal increased, and householders were called upon to r
Oct 1, 1946
-
Cemented Rockfill Size Effect Study With Specific Focus On Different Sample Preparation Techniques - SME Annual Conference 2023
By T. Emery, D. Sweet, J. Bourgeois, B. Seymour, D. Porter
Cemented rockfill (CRF) is being used to backfill primary and secondary stopes at the Eagle Mine, an underground nickel and copper mine operated by Lundin Mining. National Institute for Occupational S
Feb 1, 2023
-
Numerical simulation of large-scale pillarlayouts
By D. F. Malan, J. A. L. Napier
A number of shallow coal or hard rock mines employ pillar mining systems as a strategy for roof failure control. In certain platinum mine layouts, pillars are designed to ‘crush’ in a stable manner as
May 3, 2023
-
Implementing and Improving the Mine Plan at the Mt Wright Project
By D MacKay
The Mt Wright Project is located near the town of Ravenswood in North Queensland and is operated by Carpentaria Gold – a wholly owned subsidiary of Resolute Mining Limited. Underground Development of
Mar 21, 2011
-
H3PO4 Production Process Utilizing Phosphatic Clay as Feed Material Mining, Metallurgy and Exploration
By Jack S. Watson, Rasika Nimkar, Robert M. Counce, Matthew Gordy, Patrick Zhang
Waste phosphatic clay presents a difficult disposal problem and a significant loss of P2O5. Recent developments make this study on the use of phosphatic clay as a feed material for H3PO4 production wo
-
Presentation of Certificate of Honorary Membership to Sir Ian McLennan, K.C.M.G., K.B.E.
By W. M. LONIE
Address by the President of the Institute (Mr W M Lonie) in making the presentation of the Certificate of Honorary Membership to Sir Ian McLellan, K.C.G.M, K.B.E. Address by Sir Ian McLellan after acc
Jan 1, 1979
-
In-Line Pressure Jig Preconcentration Plant at the Pirquitas Mine
By A H. Gray
Gekko Systems Pty Ltd engaged in the test work, design, manufacturing and commissioning of the pre-concentration plant at Silver Standard Resources Inc’s Pirquitas mine in the north western Jujuy prov
Aug 8, 2011
-
Long-Hole Drilling for Gas Emission Control at Appin Colliery NSW, Australia
By Saghafi A, Kelly M, Williams R. J
A two year program of research into the feasibility of long-hole drilling for improved gas emission control has been undertaken at Appin Colliery. State of the art equipment was employed involving
Jan 1, 1988
-
Western Ring Route – Waterview Connection: Calculation of Ground Settlements and their Effects
By J P. Burr
The Waterview Connection will complete a strategic Auckland motorway route linking the south, west and north. The project will include 2.1 km of ‘undrained’ driven tunnels, 500 m of drained cut-and-co
Mar 8, 2011
-
Use of an Online Elemental Analyser to Optimise the Sinter Process at ThyssenKrupp Steel Europe, Duisburg, Germany
By C Delwig
ThyssenKrupp specialises in the manufacture of high-grade steel-sheet products. Its main customers include the automotive, construction, household appliance, energy and packaging industries.At its wor
Jul 11, 2011