Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Impermeable Rock Groups Deformation during Partial Backfill Mining of Shallow Seam Mines
By W. Zhang
"Western China has many shallow coal seams. Mining of these shallow seams contributes to environmental deterioration in part due to disruption of groundwater sources. The lowering of the phreatic surf
Jan 1, 2015
-
Rock Mechanics in Open-Pit Mining
By Chas. L. Emery
"The laws of rock mechanics apply equally well to all rock structures, and open pits are not exceptions. The concepts and some arguments about the emphasis to be placed on various aspects of open-pit
Jan 1, 1966
-
The Square-Set Method of Stoping at Butte
By J. B. Mawdsley
From the view point of the mining engineer, the square-set method of stoping as practised at Butte, Montana, is one ?of the outstanding features of well conducted mining operations in that camp. The f
Jan 1, 1925
-
Design and Construction of High-Capacity Rock Anchors for the Willow Island Hydroelectric Project
By James M. Tantalla, Roderic A. Ellman, W. Allen Marr, Scott R. Bamford
"Construction of the powerhouse for the Willow Island Hydroelectric Project required a 100-ft deep excavation inside the limits of a cofferdam and embankment-seepage cut-off wall through soil and rock
Jan 1, 2017
-
Design Of Bearing Plates For Anchors In Geo-Application
By Andrew Baxter
This paper focuses on the design of steel bearing plates to transfer load from tiebacks and tiedowns to a concrete mass. It lists and describes the various available procedures for design of bearing p
-
The Paulsens Transformation – A Shining Light under a Northern Star
By C Jones
When the Paulsens operation was poised to be placed on care and maintenance, Bill Beament and the rest of the Northern Star Resources (NSR) team capitalised on the opportunity to send the Ashburton re
Mar 24, 2014
-
Processing Challenges ? Full Scale Plant Test Of Alternative Ore At The Empire Plant
By H. Walqui
The Empire concentrator currently processes magnetite ore from the Empire pit which is approaching the end of its mine life. Over the past two years plant wide tests have been run to access the plant
Jan 1, 2010
-
Resin-grouted cable supports for coal mine ground control
By S. C. Tadolini, J. M. Goris, J. L. Gallagher
Cable supports offer several advantages over traditional secondary support methods by enhancing stress redistribution to pillars and gob areas, minimizing or eliminating timbers and cribs that reduce
Jan 1, 1999
-
A New Metaheuristic Algorithm for Long-Term Open Pit Production Planning
By C Niemann-Delius
The problem of long-term open pit mine planning is a large combinatorial problem, which canÆt be solved easily by mathematical programming models because of the large problem size. In this paper a new
Sep 26, 2011
-
Sulphur In Western Canada ? Introduction
By Elgin D. Bell
Within the next, year or two, Western Canada should overtake Mexico and France. to become the worlds second largest producer of elemental sulphur, surpassed only by the United States, By 1965, it shou
Jan 1, 1963
-
BORE Bolt: No Milled Notch? No Hot Notch? No Problem
By Stephen C. Tadolini, Anand Bhagwat
"Intrinsic supports installed in mines with limited seam or mining heights have always proven to be difficult when the required support length is longer. To date, three solutions have been used to ens
Jan 1, 2018
-
Considerations in Blasting Influence on Grindability
By Panagiotis (Takis) Katsabanis, Lyall Workman, Jack Eloranta
The reduction of metallic ores to concentrate consumes a great deal of electrical energy. In the past two decades, a number of case studies have demonstrated a beneficial relationship between powder f
Jan 1, 2015
-
Interactions Between Cyanide Heap Leach Solutions And Acid-Rock Drainage: Implications For Remediation And The Potential Environmental Impacts Of Cyanide From Summitville, Colorado
By Geoffrey S. Plumlee
The Summitville gold mine, located in southwestern Colorado, received tremendous publicity in the 1980's and 1990's for leaks of cyanide solutions from its heap leach facility. As is typical
Jan 1, 1998
-
Application of Donnan Dialysis to the Separation and Recovery of Cations During Hydrometallurgical Recycling of Lithium Ion Batteries
By C. Alexandru Sonoc
Donnan Dialysis uses ion exchange membranes to extract and separate cations. The driving force is provided by differences in chemical potential, rather than by electric fields or pressure. A Donnan Di
-
Problems In Mechanization In Primitive Countries
By James V. Thompson
ENGINEERS from industrialized countries are frequently called upon to examine mining operations in primitive areas and make recommendations regarding mechanization and modernization. They often set fo
Jan 8, 1958
-
Evaluation of an E-field through-the-earth (TTE) communications system at an underground longwall mine in West Virginia
"A commercially available through-the-earth (TTE) communications system was evaluated at an active underground longwall mine in West Virginia. This TTE system uses electricfield (E-field) sensing to s
Sep 1, 2016
-
A New Technique to Determine Wettability of Powders-Imbibtion Time Measurements
By B. R. Mohal, S. Chander
"A new technique to determine wettability of powders is presented in this paper. In this technique the times for immersion of individual particles from air into liquids, defined as imbibition times, a
Mar 1, 1989
-
The Use of the Magnetic Defectograph, M.D. 6
By A. C. Ross
"The paper will deal with non-destructive testing in general, and its advantages to those responsible for the maintenance of wire rope. An outline of the main features of the M.D. 6 Defectograph will
Jan 1, 1969
-
Proactive Mineral Waste and Acid Rock Drainage Management at Rio Tinto
By R. K. Borden
Rio Tinto is committed to proactive mineral waste and acid rock drainage management. Corporate requirements are closely aligned with the GARD Guide principles of early geochemical characterization and
Jan 1, 2011
-
Willow Island Hydroelectric Project: Taming the Ohio River to Create Green Energy
By James M. Tantalla, Jr. Ellman
"Construction of the powerhouse for the Willow Island Hydroelectric Project, located at the Willow Island Lock and Dam, required a 120-ft deep temporary excavation inside the limits of a cellular coff
Jan 1, 2016