Search Documents

  • AUSIMM
    Improving the prediction of stope hanging wall dilution – a critical factor to the success of Dugald River

    By J Player, R de Vries, J F. Carswell, R Hassell

    "The feasibility of Dugald River mine was highly sensitive to mining and geotechnical design assumptions, particularly stope dilution and strike length. Following the start of initial mine development

    Oct 16, 2017

  • CIM
    Risk Weighted Cash Flow, a Communication Tool for Engineers and Financial Professionals on New Technology Projects

    By Mark Kennedy, Allan MacRae, Cameron Hams

    New technology projects, particularly those involving first-of-a-kind metallurgical facilities, have a poor track record of achieving their overall financial targets, as they incorporate technological

    Jan 1, 2011

  • CIM
    Pit Design by Computer at Gaspe Copper Mines, Limited

    By F. J. Gauthier, R. G. Gray

    "The possibilities of expanding the production rate from the Copper Mountain Mine have been examined using computer programs for analysing a complete range of data, beginning with the diamond drill as

    Jan 1, 1971

  • AUSIMM
    An Open Pit Multistage Mine Production Scheduling Model for Drilling, Blasting and Excavating Operations

    By S Q. Liu, E Kozan

    This paper proposes a new multiresource multistage scheduling problem for optimising the open pit drilling, blasting and excavating operations under equipment capacity constraints. The flow process is

    Nov 24, 2014

  • SME
    Performance Characteristics And Application Of Aerophine 3418A Promoter For Base And Precious Metals Flotation

    By P. A. Mingione

    AEROPHINE® 3418A is a unique sulfide mineral promoter produced by Cyanamid, based on phosphine (PH3) chemistry. It has proven effective as a collector for the sulfide minerals of copper and particular

    Jan 1, 1991

  • SME
    Effect Of Pillar Reinforcement On Long-Term Stability Of An Oil Shale Mine

    By J. F. T. Agapito

    Stability in Exxon's Colony Pilot Mine in the Piceance Creek Basin, Colorado has been monitored by periodic pillar stress-determinations End roof-to-floor convergence measurements since 1971. Pil

    Jan 1, 1985

  • SME
    Discharge Permitting And Environmental Assessment Issues Associated With Submarine Tailings Disposal For The Alaska-Juneau Mine Project

    By P. McGrath

    From the mid-1980s through 1997, Echo Bay Alaska evaluated reopening the historic Alaska-Juneau (AJ) gold mine. Their original proposed project underwent numerous modifications in order to minimize th

    Jan 1, 1998

  • AUSIMM
    Pit Backfilling - Managing Chemically Reactive Mine Wastes and Achieving Rehabilitation Objectives

    By A A. Puhalovich

    The placement of chemically reactive mine wastes in mined out pits (æpit backfillingÆ) is increasingly seen by industry as best practice to manage long-term environmental risks. This is primarily beca

    Jul 10, 2012

  • SME
    Choice of Pumping Pressure in Pre-Grouting in Scandinavian Tunneling Projects

    By Håkan Stille, Jalaeddin Y. Rafi, Fredrik Johansson

    "INTRODUCTIONIn tunneling projects, pre-grouting is performed with the purpose of establishing an impervious zone around the tunnel periphery. This is obtained by reducing the penetrability of the mos

    Jan 1, 2016

  • TMS
    Modelling and Appraisal of Tandem Wire Submerged Arc Welding for the Weldability of 25 mm Thick Low Carbon Steel Plate in Two Passes

    By N. S. Raghavendran

    Based on the weld pool length and width calculations due to an empirical model (1) for submerged arc weld metal, an elegant quantitative definition of tandem submerged arc welding is established. On t

    Jan 1, 1990

  • SME
    Development Of Sulfuric Acid-Oxygen Leaching For In-Situ Extraction Of Copper From Chalcopyrite

    By D. K. Dysinger

    The U.S. Bureau of Mines investigated leaching of chalcopyrite with sulfuric acid-oxygen under conditions anticipated during in situ leaching. A central composite experimental design was chosen to s

    Jan 1, 1993

  • SME
    Scale-Dependence And The Hydrologic Design Of In Situ Copper Leaching Operations (be2cf072-1593-4dc9-9358-22f8d51609c2)

    By Michael J. Friedel

    The scale-dependent hydraulic properties in a fractured porphyry copper oxide deposit are investigated for relevance to in situ leach mine (ISLM) design. In most well field designs, mine operators ass

    Jan 1, 1993

  • NIOSH
    IC 6810 Progress In Safety In Coal Mining In The United States

    By D. Harrington

    During the 5-year period 1906-10 inclusive, 84 major disasters (a major disaster being one in which 5 or more lives are lost) occurred in the coal mines of the United States, or an average of 17 per y

    Jan 1, 1934

  • AUSIMM
    The Implementation of Paste Fill at the Henty Gold Mine (e808b65b-096a-41b0-a461-dc39eb272114)

    By Jardine G, Woodall C

    The Henty Gold Mine, located in Western lasiuania use, uuiusatise solutions to effectively manage a mining operation in an environmentally sensitive setting and has been presented with several envir

    Jan 1, 1998

  • SME
    Micro-Pricing Optimization: Value-Based Partition Curve Analysis with Applications to Coal Separation

    By A. Noble

    "In coal and mineral processing, several numeric parameters are used to quantify the separation performance of unit operations. For density-based separations, the partition curve is used as the starti

    Jan 1, 2015

  • IMMS
    Deepwater Seafloor Resource Production ? Development of the World?s Next Offshore Frontier

    By Glen Smith

    Nautilus Minerals, the world?s leader in exploration and development of deep ocean seafloor resources, is today focused on the recovery of high-grade copper and gold in seafloor massive-sulphide miner

    Jan 1, 2010

  • SME
    The Geology and Mining Operations at Pacific Asbestos Corporation Copperopolis, California

    By G. W. Leney

    Introduction and Historical Background The office and mining operations of Pacific Asbestos Corporation are located near Copperopolis, California in the foothills of the Sierras about fifty miles eas

    Jan 1, 1972

  • SME-ICGCM
    Calibrating the LaModel Program for Shallow Cover Multiple? seam Mines

    By Morgan Sears

    The LaModel program (Heasley, 1998) is a displacement discontinuity, boundary element model (BEM) for analyzing stresses and displacements in single and multiple-seam coal mines. After the Crandall Ca

    Jan 1, 2013

  • AUSIMM
    Age-dependent Changes in Post-cracking Performance of Fibre-reinforced Concrete for Tunnel?Segments

    By E S. Bernard

    Toughness testing of fibre reinforced concrete (FRC) at 28 days age is typically undertaken as part of quality control for the many applications where fibres are used in concrete, including shotcrete,

    Sep 17, 2014

  • CIM
    Syncrude’s tailings management practices from research to implementation

    By B. R. List, E. R. F. Lord

    The Syncrude open pit mine, located near Fort McMurray in northeastern Alberta, produces approximately 410 000 tonnes of oil sand feed daily, which, after undergoing a bitumen extraction phase, genera

    Jan 1, 1997