Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Cliffs Robe River - The Success Story of an Australian Iron Ore Project
By D. M. Spratt, O. R. Bell
In Australia's remote northwest are located the operations of Cliffs Robe River, one of the world’s largest iron ore projects. initial project cost was $US300 million and required the constructio
Jan 1, 1982
-
Climax Conversion Practice
By E. S. Wheeler
THE conversion plant of the Climax Molybdenum Co. is at Langeloth, Washington County, Pennsylvania, approximately 30 miles west of Pittsburgh. The molybdenite concentrates converted originate in the c
Jan 1, 1944
-
Climax Crushing Plants - Jaw and Cone Crushers in Two Plants Prepare Ball-Mill Feed
By Coolbaugh, Franklin
CRUSHING of Climax mine-run ore is carried out in two plants: No. 1 plant (flowsheet in Fig. 1) has a capacity of approximately 5000 tons per day. It is used as a stand-by except when maximum producti
Jan 1, 1946
-
Climax Dedicates Acid Leach-Charcoal Adsorption Process For Moly Oxide Ores
A new $18-million hydrometallurgical ore treatment facility for the recovery of molybdenum oxide was dedicated at Climax, Colo., on November 19 by Climax Molybdenum Co., division of AMAX. The Company
Jan 12, 1966
-
Climax Milling Practice
By E. J. Duggan
THE mine and mill of the Climax Molybdenum Co. are at Climax, Colorado. Climax is on Fremont pass directly on the Continental Divide, at an elevation of 11,400 feet. DESCRIPTION OF ORE The Clima
Jan 1, 1942
-
Climax Milling Practice
By E. J. Duggan
THE mine and mill of the Climax Molybdenum Co. are at Climax, Colorado. Climax is on Fremont pass directly on the Continental Divide, at an elevation of 11,400 feet. DESCRIPTION OF ORE The Clima
Jan 1, 1942
-
Climax Molybdenum Company - Climax, Colorado
Molybdenum was first discovered on the Continental Divide in Colorado in 19 11; and in 1918 two companies, one of which was the Climax Molybdenum 250 stpd operation, were producing. In 1919 both mines
Jan 1, 1978
-
Climax Molybdenum Company - Henderson, Colorado
The Climax Molybdenum Company' s newest operation is the Henderson project, which is located on the east side of the Continental Divide. Ore reserves are estimated at more than 300 million tons a
Jan 1, 1978
-
Climax Molybdenum Section - Diversification
By Marvin L. Kay
In the spring of 1950, just two years after the inauguration of the domestic uranium program by the U. S. Atomic Energy Commission, the company entered the uranium mining and milling business through
Aug 1, 1955
-
Climax Molybdenum Section - Management
The Climax design is for the human being and his needs. Climax President Arthur Bunker has likened the high mountain operation to a giant, 250 million tons in weight, and 12 thousand feet high. No mat
Aug 1, 1955
-
Climax Molybdenum Section – Eastern Operations
In the late 19th century Fremont Pass was only a gateway to Leadville, Colo., 12 miles to the north. Some of the silver, lead, and zinc won from this famous camp crossed the Continental Divide at Clim
Aug 1, 1955
-
Climax Molybdenum Section – Molybdenum Mining
From 1917 to 1926 mining at the Climax Molybdenum Co. property was confined to the Leal and White levels at elevations of 12,145 and 11,935 ft respectively and to surface outcrops above the Leal level
Aug 1, 1955
-
Climax Moly’s 30,000 TPD Henderson Mill is Off the Drawing Board
By J. D. Vincent, Paul A. Weyler
Climax Molybdenum's plan for the Henderson 30,000 tpd molybdenite plant didn't just happen. It slowly evolved over a period of 3% years. Many plants cannot afford similar delays, but the Hen
Jan 5, 1972
-
Climax Ore Testing Program - Early Recoveries Have Been Increased Notably Through Regrinding and Reagent Developments
By R. E. Cuthbertson
AN early appreciation by the management that Climax ore presented a challenging problem of economic concentration was responsible for the establishment, in June 1926, of an ore-testing department at t
Jan 1, 1946
-
Clinton Iron-Ore Deposits In Kentucky And Tennessee.
By S. WHINERP
(Cleveland Meeting, October, 1912.) I AM indebted to L. E. Bryant, of Danville, Ky., President of the Virginia Mining Co., operating coal-mines in Scott county, Tenn., for the following information r
Oct 1, 1912
-
Closed-circuit Grinding of Cement Raw-Materials at Leeds
By T. B. Counselman
AFTER several years study, the Universal Atlas Cement Co. decided to rebuild its plant at Leeds, Alabama. The entire old plant, which was to operate during the new construction, was then to be scrappe
Jan 1, 1939
-
Closed-Circuit Grinding Of Cement Raw-Materials At Leeds
By T. B. Counselman
AFTER several years study, the Universal Atlas Cement Co. decided to rebuild its plant at Leeds, Alabama. The entire old plant, which was to operate during the new construction, was then to be scrappe
Jan 1, 1939
-
Closed-circuit Grinding of Cement Raw-Materials at Leeds (Technical Publication No. 1096)
By T. B. Counselman
AFTER several years study, the Universal Atlas Cement Co. decided to rebuild its plant at Leeds, Alabama. The entire old plant, which was to operate during the new construction, was then to be scrappe
Jan 1, 1939
-
Closing Date For Manuscripts, June 1, 1919
The Committee on Papers and Publications has set June 1, 1919, as the closing date for the receipt of manuscripts intended for the Chicago meeting, which is to be held in September, 1919. Manuscripts
Jan 4, 1919
-
Closing Date For Manuscripts, June 1,1919
The Committee on Papers and Publications has set June 1, 1919, as the closing date for the receipt of manuscripts intended for the Chicago meeting, which is to be held Sept. 22 to 27, 1919. Manuscript
Jan 5, 1919