Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Continuing Education for the Australian Mining Industry Workforce

    By T O Aspinall

    The Australian mineral industry involves a diverse range of expertise and skills. Within that, the mining industry, representing mine planning, mine management and equipment operation, has capital i

    Jan 1, 1994

  • AUSIMM
    Continuing Education in the Mining Industry

    Continuing education is recognised as an essential aspect of professional training, but no systematic procedures have hitherto been attempted. The tertiary educational institut- ions are making a va

    Jan 1, 1974

  • AUSIMM
    Continuing Professional Development for the Mining Industry - A Suggested Agenda for Action by the AusIMM

    By Pullen G, Rose M

    Continuing Professional Development (CPD) is not just a catch-cry. It is an essential component of every-day life in many professions, including accountancy, law and public administration. Without

    Jan 1, 1989

  • AUSIMM
    Continuity Risk in Narrow Reef Gold Deposits - Implications for Evaluation and Exploitation

    By I M. Platten

    Narrow reef gold deposits are generally less than 4 m in width and relatively complex geological phenomena. They often display variable geometry, attitude, continuity and internal architecture. Econom

    Jan 1, 2008

  • AUSIMM
    Continuous Assaying in a Copper/Lead/Zinc Mineral Flotation Pilot Plant Using In-Stream Analysis Instrumentation

    By Lovett EP, Johnson CR, Dunlop GA

    Seven streams of a low tonnage pilot plant operation on Cu/Pb/Zn ore from the Golden Grove Project were continuously assayed using an AMDEL In-Stream Analysis (ISA) system. The ISA instrumentation

    Jan 1, 1986

  • AUSIMM
    Continuous Carbon Concentration Measurement at Newmont Boddington Gold

    By C McCamley

    "The requisite for maintaining optimal carbon concentration levels in a carbon-in-leach (CIL) circuit is of paramount importance in the prevention of gold losses. The process’s ability to recover gold

    Oct 10, 2016

  • AUSIMM
    Continuous Casting of Steel in Australia

    In November, 1967, a four strand curved mould continuous casting machine coupled with a 50 ton basic oxygen furnace began producing billets for the rod mill and new merchant mill at the Newcastle S

    Jan 1, 1972

  • AUSIMM
    Continuous Control of Dense Medium Cyclone Separation Density

    By Horrocks KRS, Smitham JB, Ellison JF

    This paper describes the development and installation of equipment for continuously measuring separating density in the dense medium cyclone circuits of the four million tpa Port Kembla B/C plant co

    Jan 1, 1993

  • AUSIMM
    Continuous Haulage Prospects for Underground Coal Mines

    Detailed observations were made for two existing continuous miner and shuttlecar systems. A simple model for the shift average cycle consisted of three time components - delays, mining and transport

    Jan 1, 1982

  • AUSIMM
    Continuous Haulage the Coal and Allied Experience

    By Lennox A

    In an attempt to increase underground productivity Coal and Allied has introduced a continuous haulage unit into it's Moonee colliery. A second unit is planned for Nallarah colliery in the ne

    Jan 1, 1988

  • AUSIMM
    Continuous Hyperbaric Filtration of Copper Concentrates

    By Ehlert G, Steinlechner E

    The paper describes a new process for filtration which combines the continuous operation of conventional vacuum filters with the low final moisture contents hitherto only achievable with plate and f

    Jan 1, 1993

  • AUSIMM
    Continuous Improvement - How Changes in Metallurgy can have a Substantive Impact on Environmental Impact and Closure - Lessons Learnt from Environmental Auditing

    By G McMillan, P Mulvey

    "Geochemical characterisation is done based upon the geology and metallurgical batch testing prior to commencement of the operation of the plant.  Tailings repository design is based upon geochem

    Jul 15, 2013

  • AUSIMM
    Continuous Improvement and Technology Innovation on Nickel Production at Sumitomo Metal Mining Co, Ltd

    By Tsuchida N

    The history of world nickel production has been affected significantly by the supply and demand situation and fluctuation of LME price of nickel metal. In the beginning of the 1980s, the decline of

    Jan 1, 1996

  • AUSIMM
    Continuous Improvement at a Large Open Pit Operation

    One of the more recent developments within the mining industry has been the adoption of formal continuous improvement programs. A continuous improvement (CI) program was launched across Kalgoorlie Con

    Jan 1, 2004

  • AUSIMM
    Continuous Improvement at Pasminco Metals - Sulphide

    By Coates J. R, Firth I. C

    The Imperial Smelting Furnace at Cockle Creek, NSW, was constructed in 1961 and is the oldest facility using the Imperial Smelting process in operation. In recent years there have been significant i

    Jan 1, 1993

  • AUSIMM
    Continuous Measurement of Liquid Retention and Drainage in Porous Media

    The amount of liquid retained in a porous bed is determined by weighing a column containing the bed.The column is attached to the free end of a cantilevered beam, and changes in weight are determined

    Jan 1, 1968

  • AUSIMM
    Continuous Monitoring of Barometric Pressure in Deep Mines

    By J Krawcz, S Wasilewski, W Mironowicz

    Barometric pressure and its variation in deep underground workings have a considerable effect on ventilation conditions. Pressure changes which create transient states of air flow and air parameters i

    Jan 1, 2005

  • AUSIMM
    Continuous Monitoring of Mechanised Breaker Line Supports to Investigate Roof and Pillar Behaviour (11th International Conference on Ground Control in Mining)

    By Medhurst TP, Trueman R, Hutchinson IN

    A breaker line support (BLS) monitoring system, BLSmon, has been designed and constructed by the CSIRO and installed and commissioned at Laleham No.] Colliery, Queensland. This system was designed

    Jan 1, 1992

  • AUSIMM
    Continuous Monitoring Techniques for Environmental Control of Waste Water Discharge at Northern Territory Mine Sites

    By Mine F. J, Woods P. H

    The Top End of the Northern Territory lies in the monsoonal zone and receives rain during the November-April period. Initially, at the start of the wet season, rain storms are localised, but, follow

    Jan 1, 1994

  • AUSIMM
    Continuous pH and Pulp Potential Measurements During Complex Sulfide Ore Flotation

    Continuous pH and Pulp Potential Measurements During Complex Sulfide Ore Flotation

    Sep 13, 2010