Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Design and Operation of Gunpowder Copper Ltd's In Situ Leach-SX-EW Process

    The Mammoth Mine is located some five kilometres from the town of Gunpowder which is approximately 120 km north-west of Mount Isa in Queensland.

    Jan 1, 1993

  • AUSIMM
    Design and operation of large drum scrubbers

    By G S. Beros, K M. Edwards

    Over the past 20 years drum scrubbers have become a widely adopted technology within iron ore beneficiation plants. Generally, the drum scrubbers in use are considered high-capacity machines capable o

    Sep 18, 2023

  • AUSIMM
    Design and Operation of the Dewatering System for the Lochiel Trial Pit

    By Sullivan TD, Redman PG

    AND INTRODUCTION The Lochiel coal deposit, a large Tertiary soft brown coal deposit in the mid north of South Australia, is currently being investigated by the Electricity Trust of South Australia (

    Jan 1, 1988

  • AUSIMM
    Design and Optimisation of Cadia Hill Open Pit, Cadia Valley Operations, Newcrest Mining Limited

    By F Pothitos, S Hewson

    The geological and geotechnical conditions at the Cadia Hill Open Pit are very complex. This complexity coupled with high mining rates has required significant technical input into the design and opti

    Jan 1, 2003

  • AUSIMM
    Design and Rehabilitation of Large External Waste Dumps: a Case Study

    By Fletcher G

    This paper will outline the design process, and the constmction and rehabilitation techniques proposed for the external waste dumps associated with the mining of the Wolfang Basin coal measures.The ba

    Jan 1, 1992

  • AUSIMM
    Design and Scale-Up Criteria for Column Flotation

    By Mankosa MJ, Yoon R-H

    A reliable scale-up procedure for column flotation must address three important areas of column design, ie column geometry, sparging system and wash water distribution network. The column geometry i

    Jan 1, 1993

  • AUSIMM
    Design and Specification of Permanent Shotcrete Tunnel Linings

    By D Mather

    Fibre reinforced shotcrete has long been accepted as temporary ground support in both mining and civil tunnel linings. Greater knowledge and understanding of shotcrete as an engineering material and a

    Mar 8, 2011

  • AUSIMM
    Design and testing of high capacity surface support

    By T Roberts, S Talu

    Steel wire weld mesh is a common industry standard surface support used in underground mining, traditionally installed with mining drills during the bolting cycle. As underground mining depth and stre

    Nov 30, 2018

  • AUSIMM
    Design and use of Backfill for Support in Polish Coal Mines

    Over the last 100 years in the Polish mining industry considerable work has been done to assess optimum slurry, develop flexible delivery systems and adjust the fill technology to a wide variety of mi

    Jan 1, 1998

  • AUSIMM
    Design and Use of Backfill for Support in Polish Coal Mines (80b269b9-766a-4488-9ab9-f96403287b88)

    By J Palarski

    Over the last 100 years in the Polish mining industry considerable work has been done to assess optimum slurry, develop flexible delivery systems and adjust the fill technology to a wide variety of

    Jan 1, 1998

  • AUSIMM
    Design Approach to Assess Coal Mine Roadway Stability and Support Requirements

    By Fabjanczyk M. W

    The design of underground mine roadways (tunnels) requires a detailed understanding of the in situ stressfield, the rock failure modes, the performance characteristics of reinforcement or support memb

    Jan 1, 1993

  • AUSIMM
    Design Basis and Construction Experience for a Bolt and Shotcrete Lined Tunnel for the Wambo Rail Spur

    By I Chan

    The Wambo Rail Spur located near Singleton, New South Wales, Australia, runs for 14 km linking the Mt Thorley rail loop and running north-west alongside Jerrys Plain Road to the Wambo Coal Mine at War

    Jan 1, 2008

  • AUSIMM
    Design Concepts from an Operations View

    By Laffin N. W

    Invariably when a new plant is cammissioned operations personnel on takeover look at ways and means of reducing certain restrictions and improving process conditions. These improvements are general

    Jan 1, 1989

  • AUSIMM
    Design considerations for an iron tailings filtration plant and their conveying and disposal systems

    By C Garrido, J Barrera, H Alvarez, L Perez, S Ramirez

    In recent years, there has had a greater recurrence of studies and projects that consider tailings filtration followed by dry stacking to reduce the consumption of fresh water, the space required for

    Nov 8, 2021

  • AUSIMM
    Design Considerations for Artificial Support of Open Pit Walls

    By Dight P. M, Dugan K. J

    Design approaches for the artificial support of open pit walls have been reviewed and the main factors affecting support performance have been identified. An example of passive support in a potentia

    Jan 1, 1989

  • AUSIMM
    Design Considerations for Cable Truss Secondary Supports in Roadways of Underground Collieries.

    By Fuller P. G

    The purpose and current practice of cable trusses in underground coal mines is briefly outlined and details of various cable truss designs are presented. The main part of the paper describes the in

    Jan 1, 1992

  • AUSIMM
    Design Considerations for Reinforcement of Coal Mine Roadways in the Illawarra Coal Measures

    The application of reinforcement techniques to enhance the stability of underground coal mine roadways subject to high stresses is discussed. Research conducted in the Illawarra Coal Measures h

    Jan 1, 1986

  • AUSIMM
    Design Considerations for Smelter Gas Handling

    By M Devia, J Rapkoch

    This paper is intended to help design engineers, operating staff and plant managers understand the principles of metallurgical gas handling systems design. It also explains operating, safety and energ

    Jan 1, 2005

  • AUSIMM
    Design Developments of the Jameson Cell

    By S Bourke, R Stone, B Hill

    Since Jameson Cell flotation technology was first installed in a coal flotation application in 1988/89 at Newlands Coal Handling and Preparation Plant (CHPP) there have been fundamental improvements t

    Jan 1, 2005

  • AUSIMM
    Design Factors Leading to Prevention of Bridged Stopes at Jundee Operations

    By G Lind

    Bridging of production stopes in narrow vein gold deposits contributes to significant financial losses and production delays. Bridging is caused when underbreak in the stope production blast occurs, r

    Jan 1, 2008