  • AUSIMM
    Design, Commissioning and Operation of Elura's Larox Pressure Filters

    By Jagger ND

    Pressure filters were found to be necessary to produce Elura silver/lead and zinc concentrates at sufficiently low moisture contents for bulk cargo shipment by sea to smelters.The difficulty in obtain

    Jan 1, 1985

  • AUSIMM
    Design, Construction and Commissioning of A 4 Tonne/Hour Matte Fuming Pilot Plant

    By Lightfoot BW, Foo KA, Conochie DS

    Aberfoyle Limited operated a matte fuming pilot plant, incorporating a SIROSMELT furnace in 1980/81. This plant was a significant advance in both smelting and tin extraction technology. Important

    Jan 1, 1984

  • AUSIMM
    Design, Construction and Commissioning of the Ridgeway Concentrator Regrind Circuit at NewcrestÆs Cadia Valley Operations

    By F Cesnik, P Griffin, S Green

    In July 2004 a flotation concentrate regrind circuit was commissioned in the æHigh GradeÆ Ridgeway concentrator at NewcrestÆs Cadia Valley Operations. This was the culmination of two years of project

    Jan 1, 2005

  • AUSIMM
    Design, Construction and Performance of a Passive Treatment System for the Reduction of Acidity and Dissolved Metals in Acid Sulfate Soil Waterways

    By M D. Melville, B C. T Macdonald, T D. W

    The surface waters in regions with acid sulfate soils (ASS) can contain high concentrations of acidity and dissolved metals. These soils cause problems for agriculture, construction and development. T

    Jan 1, 2003

  • AUSIMM
    Design, Construction, Commissioning And Operating Of the Elura Concentrator

    By Morrison R. D

    This paper describes major events in the design, construction, camtissioning and operation of the Elura concentrator. It covers the period fran September, 1974 when laboratory testwork on drill co

    Jan 1, 1983

  • AUSIMM
    Design, Development and Operation of a Hardrock Roadheader

    By Bromley JC

    Eimco Great Britain, a division of Baker Mining Equipment Company, was contracted to develop a hardrock tunnelling machine in conjunction with British Coal. The objective: a machine to cut rock up

    Jan 1, 1987

  • AUSIMM
    Design, implementation and field performance of a face destress blasting method for mine development

    By E Villaescusa, C Drover, I Onederra

    Development face destress blasting is a construction technique in deep mining, which aims to prevent, reduce the frequency, or manipulate the timing of violent, stress-driven rock mass instability at

    Nov 29, 2022

  • AUSIMM
    Design, Inspection and Rehabilitation of the New Croton Aqueduct, New York City

    By A Fareth

    Constructed between 1885 and 1891, the New Croton Aqueduct (NCA) in New York State is a 50 km long (31 mi) brick-lined tunnel conveying water from the Croton watershed north of New York City to distri

    Jan 1, 2008

  • AUSIMM
    Design, Installation, Commissioning and Operation of Fine Grinding Technology at the Kevitsa Mine

    By B Nielsen, H Lehto, B Musuku

    "The demand for fine and ultra-fine grinding associated with the processing of more challenging, finer grained orebodies and the global driver of minimising energy consumption has been an increased fo

    Oct 10, 2016

  • AUSIMM
    Design, Lay-out, and Proposed Method of Working "John Darling" Colliery, Belmont, N.S.W.

    By Fallins J

    THE John Darling Colliery, owned by The Broken Hill Proprietary Company Limited, is situated 12 miles south of Neweastle, NSW and about 1 mile from the ocean. The area of the holding is approximately

    Jan 1, 1930

  • AUSIMM
    Design, Simulation and Operation of a New Generation of Column Flotation Machines

    By Gerasimenko MP

    The authors consider the features and advantages of a new promising trend in mineral processing - column flotation. Design aerohydrodynamic and process characteristics of pilot-scale columns are stu

    Jan 1, 1993

  • AUSIMM
    Designer - A Spreadsheet for Determining the Most Cost-Effective Explosive for an Open Cut Blast

    By Kleine T. H

    Blast design involves many engineering constraints and objectives. Some of the more important include the implementation costs, the desired fragmentation and shape of the muckpile. A spreadsheet has b

    Jan 1, 1992

  • AUSIMM
    Designer Tailings – An Integrated Model for Tailings Management

    By T Baumgartl, T Huynh, K Tungpalan, E Wightman, M Edraki, M Tayebi-Khorami, L Huang, S Palaniandy, E Manlapig

    With the increasing rate of tailing production worldwide there is a growing concern about the hazards of tailings storage facilities (TSF). Past and current mining, processing and waste disposal strat

    Jul 16, 2014

  • AUSIMM
    Designing a versatile, multimodal mine IoT system for accident prevention and emergency management in mines

    By D Zielinski-Nicolson

    The emergence of affordable, portable and versatile wireless devices has enabled a new frontier in mine safety equipment. Existing solutions provide methods for tracking personnel and assets in underg

    May 5, 2022

  • AUSIMM
    Designing and Delivering Explosives Systems and Solutions for the Underground Massive Mining Industry: The Next Five Years with Dyno Nobel

    The extraction of world-class mineral deposits using massive underground mining techniques is not an entirely new theme to world mining companies and experts. Previous MassMin conferences have helped

    Jan 1, 2000

  • AUSIMM
    Designing and Operating Backfill Systems on a South African Gold Mine

    For effective backfilling, a system with the 13 features covered under the section: effective backfill systems, is required. Effective backfilling cannot be done with systems that are badly designed,

    Jan 1, 1998

  • AUSIMM
    Designing and Operating Heap Leaching Processes with Both Eyes Open

    Process engineering principles are used to analyse the features of leaching processes for large masses of low grade, unprocessed ore. Different performance characteristics are related to the numerou

    Jan 1, 1994

  • AUSIMM
    Designing and Planning for Maximum Grinding Mill Availability - A Team Approach

    The mineral processing industry is in boom times. The focus on mill availability and therefore profitability has never been greater, as grinding mill maintenance often dictates the entire plant shut d

    Jan 1, 2008

  • AUSIMM
    Designing Energy Efficiency Assessments that Work - Thiess Australian Mining û Case Study

    By P Crittenden

    Thiess Pty LtdÆs Australian Mining business unit used 7.6 PJ of energy in the 2007/2008 financial year. This represented more than 85 per cent of Thiess Pty LtdÆs total energy use and therefore meant

    Jan 1, 2009

  • AUSIMM
    Designing Feedwells for the 21st Century

    In the current climate, there is a real need to bridge the gap between theory and the real world mining considerations, and develop viable, cost-effective, high performance thickeners. With a greater

    Jan 1, 2008