Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Improvement of the grade control procedure in open pit mine, at the Oyu Tolgoi copper-gold deposits, Southern Mongolia

    By O Otgonbayar, B Bayarmaa, D Batbyamba, S Amar-Amgalan, K H. Natsagdorj, J Nomin-Erdene, B Boldkhuu, T S. Sainzaya

    The Argyle deposit in the Kimberley region of Western Australia was the world’s largest accumulation of natural diamonds. Following its discovery in 1979, the mining of associated alluvial diamonds co

    Mar 22, 2022

  • AUSIMM
    Improvement of the Organized Management Structure System for Coal Mines

    The optimization of management structure systems for coal mines is undertaken with the use of economic and mathematical models of the monitoring, manufacturing, and functional subdivisions of the s

    Jan 1, 1977

  • AUSIMM
    Improvement Programs through Systems Management in Relation to Mine Development

    By Miller B

    General experience with improvement programs in the mining industry has been that, after some initial success, performance tends to deteriorate back to pre-improvement program level in a relatively sh

    Jan 1, 1998

  • AUSIMM
    Improvement strategies for accurate underground drilling and blasting effectiveness at the Barrick Kibali Gold Mine

    By F M. Senda

    This paper highlights strategies used at the Barrick operated Kibali Gold Mine (KGM) to improve the drilling accuracy and blasting effectiveness for longhole open stoping. The mine currently uses Solo

    Mar 29, 2023

  • AUSIMM
    Improvements in Bi-metal Production at the Brunswick Plant, Costerfield

    By V Cullinan, D Buchanan

    The Brunswick plant is located in Costerfield, approximately 40km east of Bendigo in central Victoria. Crushing, grinding, gravity gold concentration and flotation methods are used to produce a saleab

    Sep 7, 2015

  • AUSIMM
    Improvements in Blast Fragmentation Models Using Digital Image Processing

    By E Mofya, R Kaunda, P Lever

    One of the fundamental requirements for being able to optimise blasting is the ability to predict fragmentation. An accurate blast fragmentation model allows a mine to adjust the fragmentation size fo

    Jan 1, 2001

  • AUSIMM
    Improvements in Blast Fragmentation Using Measurement While Drilling Parameters

    An experienced drill operator is able to make a log of a drill hole defining physical properties of the earth such as hardness or structure as they vary with depth. This log is based on intuition or h

    Jan 1, 2001

  • AUSIMM
    Improvements in Blasting - An Indian Case Study of Surface Coal Mines

    By Pradhan GK

    Blasting is one of the most important operations involved in surface coal mining. The removal of over-burden waste in surface coal mines of India had experienced many improvements in terms of blasting

    Jan 1, 1991

  • AUSIMM
    Improvements in estimating strengths of loose tailings: results from the TAILLIQ research project

    By D Reid, J Vinod, M Rahman, A Fourie, T Vo, J Ayala, A Russell

    This paper reports on an industry and Australian Research Council funded research project, TAILLIQ, that is a joint initiative between four Australian Universities. The paper discusses the accuracy wi

    Jul 1, 2021

  • AUSIMM
    Improvements in Fine Coal Recovery at the Moura Mine of Theiss Dampier Mitsui Coal Pty. Ltd.

    By Rosentreter N

    Difficulties with froth flotation recovery and vacuum de- watering equipment for the treatment of fine coal have been investigated. Mechanical alterations to cyclone desliming banks, and flotation

    Jan 1, 1978

  • AUSIMM
    Improvements in Flotation Cell Maintenance, Power Consumption and Operation at South32 Cannington

    By M Bird, B Oats, M Sganzerla

    Mining operations are continually aiming to reduce operating costs to improve plant profitability. One way in which the Cannington operation sought to achieve this was by increasing the wear life and

    Sep 7, 2015

  • AUSIMM
    Improvements in Flotation Cell Operation and Maintenance at Newcrest Cadia Valley Operations

    Many parameters are important when considering the performance of a concentrator. These include metallurgical performance, such as throughput, metal recovery and final concentrate grade and operating

    Jan 1, 2009

  • AUSIMM
    Improvements in Process Control and Instrumentation at Batu Hijau

    By B Dunstan, F Wirfiyata

    PT Newmont Nusa Tenggara (PTNNT) operates the Batu Hijau copper and gold mine and process plant on the island of Sumbawa, Nusa Tenggara (Barat)  NTB, Indonesia. The plant consists of a nominal ca

    Jan 1, 2009

  • AUSIMM
    Improvements in Roaster Operation at Queensland Nickel Pty. Ltd.

    The Greenvale Joint Venturers, Metals Exploration Queensland Pty. Ltd. and Freeport Queensland Nickel Incorporated, use ten Herreshoff roasters, for the reduction of ground lateritic nickel and cobalt

    Jan 1, 1985

  • AUSIMM
    Improvements in Service Life and Cost Reduction for Gyratory Primary Crushers through Mantle and Concaves Optimisation – A Case Study

    By I Elias, E Moya, S Chaffer

    This paper is based on a case study from a mine site that operates two gyratory primary crushers. These crushers were encountering problems, which included inconsistent P80, reduced liner life tonnage

    Jul 13, 2015

  • AUSIMM
    Improvements in Sintering Practice at Cockle Creek

    By Coppock BW

    Sintering of lead and zinc concentrates is practised by Sulphide Corporation Pty. Limited to provide both desuiphurised lump sinter feed, for simultaneous reduction to zinc and lead in the Imperial

    Jan 1, 1972

  • AUSIMM
    Improvements in Stoping Methods at Mount Isa Mines Limited

    By Mathews K. E, Willstead T. V C

    Initial glory holing was followed by sublevel stoping, with a small proportion of total production mined by shrink and cut-and-fill methods.The sublevel stoping method was successfully modified to cat

    Jan 1, 1961

  • AUSIMM
    Improvements in Stoping Practice at the Great Boulder Proprietary Gold Mines Limited

    By Holly J

    The period following World War II has seen many changes in stoping techniques at The Great Boulder Gold Mine. The new methods resulted in improved unit production figures, and have given some relief f

    Jan 1, 1956

  • AUSIMM
    Improvements in Stoping Practice at the Great Boulder Proprietary Gold Mines Limited (83210faa-2bb5-4191-b836-252ff6995107)

    By Holly J

    Mr. Champness: I wish to congratulate the authors on their paper, which covers a large variety of subjects. Not every mine is in the fortunate position to effect cost reductions by the sinking of a ne

    Jan 1, 1956

  • AUSIMM
    Improvements in the Application of Water Cooled Tests for Cupellation

    Since the introduction of water cooled test rings the operation of cupelling retort bullion has not alone been sImplified, but has also been the means of concentrating the bullion for the fining test

    Jan 1, 1901