Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine using Cement Stabilisation

    By P R. Lock

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 km north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦ eas

    Jan 1, 1998

  • AUSIMM
    Maximising Recovery at Silver Swan Nickel Mine Using Cement Stabilisation (484a6aa7-9c11-440d-b7e3-51e52370c111)

    By Lock PR

    The Silver Swan nickel mine is located at the Black Swan Nickel Project, 53 kin north east of Kalgoorlie, Western Australia. The Silver Swan orebody is a massive sulphide nickel deposit dipping 70¦

    Jan 1, 1998

  • AUSIMM
    Maximising regional opportunities for in-pit tailings disposal for Queensland coalmines

    By K Baker, J Purtill

    One of the key challenges for the mining industry globally is the rehabilitation of mine waste, and Queensland is no exception. Out of pit waste structures including waste rock dumps and tailings stor

    Aug 2, 2023

  • AUSIMM
    Maximising resource utilisation in South Africa – the BIF story

    By A Singh, C Da Corte

    Banded Iron Formations or more commonly known as BIF are sedimentary rock formations with alternating silica-rich layers and iron-rich layers that are typically composed of iron oxides (hematite and m

    Nov 8, 2021

  • AUSIMM
    Maximising the Capacity of the Ore Handling Systems at Xstrata CopperÆs Mount Isa Copper Operations

    By G W. Croft, L E. Krause

    The current copper ore handling systems in use at Xstrata CopperÆs Mount Isa Copper Operations are up to 33 years old and have hoisted over 160 Mt at a rate of around 6 Mtpa. The mineÆs production pro

    Jan 1, 2005

  • AUSIMM
    Maximising the Operational Benefit of Capital Investment Via Computer Simulation

    In the minerals industry allocating capital for setting up a new project or for upgrading an existing facility usually requires that a compromise be found between the initial cost of equipment, its

    Jan 1, 1990

  • AUSIMM
    Maximising the Output of a Surface Bulk Air Cooling Installation on a South African Mine

    By T Baard, A Pieters

    This paper deals with the design and implementation of a 17 MW (nominal) surface cooling installation at Impala Platinum No 14 shaft located in Rustenburg, North West Province, South Africa.The coolin

    Jan 1, 2005

  • AUSIMM
    Maximising the value of a drilling program – case study in a challenging environment

    By A A. Latscha, D O’Connor

    Increasing orebody complexity, restrictions in ground access, and longer lead times for disturbance approvals, have generated the need for the Resource Development Team within Rio Tinto Iron Ore (RTIO

    May 24, 2023

  • AUSIMM
    Maximising the value of Rio Tinto’s Yandicoogina orebody – a mine geology perspective

    By A Kleinitz, J Halilovic, K Trappitt

    Mine operators use grade control to determine the destination of each block of material in the mine. In polymetallic mines, grades are best expressed in dollars: the Net Smelter Return, NSR, per tonne

    Mar 22, 2022

  • AUSIMM
    Maximising the Value of æA Wealth of InformationÆ

    By A Scott

    Long before a modern mine commences operations it has already become a wealth of information. After start up, it can generate enormous quantities of data û especially with semi-automated data acquisit

    Jan 1, 2002

  • AUSIMM
    Maximising Value Add from Collaborative Research

    The mining industry continues to faces significant challenges due to increasing resource constraints (quality of ore bodies, water, energy, human resources) and increasing license to operate requireme

    Sep 13, 2010

  • AUSIMM
    Maximising Value Through Maintaining Your Flotation Equipment

    By B Murphy, S O’Connell, J L. Heath

    In the 1989 best-seller The 7 Habits of Highly Effective People, the author, Stephen Covey, highlights the importance of maintaining not only ‘production’, but also, ‘production capacity’. When operat

    Sep 1, 2014

  • AUSIMM
    Maximum Panel Width Determination for Sub-level Caving with Bottom Ore Drawing

    By Adranyl W. W

    Sub-level caving with bottom ore drawing has gained wide acceptance in rich, soft, low magnetic iron ores because it provides moderate ore dilution and ore losses. The main problem here is the high

    Jan 1, 1995

  • AUSIMM
    McArthur River Mine Heavy Medium Plant – The Benefits of Applying Modern Coal Plant Design Principles to Base Metal Heavy Medium Separation

    By K Cameron, S Strohmayr, J Wallace

    In 2012, a single module heavy medium cyclone plant (HMP) was installed at the Glencore Zinc’s (then Xstrata Zinc) McArthur River lead zinc mine. The HMP formed the first part of the MRM Phase 3 Proje

    Sep 7, 2015

  • AUSIMM
    McArthur River Project

    Thank you chairman, good afternoon ladies and gentlemen. In my talk this afternoon I intend to cover a brief history, some of the recent experiences and an overview of the McArthur River project.If we

    Jan 1, 1993

  • AUSIMM
    McKee Memorial Address - Investment in Mining People

    Mr. Chairman, distinguished guests, ladies and gentlemen. Thank you for asking me to your conference, with its most fundamental and appropriate topic of 'Investment in Mining'. I must conf

    Jan 1, 1988

  • AUSIMM
    Measured and Modelled Response of a Multistory, Urban Structure to High-frequency Blasting Excitation

    By C Dowding, C Aimone-Martin, P Abeel

    This paper presents measurement and analysis of the dynamic response of a five-storey building to very high frequency excitation (>100 Hz) from blasting vibrations originating from a contiguous exc

    Aug 24, 2015

  • AUSIMM
    Measured Resources and Proven Reserves – Are they still Relevant?

    By S Juras

    The terms measured resources and proven reserves denote the highest level of estimation confidence in all of the major classification schemes. But what do they really bring to today’s project or mine

    Aug 22, 2011

  • AUSIMM
    Measurement and Analysis of Seismic Events in Deep-Level Coal Mine

    By Goto T, Sato K, Mori N

    A field investigation by making use of the seismic method has been carried out in order to comprehend the mechanism of rockburst and gas outburst and their predictive measures. The seismometers wer

    Jan 1, 1980

  • AUSIMM
    Measurement and Assessment of Bulk Explosive Products

    By G Cavanough, A Olsson, J Rock, A C. Torrance

    There are various methods currently in use to determine detonation performance of bulk explosive products including velocity of detonation (VOD), high speed photographic analysis, fragmentation analys

    Aug 24, 2015