Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    More than Coal Mining

    The energy supply in the 21st century is still secured by coal. According to estimates of the International Energy Agency (IEA), coal will have the same importance as oil for the world-wide supply of

    Dec 6, 2010

  • AUSIMM
    Moriarty was a Conglomerate – Experiences and Implications of Coal Mining under Massive Strata in the Newcastle Coalfield

    By M Creech

    During the 1990s, wider and more productive longwall panels were being introduced into the Newcastle Coalfield. The strata of the Newcastle Coalfield incorporate numerous massive sandstones and conglo

    Aug 18, 2014

  • AUSIMM
    Morning Star Gold Mine Recoverable Ore Reserves = Mining Geology + Practical Cents

    By M D. Goodz, Wright R. F

    This paper highlights the importance of accurate observational technical reports compiled by Mining Geologists and Engineers. Before uncovering the original reports in July 1992, all previous investig

    Jan 1, 1993

  • AUSIMM
    Morphological Characterisation of Spongillites from South-Eastern Brazil

    By A F. D C Varajpo, R C. Weba, C Volkmer-Ribeiro, C A. C Varajpo, N S. Gomes

    This study relates to the spongillite deposits from the region of Jopo Pinheiro, in the north-west of the State of Minas Gerais, south-eastern Brazil. The deposits occur in shallow ponds (with a maxim

    Jan 1, 2008

  • AUSIMM
    Morphology and Mineralogy of Shallow Submarine Hydrothermal Vents of the Calypso Geothermal Field, Bay of Plenty, New Zealand

    The Calypso geothermal field, mapped by the R V Sonne (cruise SO-135) in 1998, includes four main sites, the Northern Vent Area (centred on 37¦ 36.7'S, 177¦ 06.2'E, area 1.5 km2), Central Ve

    Jan 1, 1999

  • AUSIMM
    Morphology of Central Pacific Seamounts: Implication for MN-Crust Mining

    Studies of the morphology of seamounts within the Hawaiian, Line Islands, Gilbert and Phoenix Seamount groups indicate that the morphology and size distribution of seamounts vary significantly fr

    Jan 1, 1987

  • AUSIMM
    Morro do Ouro Geological Model with a Metallurgical View

    By Y Akiti, J Moller, E Esper, R Rugolo, A Pains

    "Morro do Ouro Mine is a high tonnage/low-grade mine located in Paracatu, Minas Gerais State, Brazil. The mines move around 55 Mt of ore per year at an average grade of 0.4 g/t. The auriferous mineral

    Sep 29, 2013

  • AUSIMM
    Morwell Open Cut: Mine Scheduling

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    Morwell Open Cut: Mine Scheduling (36eba653-885d-47b0-b25f-6e2b458bad34)

    By Brimblecombe P

    Morwell Open Cut is a continuous mining operation employing 5 buck- etwheel excavators, I bucket chain excavator and 54 conveyors. The combined bunkering capacity at both client Power Stations repres

    Jan 1, 1989

  • AUSIMM
    Motivation of Mining Personnel

    A review of the motivation of personnel in the open cut mining industry. The effect of social, geographic, environ- mental, organisational, union and other factors on employees' motivation as a

    Jan 1, 1980

  • AUSIMM
    Mount Angelo Copper Prospect, East Kimberleys, W.A.

    The Mount Angelo prospect outcrops as two copper rich gossans, the larger of which is 250 ft long and 70 ftwide. The mineralization is epigenetic and replaces part of a brecciated and disturbed lime t

    Jan 1, 1966

  • AUSIMM
    Mount Bischoff Extended Tin Mining Co., Waratah, Tasmania

    During August, 1926, with the consent of Mr. Schell, mine manager, the writer conducted a mill test on this company's concentrators. Mr. Schell not only gave him his permission, but rendered all

    Jan 1, 1928

  • AUSIMM
    Mount Carlton comminution circuit design, start-up and optimisation

    By B Putland, I Lovatt, D Schwann, A Cervillin

    The Mount Carlton project in Queensland's North East sits on a high-sulphidation epithermal style deposit rich in gold, copper and silver. Mt Carlton is an open pit mining operation with ore proce

    Aug 29, 2018

  • AUSIMM
    Mount Isa Copper Mines ù Role of the Mining Engineer

    By B J. Andrew, M R. Daley

    Mount Isa Copper Mines is a world-class mining operation producing approximately six million tonnes of ore per annum. With over 50 years of mining history and over 76 million tonnes of underground res

    Jan 1, 2005

  • AUSIMM
    Mount Isa Copper Mines ù Stope Design in the Southern Hanging Wall Lens

    XstrataÆs Mount Isa Copper Operations (MICO) is a world-class mining operation producing in excess of six million tonnes of copper ore per annum from its underground mining operations. The Mount Isa C

    Jan 1, 2006

  • AUSIMM
    Mount Isa Cut and Fill (MICAF) Stoping

    ABSTRACTMechanised cut and fill stoping in the Racecourse orebodies between II and 9 levels was started in 1964.Five stopes are in progress over the two level interval, extracting the full strike leng

    Jan 1, 1968

  • AUSIMM
    Mount Isa Minerals Province - A New Mining Cycle

    Recent mineral exploration successes in the Proterozoic rocks of the Mount Isa Inlier are unprecedented in the regionÆs history. This new era of discovery, particularly for æblindÆ deposits, owes its

    Jan 1, 1998

  • AUSIMM
    Mount Isa Mines - 1100 Orebody, 35 Years On

    By S DeKruijff

    The Mount Isa Mines Copper Mine in Mount Isa started producing copper in 1966. The Copper Mine gradually increased production rates to nearly six million tonnes per year. Over the last three years the

    Jan 1, 2000

  • AUSIMM
    Mount Isa Mines Copper Concentrator - An Insight into Current and Historical Practice

    By P Radulovic, W Y. Lui

    The Mount Isa Mines (MIM) copper concentrator at Mount Isa processes both chalcopyrite ore from the MIM underground mine and rotary holding furnace (RHF) slag from the MIM copper smelter. There have b

    Jul 15, 2013

  • AUSIMM
    Mount Isa Mines Limited Activities and Responsibilities Mechanical Engineering Department

    The organization of this department is as shown in the following chart:Chief Mechanical EngineerPowerGenerationWorkshopsNew ConstructionMaintenanceTransportCommunity ServicesMineMillSmelterDesign and

    Jan 1, 1953