Search Documents
Search Again
Search Again
Refine Search
Refine Search
- Relevance
- Most Recent
- Alphabetically
Sort by
- Relevance
- Most Recent
- Alphabetically
-
Nickel Metal from Sulphide Concentrates Without Smelters - A Yakabindie Process and Project Up-date
By Johnson G. D
Confidence in Yakabindie becoming a truly cost competitive nickel project has risen recently because of: ò the emergence of an economically effective contract mining climate; ò the delivery of cheap
Jan 1, 1996
-
Nickel Recovery from Nickel Refinery Waste Liquor
By Reid JG, Cutfield S
Considerable quantities of dissolved nickel are lost in the waste liquors from the QNPL nickel treatment plant. Cementation, precipitation and ion exchange techniques were investigated to reduce th
Jan 1, 1978
-
Nickel Slags from the Flash Smelter at Kalgoorlie, Western Australia
The mineralogy of nickel slags from the flash smelter of Western Mining Corporation Ltd. at Kalgoorlie was studied. Residual magnesium silicates in the sulphide concentrates raise the melting point of
Jan 1, 1976
-
Nickel-Iron Exchange in Pyrrhotite
The uptake of nickel into the lattice of pyrrhotite,Fel_oS has been studied experimentally in the temperaturerange 200 DC to 760 DC. Nickel from both aqueous solutionsand salt melts diffuses rapidly i
Jan 1, 1980
-
Nickel-Iron Exchange in Pyrrhotite (5214865a-3610-487f-bdc8-04dc3e1ec1a9)
The uptake of nickel into the lattice of pyrrhotite, Fe1 _1J S was studied experimentally in the temperature range 200°C to 760°C. Nickel from both aqueous solutions and salt melts diffuses
Jan 1, 1972
-
Nickel-Ore Formation in Island-Arc Magmatism, Kamchatka
By Grinenko VA
Mineralogical, chemical, and isotopic data have been obtained for samples from 11 volcanoes and 4 kortlandite intrusives on Kamchatka.Similarities and differences in ore-bearing and barren intrusives
Jan 1, 1990
-
NicolsonÆs Find Gold Project, East Kimberley, Western Australia
By M Csar
The Nicolsons Find gold project is located 35 km southwest of Halls Creek in the east Kimberley. It was discovered in the late 1980s by John Nicolson and Stuart Skoglund, when high grade gold minerali
Mar 26, 2012
-
Nifty - Hydrometallurgy in the Sand Dunes
By Connor J. W
Nifty Copper Operations was established to treat a copper orebody situated in the East Pilbara area of North West WA, located approximately 70 km west of Telfer in the Great Sandy Desert. The plant
Jan 1, 1996
-
Nineteenth Annual Report - 1984/1985
The past year has been a difficult one for the mining industry in this country, but an active and successful one for the Branch. Membership has continued to increase, albeit at a slower rate than last
Jan 1, 1985
-
No 3. Services and Surface Area
In the general planning of this area, provision was made for the distribution over the whole area as required of the following services:(a) Power and lighting from the substation distribution boards &
Jan 1, 1957
-
No assumptions, no surprises
By G Deans, M Longbottom
OZ Minerals’ Carrapateena mine is one of Australia’s newest ‘greenfield’ mining deposits. It will be a 4.25 Mtpa sub level cave underground operation, with an estimated mine life of 20 years. The inte
Jul 1, 2021
-
No Dam Leaks: The Challenge of Blasting the Warragamba Dam Auxiliary Spillway
By P Walton, L W. Armstrong, D P. Blair
Sydney is the capital city of NSW and has a population of approximately four million people. Eighty per cent of the cityÆs water is supplied by Warragamba Dam, which is situated some 75 kilometres sou
Jan 1, 2001
-
No entry mechanised presink of the Wira Hoisting Shaf
By D Kilkenny
This paper discusses the use of a mechanised shaft sinking machine Herrenknecht Vertical Shaft Sinking Machine (VSM) – to conduct the 93 m presink for the Wira Hoisting Shaft at the Prominent Hill Min
Mar 29, 2023
-
No Net Loss and Offsite Mitigation: Is New Zealand Mature Enough for a Win-Win Situation?
By S Christensen
In August 2001 the Minister for Conservation declined an application by GRD Macraes for an access arrangement to enable work at the Globe Progress Mine near Reefton. In her decision, Ms Lee said:æI ha
Jan 1, 2002
-
No. 2 Open Hearth Plant at Port Kembla
By Edmonds W, Jeffcoat R
The completion of the first two open hearth furnaces in the new No. 2 open hearth plant at Port Kembla will increase Australian production of steel by 350,000 tons of ingots per annum.The paper gives
Jan 1, 1957
-
No. 3 Breaker Station and Mullock Bin
When the new No. 3 Shaft is in full operation, the main hoisting duties will be in connection with the raising of: (a) ore from the various mining operations, and (b) mullock, or broken country rock,
Jan 1, 1957
-
No. 3 Changehouse
With the sinking of the No. 3 Shaft at North Broken Hill Limited, it was necessary to construct adjacent to the shaft a new changehouse for mining and surface personnel.It was also probable that as th
Jan 1, 1957
-
No. 3 Headframe
To finalise the arrangement and details of the headframe to be erected over the new No. 3 Shaft, the haulage and winding equipment requirements were first determined, then tentative designs were prepa
Jan 1, 1957
-
No. 3 Shaft Sub-Brace Area
With the sinking of the No. 3 Shaft and the erection of a changehouse nearby, a sub-brace level structure was provided incorporating a time office, underground foremenÆs office and lamp room, in conju
Jan 1, 1957
-
No. 3 Shaft Winders and Winder House
The sinking of the new No. 3 Shaft being mainly concerned with providing for the continuation of mining operations north of the existing workings, requirements for the shaft and haulage equipment were
Jan 1, 1957