  • AUSIMM
    Optimisation Improvements in Whittle using Stope Optimisation Software

    Mining One (M1) is often challenged with the task of evaluating deposits considering open cut and/or underground (UG) mining methods. In many near surface deposits a combination of both methods result

    Dec 6, 2010

  • AUSIMM
    Optimisation in Long Hole Stope Production Drilling

    By R LEATHAM

    Long hole drilling underground has come a long way since 'down the hole' surface drills were first taken underground. The underground miners have progressively developed the use of long ho

    Jan 1, 1992

  • AUSIMM
    Optimisation in Underground Mine Design

    Optimisation and sensitivity analysis of final pit limits is now an accepted procedure for open pit planning studies. Tools to assist the design engineer in an underground metalliferous mine to make

    Jan 1, 1995

  • AUSIMM
    Optimisation of a Semi-autogenous Grinding Mill through Trajectory and Power Modelling

    By P Toor

    Mill filling is an important operational parameter in a SAG mill circuit and by its control and optimisation it can produce significant improvements in production capacity and energy efficiency. Howev

    Sep 7, 2015

  • AUSIMM
    Optimisation of a Stochastic Rock Fracture Model Using Markov Chain Monte Carlo Simulation

    By D Wyborn, P A. Dowd

    The characterisation of rock fracture networks is an important component of rock engineering applications involving stability assessment or fluid flow analysis. However, the derivation of a reliable r

    Sep 26, 2011

  • AUSIMM
    Optimisation of an Image Analytical System for Bulk Materials Using the Theory of Sampling

    By K H. Esbensen

    Optimisation of a real-time at-line monitoring system for control of industrial granule coating quality is presented. The system is based on a fluorescence imaging system, because fluorescence origina

    Jan 1, 2005

  • AUSIMM
    Optimisation of Asanko’s Obotan SABC circuit to achieve ‘Project 5 Million’

    By R Bradford, W Gift-Agbey, T Vorster, P Morgan, E Grobler

    The Asanko Gold Mine in Ghana started processing ore from the Nkran pit in January 2016 at a production nameplate of 3 Mt/a. The flowsheet is a conventional SAG, ball mill and pebble crusher (SABC) w

    Aug 29, 2018

  • AUSIMM
    Optimisation of Ball Charge Kinetics in Ball Mills

    Research programs have established the correlation between the basic mill operating parameters such as: size of crushing products, number of mill rotation, ore flow and quantity of ore in the mill,

    Jan 1, 1993

  • AUSIMM
    Optimisation of Blasting in a Large Open Pit Mine

    By Miles M. J, Sandy D. A

    It has long been known that drilling and blasting operations have a direct influence over productivity and costs of subsequent operations. If mine management is to effectively optimise blasting oper

    Jan 1, 1990

  • AUSIMM
    Optimisation of cemented rock fill strength for open stope support

    By J Player, R de Vries, E Villaescusa, H Saw, R Hassell

    The use of cemented rock fill (CRF) for support of open stope walls has increased in the Australian underground mines operations over the last five years due in part to its low capital cost. In open s

    Oct 16, 2017

  • AUSIMM
    Optimisation of Circuits for Gold Pressure Oxidation

    By F Saloojee, F K. Crundwell

    Refractory ores need to be pretreated prior to cyanide leaching for acceptable gold recovery. Pressure oxidation is one method of rendering the ores more suitable for cyanidation. The focus of this wo

    Sep 26, 2013

  • AUSIMM
    Optimisation of Coal Production from Mine Face to Customer

    The technology of coal preparation, while based on similar processes to those in common useage in the 1950s, has improved significantly over the past 15 years primarily due to advances in process cont

    Jan 1, 1992

  • AUSIMM
    Optimisation of Complex Gold Processing Plants with Multiple Unit Operation Constraints – the Newcrest Planning Scheduler

    By D R. Seaman, R P. Tooher, B A. Seaman

    "Several mine scheduling tools exist for use in optimising and scheduling the reserve according to in situ value. These tools generally value the ore on a per block basis according to regressed recove

    Oct 10, 2016

  • AUSIMM
    Optimisation of constant rate of loading slurry consolidometer testing of fine-grained coal tailings

    By D J. Williams, S Islam

    Fine-grained coal tailings slurry undergoes only limited settling and self-weight consolidation, and tends to remain slurry-like and unsuitable for conventional laboratory consolidation testing. In ad

    Jul 23, 2018

  • AUSIMM
    Optimisation of Copper Electrowinning at BHAS

    By Mark C. J

    Since the commissioning of the BHAS Copper Plant in 1984 the copper electrowinning operations have not fully met expectations. During 1988, a laboratory scale electrowinning unit was constructed to

    Jan 1, 1989

  • AUSIMM
    Optimisation of copper treatment at Mount Isa Mines Limited

    By Canning RL, Pritchard J

    The surface treatment works in the Mount Isa Mines Limited copper stream consist of a concentrator and smelter with annual capacities of 5.6 million tonnes of ore and production of 155 000 tonnes

    Jan 1, 1986

  • AUSIMM
    Optimisation of Cut-Off Grade at Mount Isa Mines Limited Æs Enterprise Mine

    By G MacSporran, I Sheppard

    The practical application of LaneÆs theory on optimum cut-off grade policy has to date proved difficult for selective stoping in large-scale underground mining. The key to determining an optimum cut-o

    Jan 1, 2003

  • AUSIMM
    Optimisation of Cut-off Grades During Design of Underground Mines

    The theory of declining optimimum cut-off grades is more than 25 years old, but for a number of reasons it is still not widely used in industry. A lack of faith in the veracity of estimated grades i

    Jan 1, 1991

  • AUSIMM
    Optimisation of Drill and Blast for Mill Throughput Improvement at Ban Houayxai Mine

    By D Symonds, S S. Kanchibotla, L Kennelly, G McNamara, J Gaunt, B Adiyansyah

    Ban Houayxai is a gold-silver mine operated by Phu Bia Mining Limited in Laos since 2012. The first two years of operation processed predominately soft oxidised ore but subsequent years were expected

    Aug 24, 2015

  • AUSIMM
    Optimisation of Electrowinning Operations at Girilambone Copper Mine

    By Braaksma M, Dudley K

    The Girilambone Copper Mine is located in central New South Wales and has been operational since May 1993. Girilambone is operated by the Girilambone Copper Company (GCC) which is a joint venture b

    Jan 1, 1996