Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Optimisation of the Advanced Automation System at Inmet Mining's PyhSsalmi Mine, Finland

    Sep 13, 2010

  • AUSIMM
    Optimisation of the Drill Grid at the Weipa Bauxite Deposit Using Conditional Simulation

    By J Bower

    The JORC Code does not specify a definition for ælevel of confidenceÆ. The common approach in the mining industry is to use a certain drill spacing or number of data samples to classify resources by t

    Jan 1, 2009

  • AUSIMM
    Optimisation of the Milling Design of the Chessy Project Near Lyon, France

    By Gallet M, Watsford R. M S

    The 1989 feasibility study of the chessy, france, copper, zinc, pyrite and barite orebody was based upon a classical flowsheet. The flowsheet included, three stages of crushing, conventional rod and

    Jan 1, 1991

  • AUSIMM
    Optimisation of the Paste Fill Cycle at Angas Zinc Mine, Strathalbyn, South Australia

    By B Cook, M Karakus, J Light, E K. Chanda

    The aim of this research is to develop a model through which the appropriate paste recipe parameters, for example solid content and cement content, can be derived given the stope specific requirements

    Mar 24, 2014

  • AUSIMM
    Optimisation of the Peak Gold Mine’s Processing Plant through Advanced Process Control

    By J Hartog, V Beehan, D Beeson

    Treating an ore blend from five different deposits at Newgold’s Peak Gold Mine (PGM) has always been a challenge due to the inherent variability between each of the orebodies.Operating the processing

    Sep 1, 2014

  • AUSIMM
    Optimisation of the Performance of Flotation Circuits Using a Genetic Algorithm Oriented by Process-Based Rules

    Optimisation of the Performance of Flotation Circuits Using a Genetic Algorithm Oriented by Process-Based Rules

    Sep 13, 2010

  • AUSIMM
    Optimisation of the Prominent Hill Flotation Circuit

    By P Woodward, T Ly, N Muhamad

    OZ Minerals' Prominent Hill copper-gold concentrator is located 650 km north-west of Adelaide in the Gawler Craton of South Australia. The concentrator was built in 2008 and commenced commercial

    Jul 15, 2013

  • AUSIMM
    Optimisation of the Sepon Copper Milling Circuit

    By A Jakowetz

    OxianaÆs Sepon Copper Operation (part of the combined Sepon Gold and Copper Operation) is located in Savannaket Province, in southern central Lao PDR. The site is relatively remote, being some five ho

    Jan 1, 2006

  • AUSIMM
    Optimisation of Wash Water on an Iron Ore Spiral to Improve Grade

    By C M. Ramotsabi, F Bornman, W Erasmus

    Spiral concentrators are gravity based separation devices used for the preparation of coal, iron and heavy mineral ores (Wills, 1992). Gravity concentration remains the main separation method for fine

    Jul 13, 2015

  • AUSIMM
    Optimisation Opportunities for High Pressure Grinding Rolls Circuits

    By B Davis, A H. Benzer, A N. Mainza, C M. Evertsson, L M. Tavares, M M. Hilden, M S. Powell, C Rule, G Asbj÷rnsson

    The Mogalakwena North Concentrator of Anglo Platinum Operations was built with the capability to allow for future projected expansion. Several research groups, currently working with Anglo American on

    Oct 29, 2012

  • AUSIMM
    Optimised drill targeting using dynamic 3D modelling, Martabe Gold Mine, Indonesia

    By H Indirawati, R Ayres, A Nur Kasnanto, S Konopa

    As a project moves through the mine life cycle, the quantity of data available increases and the understanding of the orebody matures. Incorporating new information quickly and efficiently in current

    Nov 21, 2018

  • AUSIMM
    Optimised Process Control in Iron Ore via Online Analysis of Light Elements

    By L Köresaar, J Moilanen

    With lower and increasingly variable Fe grades in iron ore resources, the monitoring of Si, Al, Mg and other light elements to meet quality requirements is gaining importance in the iron ore beneficia

    Jul 13, 2015

  • AUSIMM
    Optimising a Combined Open Pit and Underground Strategic Plan

    By M Maulen, K van Olden, T Elkington

    A large open pit is planned at the site of an existing underground mine. Strategic planning work has been undertaken to investigate the project value associated with an expansion of underground operat

    Jan 1, 2009

  • AUSIMM
    Optimising a Mineral Supply Chain under Uncertainty with Long-term Sales Contracts

    By J Zhang, R Dimitrakopoulos

    A two-stage stochastic mixed integer non-linear program is formulated for a mining complex to optimise strategic and tactical plans. The objective is to find the near optimal decisions for a mineral s

    Nov 24, 2014

  • AUSIMM
    Optimising Assessment and Selection with Indigenous People in Remote Communities

    By P Davidson

    For many years, in numerous settings, the need for a language-fair and culture-fair assessment test has been identified as a significant issue for employment and selection for training of remote indig

    Jan 1, 2006

  • AUSIMM
    Optimising Blasting Operations through Rock Characterisation and Computer Modelling-Progress in Australia

    By Favreau RF

    Over the last 20 years the blasting industry has progressed from the stage of being artform to a science as it is today. The use of computers to simulate blasting results has allowed blasting engi

    Jan 1, 1986

  • AUSIMM
    Optimising Carbon Management – Increasing Gold Recovery and Decreasing Costs with the Carbon Scout

    By T D. H McGrath, O Baker, W P. Staunton, C Ypelaan

    "The carbon-in-pulp process has been used extensively in the gold industry since the late 1970s to recovery leached gold from solution. Despite more than 30 years of experience in operating carbon cir

    Oct 10, 2016

  • AUSIMM
    Optimising carbon reactivation kiln operation

    By R Bezuidenhout, J K. Claflin, S R. La Brooy, G M. Wardell-Johnson, A M. Claflin

    Best practice gold (Au) recovery is not an accident. It is the result of proper operation of the adsorption circuit using good quality activated carbon. A conventional carbon ‘regeneration’ kiln canno

    Sep 11, 2017

  • AUSIMM
    Optimising Coal Dust Suppression Factors in a Laboratory Using a Three-Level Factorial Approach

    By Tien J. C

    Many factors (type of coal mined, water pump pressure, wetting agent concentration, etc) will affect the performance of a dust suppression system using a water spray in an underground coal mine. Whi

    Jan 1, 1994

  • AUSIMM
    Optimising Coal Seam Preparation Operations with Dozers - an Important Phase in the Mine to Mill Chain

    By Scott A

    This paper summarises some of the results of the ACARP-JKMRC project 'Optimisation of Dozer Operations in Open Cut Mines'. The work has involved an industry review, design and conduct of f

    Jan 1, 1998