    Problems Associated with Sampling and Assaying for Gold in Mill Feed at Peko Mines Ltd.

    Prior to 1972, Peko Mines Limited at Tennant Creek used a central mill at Peko, which consisted of a gravity circuit, flotation and cyanidation of tailings, to treat their gold ore from surroundin

    Jan 1, 1978

  • AUSIMM
    Problems Due to the Introduction of Longwalls into Mines Previously Mined by Rooms and Pillars or Shortwalls

    The need for ventilation around mine workings derives from the various gases found in mine atmospheres and CH4, the principal diluent is in quantity depending upon several factors. Several of thes

    Jan 1, 1983

  • AUSIMM
    Problems Encountered in Dewatering a Nigerian Coal Mine

    The only functional underground Coal Mine in Nigeria is located in Enugu in Anambra State. For some years now the mine has been beset with a perenial problem of flooding. This has hampered produc- t

    Jan 1, 1988

  • AUSIMM
    Problems Encountered in the Control of Mount Isa Mine Concentrators

    By Brasnett TC

    A wide variety of problems are encountered on a day to day operating basis in the Isa Mine Concentrators. These vary from complex textural problems in the lead-zinc concentrator and their subsequen

    Jan 1, 1978

  • AUSIMM
    Problems in Formulating an Industrial Relations Strategy - A Management View

    During 1979 the writer had the privilege of interviewing about 50 people with varying degrees of involvement in the industrial arena and all of them in one way and another, had a part to play in th

    Jan 1, 1980

  • AUSIMM
    Problems in Resource Planning

    Until recently, the Australian mining industry received unquestioning encouragement from both State and Federal Governments. Now governments adopt a more questioning outlook about, for example, the

    Jan 1, 1977

  • AUSIMM
    Problems of Forecasting Metal Prices

    There are serious problems in forecast- ing accurately and achieving this goal depends on good quality information, correct assumpt- ions and sound analysis. planner. The forecaster must focus attent

    Jan 1, 1983

  • AUSIMM
    Problems of Magnetic Interpretation in Areas of Low Magnetic Latitude in Northern Australia

    By Webster SS

    This paper uses computer modelling tech- niques to compare and contrast anomaly patterns obtained with fluxgate (vertical field) and proton precession (total field) magnetometers at typical latitud

    Jan 1, 1975

  • AUSIMM
    Problems of Mine Water Drainage due to Damage to Hydrologic Amenities in a Coalfield-A Case of a Coal Bearing Area in India

    By Sinha DK

    Coal Mining in India had been confined in the past primarily to two or three coalfields. Unscientific mining has led to huge degradation of land including massive subsidence of strata and disturbanc

    Jan 1, 1988

  • AUSIMM
    Problems of Safety When Catastrophic Failure Arises at Mines

    This paper presents the results of studying the influence of catastrophic failures arising in mines, on the behaviour of mine ventilation systems. It is very important to take account of this influenc

    Jan 1, 2003

  • AUSIMM
    Problems of Sampling and Assaying in Mesothermal Lode-Gold Deposits ù Case Studies From Australia and North America

    By M J. Nugus, S C. Dominy

    Mesothermal lode-gold deposits often pose problems during sampling because of their complex and erratic gold grade distribution, and the presence of coarse gold. Effective sampling and sample preparat

    Jan 1, 2003

  • AUSIMM
    Problems of Secondary Breaking

    Experimentation with new methods, materials and machines to improve primary drilling and blasting is a continuing practice in the hard rock quarry operations of the BMI Group. These experiments wil

    Jan 1, 1978

  • AUSIMM
    Problems of the Slurry Shield Method and Their Counter Measures

    This paper first describes the essentials of the slurry shield method and its achievements, then problems encountered during driving tunnels and their countermeasures, and finally shows problems t

    Jan 1, 1976

  • AUSIMM
    Problems With Acid Rock Drainage Predictions at the Ekati Diamond Mine, Northwest Territories, Canada

    The Ekati Diamond Mine is located on permafrost terrain in CanadaÆs Northwest Territories. The mine rock consists of: diamond-bearing and barren kimberlite; and surrounding waste rock such as granit

    Jan 1, 2003

  • AUSIMM
    Procedure and Example of Grade Control in Open Pit Mining

    Grade control plays an essential role in the good running of a mine. The factors at play are many, starting from a good analysis of the geology and a correct sampling procedure. Once this is achie

    Jan 1, 1987

  • AUSIMM
    Process Alternatives to Recover High-Grade Iron Ore Concentrate from the Thickener Underflow Slimes of the Sishen Beneficiation Plant

    Kumba Iron OreÆs Sishen Mine is one of the worldÆs largest iron ore mining operations situated in the Northern Cape, South Africa. It produces 29 million tonnes of iron ore products per annum using a

    Jan 1, 2008

  • AUSIMM
    Process Amenability Studies on Goethite-abundant Iron Ore Fines

    By T Raynlyn, S Hapugoda, V Nunna

    The predominant phase in most Marra Mamba, channel iron deposits and detrital iron ore deposits is goethite. Goethite abundant iron ore fines tend to have complex mineralogical associations and fine d

    Jul 13, 2015

  • AUSIMM
    Process and Engineering Improvements Increase Production at Hamersley Iron's Pellet Plant

    By Lynch K. S, Street R. P

    Hamersley Iron's pellet plant at Dampier involves ore drying, dry grind- ing in ball mills, disc balling and, indurating by use of the straight grate system. After five years of operation, the

    Jan 1, 1973

  • AUSIMM
    Process Chemistry Studies of the Isasmelt Lead Reduction Process

    By Player R. L

    Measurements of the rate of PbO reduction from high lead metallurgical slags were made under laboratory conditions using graphite, a CO-50%CO2 gas mixture and metallic iron as reductants. The resul

    Jan 1, 1989

  • AUSIMM
    Process Circuit Developments-Wet High Intensity Magnetic Separator Plant, Hamersley Iron Pty. Limited Mount Tom Price

    As part of its Concentrator operation Hamersley Iron Pty. Limited uses wet high intensity magnetic separation to upgrade shaley low grade ore in the minus 0.5mm size range. Materials handling probl

    Jan 1, 1978