Search Documents

Search Again

Search Again

Refine Search

Publication Date
Clear

Refine Search

Publication Date
Clear
Organization
Organization

Sort by

  • AUSIMM
    Setting Plant Capacity

    The optimum plant capacity for a new mine is usually based on empirical studies or ærules of thumbÆ, subject to confirmation by detailed scheduling of the proposed mining operation. The mining industr

    Jan 1, 2002

  • AUSIMM
    Setting Processing Plant Projects up for Success in Australia

    By R Young

    Independent Project Analysis (IPA) is in the business of benchmarking the performance of capital projects on behalf of owner companies in the processing and extractive industries. IPA assesses between

    Aug 8, 2011

  • AUSIMM
    Setting Restoration Goals for Restoring Pit Lakes as Aquatic Ecosystems – A Case Study from Southwest Australia

    By E J. B van Etten

    Pit lakes may form when open cut mining leaves a pit void that then fills with ground and surface waters. This often replaces terrestrial ecosystems that existed prior to mining with an aquatic ecosys

    Oct 5, 2011

  • AUSIMM
    Settings and Styles of High-Sulphidation Gold Deposits in the Cajamarca Region, Northern Per·

    The Yanacocha district hosts the largest and most significant acid-sulphate, high-sulphidation deposits in Per· with total production, reserves and resources of over 27 million ounces of gold. Several

    Jan 1, 1999

  • AUSIMM
    Settling Pond Design and Construction for the Malvern Hills Coal Project, Canterbury

    The Malvern Hills coal project is now in an advanced stage of development with the stripping of overburden from above former underground workings in which a 3 m seam of subbituminous C coal with very

    Jan 1, 2003

  • AUSIMM
    Settling Pond Design and Performance - The Malvern Hills Coal Mine Experience

    By J F. Seale

    The design of the settling pond for the Malvern Hills opencast coal project was based on a primary requirement to control runoff and sediment generated from the immediate 6 ha mine catchment, which in

    Jan 1, 2004

  • AUSIMM
    Settling Velocities of Particles in a Hindered Settling Device

    Hindered settling devices (teeter bed, up-current) are widely used in the mining industry to classify mineral streams into various size fractions and to separate minerals. In the coal industry these d

    Jan 1, 2008

  • AUSIMM
    Several Approaches to Enhance the Bioleaching of Enargite

    Several Approaches to Enhance the Bioleaching of Enargite Some approaches were investigated to enhance the recovery of Cu from enargite by bioleaching with Acidithiobacillus ferrooxidans using the ga

    Sep 13, 2010

  • AUSIMM
    SEZ-GIS A Decision-Making Tool

    The city of Kalgoorlie-Boulder is located 595 kilometres east of Perth in Western Australia, and has a population of just over 30 000. Western Australia's third largest city lies on one of the

    Jan 1, 1998

  • AUSIMM
    Shaft construction at the Gold Fields Wallaby mine

    By J Graaf, R A. Murrell

    Gold Fields Australia is constructing two major ventilation shafts at the Wallaby gold mine in Western Australia. The new ventilation shafts are required to facilitate the long term ventilation strate

    Oct 16, 2017

  • AUSIMM
    Shaft Excavation Using the Borehole Rising Method

    This paper describes the excavation of No. 1 Power Station Lift Shaft at the Kiewa Hydro-Electric Project. The advantages and limitations of the borehole method are outlined, and general principles of

    Jan 1, 1959

  • AUSIMM
    Shaft Guide Reactions at No. 2 Ore Shaft Mount Isa Mines Limited

    By Mercer J. K

    Shaft guide reaetions in No. 2 Ore Shaft, Mount Isa Mines Limited, have been reduced to a low order of magnitude by the use of self aligning slippers and spring loaded guide rollers. Before commission

    Jan 1, 1961

  • AUSIMM
    Shaft Hoisting Based on Direct Torque Control Technology

    By Y Wu, F-J Ping

    Today, coal production accounts for about 65 per cent of the nationÆs gross energy in China. By the year 2010, the output of coal is planned to increase to 1.65 billion tonnes and by the year 2020 to

    Jan 1, 2005

  • AUSIMM
    Shaft Hoisting Safety-Myths, Facts and Practicalities

    The safety of mine winder systems with regard to overwind, underwind, rope factors of safety, winder brakes and the like is discussed. Many misunderstandings and poten- tially unsafe practices are

    Jan 1, 1984

  • AUSIMM
    Shaft in Rockburst Zone Cu-Ni Thierry Mine, Canada

    Shaft sinking through an amphibolite-granite rock mass experienced rock bursts on the shaft walls and benches. However, rock burst phenomena was exhibited only in granite, which is e1asto-brittle with

    Jan 1, 1982

  • AUSIMM
    Shaft Plumbing at Mount Isa

    In the plumbing of vertical shafts the methods employed and equipment used, are generally made to best suit existing conditions. Undoubtedly, there is no method that can be called standard or that can

    Jan 1, 1940

  • AUSIMM
    Shaft Plumbing at Mount Isa (665f189f-b324-4bcc-8bad-ef37a0685173)

    MR. E. J. HORWOOD wrote: In view of the difficulty of obtaining accurate results when using plumb lines in shafts, owing to the effect of currents of air, the writer, over M years ago, devised a metho

    Jan 1, 1940

  • AUSIMM
    Shaft Sinking and Drifting with Special Reference to Coal Mining in the Southern District of New South Wales

    Since the discovery of coal of the Southern coalfield (Illawarra 1797, Burragorang 1806) coal mining has grown progressively to the thriving industry of today. Early shallow escarpment mining requ

    Jan 1, 1976

  • AUSIMM
    Shaft Sinking at Foster - Kambalda Nickel Operations

    Western Mining Corporation began shaft sinking operations at it's Foster orebody, south of Kambalda, on the 20th June, 1984. The top levels of the orebody are currently being mined via a decline

    Jan 1, 1985

  • AUSIMM
    Shaft Sinking at the Cassidy Shaft Mount Charlotte

    By Doyle P, Mulroney D

    The Cassidy Shaft was sunk to access the Mount Charlotte and Reward Orebodies below the Flanagan Fault. The 1,184m deep shaft is concrete lined to 6.5m diameter for its full depth. The initial 590m wa

    Jan 1, 1985